2012 DRESDEN NUCLEAR POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE
UNITED STA"rES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
DRESDEN NUCLEAR POWER STATION
Dear Mr. Pacilio:
We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the Dresden Nuclear Power Station for March 2015.
In response, we have scheduled an initial licensing examination for the weeks of May 25 and June 1, 2015, at the Dresden Nuclear Power Station. On-site validation of this examination is tentatively scheduled approximately three weeks prior to the examination date.
We note that you were previously scheduled for an initial operator licenSing exam the weeks of October 14 and 21, 2013. These dates have not changed. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
The examination scheduled for 2013 will be written by the NRC in accordance with NUREG 1021, Revision 9, Supplement 1.
We understand that your staff will develop the 2015 examination unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
M. Pacilio -2 In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Sincerely, IRA by D. McNeil forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR 19; DPR 25 cc: Distribution via ListServ
M. Pacilio -2 In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Sincerely, IRA by D. McNeil forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR 19; DPR 25 cc: Distribution via ListServ DISTRIBUTION:
Daniel Merzke RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\OL EXAM CONFIRMATION LETTERS\DRE 060111 DRS OL.DOCX o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachmentlencIosure N" = N0 copy OFFICE Rill I Rill IN I I NAME RKWalton:co HPeterson DM for DATE 05/17/2011 06/01/2011 OFFICIAL RECORD COPY
wwv'I.exelol1corp.com Exelon Exelon GeneratJon 4300 Winfield Road Nuclear Warrenville, IL 60555 RS~10-130 July 28, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating license Nos, NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed) DPR~19 and DPR-25 NRC Docket Nos. 50-10. 50-237, and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-l1 and NPF~18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF~85 NRC Docket Nos. 50~352 and 50~353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50~,19 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR~56 NRC Docket Nos. 50-277 and 50~278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating license No. DPR-50 NRC Docket No. 50-289
July 28,2010 U. S. Nuclear Regulatory Commission Page 2
Subject:
Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator licensing Examinations," dated June 28,2010 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1
Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010*08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (10.2006) Estimated burden per res~onse to comply with lhls voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments rf.ardln~ burden estimate to the Records and FOIAJPrivacy Services Branch *5 F 3). U.S.
OPERATOR LICENSING Nuclear R~latory Comml$sion, Washington. DC 20555*000 , or b~ Internet e-mail to in coUects@nrc-g0v, and to the Desk Officer. Office at In ormation EXAMINATION DATA and Regulatory Affairs. NE B*10202, (3150*0131). Omce of Mansliement and Budget, Washington. DC 20503. If a means used to impose an Information collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection.
FACILITY NRC REGION Braidwood Station, Units I and 1 Facility Operating License Nos. NPF*nand NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 II A. PROPOSED EXAMINATION PREPARA1"ION SCHEDULE Cy 20t3 Cy 2014 Cy 1015 PROPOSED NUMBER CY 1012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 21H2 CylO13 Cyl014 Cy261S NUMBER OF REACTOR 0 OPERATORS 0 8 6 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 0 12 6 0 NUMBER OF SENIOR REACTOR 0 OPERATORS-UPGRADE 0 0 0 NUMBER OF SENIOR REACTOR 0 OPERATORS - LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/08/2614 N/A ALTERNATE DATE N/A 4/8/2613 115120)5 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 1013 PROPOSED ""- --
NUMBER MARCH SEPTEMBER DECEMBER JUNE MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010*08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMB: NO 3150'()131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per res~nse to comply with this voluntary informatton collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. is Information collection is used to plan budgets and resources for operator examinations. Send comments re~ardln~ burden estimate to the Records and FOIAlPrivacy Services Branch *5 F 3), U.S.
OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or brc internet e*mail to in ocollects@nrc.~v. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulat~ Affairs, NE 8*10202, (3150'()131). Office of Management and Budget. WaShington, DC 20503. If a means used to imposa an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information coliectlOn.
FACII-ITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 Cy 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LlCENSEE*PREPARED 1 J 1 J EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2013 CY 2014 Cy 2015 PROPOSED NUMBER CY 2012 NUMBER OF REACTOR 2 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 6 6 6
OPERATORS . INSTANT NUMBER OF SENIOR REACTOR 0 0 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 1123/2012 112112013 112712014 1119/2015 ALTERNATE DATE 1116/2012 1/2812013 1120/2014 1/2612015 C, PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 Cy 2013 PROPOSED -~-~".--
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 6 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010"()8 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-<3131 EXPIRES: 10/3112011 (10-2008)
Estimated burden per res~onse to comply with Ihls voluntary information collection requesl: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information conecllon is used to plan budgets and resources for operator examinations. Send comments rJlrardin~ burden estimate to the Records and FOlAiPrivacy Services Branch ~ *5 F 3), U.S.
OPERATOR LICENSING Nuctear R~ulatory Commission, Washington, DC 20555-<300 , Of ~ intemet e-mail to in oCOlleclS@nrc.sov. and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE B*10202, (3150*0131). Offoca of Management and Budget. Washmgton, DC 20503. if a means used to impose an information coliacUon does not display a currently valid OMB control number. the NRC may not conduct or s~sor, and a person is not required to respond to. the Information collect .
FACILITY NRC REGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket NO. 50461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy2012 CY 2014 PROPOSED NUMBER CY 2013
- CY 2015 ESTIMATED NUMBER OF L1CENSEE*PREPARED 0 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2012
- CY2013 CY 1014 CY lOIS NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 4 (} 4 0
OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 (} Z NUMBER OF SENIOR REACTOR OPERATORS
- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 08119/13 N/A 08117115 ALTERNATE DATE N/A 08126/13 N/A 08/24115 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20ll CY 2013 PROPOSED - -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 (} 0 (}
CANDIDATES NRC FORM 536 (10*2008) PRINTED ON RECYCLED PAPER
Attachment 4 E:xelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1
,..,RC FORM 53t u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB; NO. 3150-0131 EXPtRES; 1!J/31r.K111 (10-2008) Estimated burden fer res~onse 10 comply with thls voluntary Infonnatlon collection request: hO\lI. his inlormBlion COIieclllo i. used to plan budgets and resoW'C8$ for operator examina\lon$, Send comments re~ardlni burden OPERATOR LICENSING l estimate 10 Ihe Records and FOIA/Prtvecy S.",lcu Branch -5 F 3). U.S.
NUQ$81 ~UI$IOry CormIIsalon. Wa$hlngton, DC 20555-000
- Of bTc Intemel e-meillo In COIIei:lt@nrc'8llv, alld to Ihe Desk Offie.r, ON1ee of 10 OfmeUon EXAMINATION DATA and Regula:?; Alfm. NE 8-10202. (3150.()131). Offlce 01 Management and Budget. Wash ngton. DC 20503. If 1\ _ used 10 Impose an int_lIon collection cIoes not display a currently II3IId OMS coo!lol numbat', Ihe NRC may nol conduct or sponsor, and .. person Is nol reqUired 10 respond 10. the InfonnatiQtI co!ltldion.
F"'ClllTY NRC ReGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating Ucense Nos. DPR-19 and DPR-2S III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy10n Cy 2013 CY 1014 CY lOIS ESTIMATED NUMBER OF LlCENSEE-PREPARED I I I) I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy2013 Cy1014 PROPOSED NUMBER CY 201l
- - CyZ015 NUMBER OF REACTOR 5 4 0 4 OPERATORS NUMBER OF SENIOR REACTOR 7 7 t 7 OPERATORS" INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE
, 1 I) t NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
., 0 I)
PROPOSED DATES PRIMARY DATE 816/11 10/14/13 N/A 3/1115 ALTERNATE DATE 8nOl12 10/28113 N/A Jl13/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20lZ Cy 1013 PROPOSED ""~""-
NUMBER JUNE SEPTEMBER DECEMBER MARCH MARCH JUNE SEPTEMBER DECEMBER ESTIMATEO NUMBER OF 0 12 0 I) I) 0 0 lZ CANDIDATES NRC FOJ!!,! 538 (10-2008) PRINTED ON ReCYCl.EO PAPeR
Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150"()131 EXPIRES: 10/3112011 (10-2008)
Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinaliors. Send comments ~rdin~ burden eslimate to the Records and FOIA/Privacy Services Branch ( *5 F 3), U.S.
OPERATOR LICENSING Nuclear R~UlalOry Commission, Washington, DC 20555.Q001. or br.: inlernet e-mail 10 in OCollects@nrc.~v, and \0 the Desk OffICer, Office of In ormation EXAMINATION DATA and RegUla:r, Affairs, NE *10202. (3150"()131), Offlce of Management and Budget, Wash ng!on, DC 20503. If a means used to impose an informalior collectlon does not display a currently valid OMS control number, the NRC may not conduct or sponsor. and a person is not required to respond 10, the Infonnalion collecllon.
FACILITY NRC REGION LaSalle County Station. Units 1 and 2 Facility Operating License Nos. NPF-ll and NPF*18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 Cy 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LlCENSEE*PREPARED 1 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 CY 2013 CY 2014 Cy 2015 PROPOSED NUMBER NUMBER OF REACTOR 8 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 It 2 It NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 9/24/2012 N/A 10/1312014 N/A ALTERNATE DATE 10/1/2012 N/A 10120/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2011 CY 2013 PROPOSED - ....... ---
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC fORM 536 (10-2008) PRINTED ON RECYCLED PAPER
Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO. 3150-0131 EXPIRES: 10/3112011 (10-20001 Estimated burclen per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information coliectlon is used to plan budgets and resources for operator examinations. Send comments rerardlng estimate to the Records and FOIAIPrivacy Services Branch -5 F 3). U.S.
burden OPERATOR LICENSING Nuclear Re~uletory Commission. WaShington, DC 20555-000 ,or bi;; intemet a-mail to in OCOliects@nrc.goll, and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE 8-10202. (3150-0131), Offfce of Management and Budget, WaShington, DC 20503. If a means used to impose an infolTOation collection does not display II currently valid OMS control number. the NRC may nOI conduct or sponsor, and a person is not required to respond to. the Information collection.
FACILITY NRC REGION Limerick Generating Station, Units I and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PRE PARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 20t3 CY 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 Cy 2013 Cy 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 8 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 7 0 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 2 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/z014 N/A ALTERNATE DATE 10/15/2012 N/A 10/1312014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2012 CY 2013 PROPOSED -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10*2008) PRINTED ON RECYCLED PAPER
Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPRoveoaV0M8: NO.3150.o131 EXPIRES; 1013112011 (11).200II)
Estimated burden per res~onse 10 comply with this voluntary Informallon COllection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his informaUon coIIecbon III used 10 plan budget s and resouroes for operelOf examinations. Sand comments rr~ burden eslimalll to the Records and FOIA/Prlvacy S8IIIIcei Branch *5 F 3). U.S.
OPERATOR LICENSING Nuclear R:r!!Ofy Commisaion. Waahlf1QlOn. DC 20555-000 . or ~ Internet lHIlaU to I tllIl:tsctnrc.8t. and to the Desk offtcer. Office of In ormallon EXAMINATION DATA and RaguJato.rY Affairs. NE B-10202. (3150-0131). omce of Ma~nt an d Budget. W8Ii'Iington, DC 20503. If a means used to anpose an informallon collection does not display a currantly valid OMS control number. lIle NRC may not conduct or sponsor, and a person is not required to respond to, the informatIOn col!edoon, FACILITY NRC AEGIOI'I Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR*16 I NRC Docket No. 50-Z19 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CV 20U CV 2013 CV 2014 CV 2015 lICENSEE*PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRc-?REPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CV20U CY1013 CY 1014 CY 2015 NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 2 0 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2 0 5 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS *lIMlTED 0 PROPOSED DATES PRIMARY DATE 05129/2012 N/A 06102/2014 N/A AlTERNATE DATE 06/04/2012 N/A 0610912014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011 CY 20U PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 13 0 0 0 CANDIDATES NRC FORM 536 P0-2OOS) PFUNfEO ON RECYCLEO PAPER
Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 201 0..Q8 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO, 3150-0131 EXPIRES: 10131/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, his information collection is used to plan budgets and resources for operator examinations, Send comments r~arding burden OPERATOR LICENSING i estimate to the Records and FOIAlPrivacy Services Branch *5 F 3). U,S.
Nuclear R~ulatory Commission, Washington, DC 20555-000
- or brc inlemet e-mail to in ocollec's@nrc,~ov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulat~ A1fairs, NE B*10202. (3150-0131). Office of Management and Budget. Washington. DC 20503, If a means used to impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or 5£,onsor. and a person is not required to respond to. the information coIfee n, FACILITY NRC REGION Peacb Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LlCENSEE*PREPARED 0 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2011
- Cy2013
- CY 2014 CY 2015 NUMBER OF REACTOR 0 8 0 6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED
- SeeLGS
- SeeLGS
- SeeLGS
- SeeLGS PROPOSED DATES PRIMARY DATE N/A 211112013 N/A 2/9/2015 ALTERNATE DATE N/A 3125/2013 N/A 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ".-~
_ _ h _*** _ _
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 536 (10*2008) PRINTED ON RECYCLED PAPER
Attachment 9 Exelon Generation Company. LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO,3150-0131 EXPIRES: 1013112011 (1()'2008)
Estimated burden per response to comply with this voluntary informallon collectIOn request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, This InformatIOn collection is used to plan budgets and resources for operator examinations. Send CQmments r~ardlng burden estimate to the Records and FOINPrivacy Services Branch -5 F 3). U.S, OPERATOR LICENSING Nuclear R~ulatOry Commission, WaShington, DC 20555-000 , or br, Internet 80msll to in OCOliects@nrc.Oov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Mairs, NE 8-10202, (3150-0131), Office of Management and Budget, WashIngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or ~nsor, and a person is not required to respond to. the Information colle n.
FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR*30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2012 CY 2013 Cy 2014
- CY 2015 LICENSEE-PREPARED 1 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy2013
- CY 2014
- CY 2015 NUMBER OF REACTOR 4 5 0 5 OPERATORS NUMBER OF SENIOR REACTOR 9 5 0 5 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 I 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 3126/2012 9/23/2013 N/A 2/912015 ALTERNATE DATE 4123/2012 10114/2013 N/A 2/2312015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20U CY 2013 PROPOSED -_._
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 0 0 10 CANDIDATES NRC FORM 536 (1()'2008) PRINTED ON RECYCLED PAPER
Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011 (10-2008)
Estimated burden per res~onse to comply with this voluntary Information coltectlon request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardinR burden estimate to the Records and FOIAIPrivacy Services Branch -5 F 3), U.S.
OPERATOR LICENSING Nuclear R~ulatOry Commission, Washington. DC 20555-000
- or br, internet e-mail to in OCOllec!$@nrc'gov, and to the Desk Officer, Office of In ormadon EXAMINATION DATA and Regulatory Affairs, NE 6-10202, (3150-0131). Office 01 Management and Budget. Washington, DC 20503. If a means used to impose an information collection dOeS nOI display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person Is not required 10 respond to, the Information collection.
FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 I 1 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY2014 Cy2015 NUMBER OF REACTOR 4 5 4 6 OPERATORS NUMBER OF SENIOR REACTOR 5 5 6 OPERATORS - INSTANT 5
NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 02/612012 611012013 6116/2014 6/t5/2015 ALTERNATE DATE 02/13/2012 611712013 6/23/2014 612212015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED --.--
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 0 0 ., 9 0 0 0 CANOlDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 24.43 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 May 7,2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 1 AND 2 CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION
Dear Mr. Pardee:
In response to your letter dated March 18,2010, (SVPLTR: #10-0012), the initial license operator examination scheduled to start during the week of March 5, 2012, has been re-scheduled to start during the week of August 6, 2012. Similarly, in the same letter, your initial license operator examination, scheduled to start on March 4, 2013, has been rescheduled to start during the week of October 14, 2013. The on-site validation of the examinations will occur approximately 3 weeks prior to the examination start week.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations unless we determine the NRC needs to develop an examination. Because this examination has greater than ten candidates anticipated for the examination, the examination has been scheduled for two weeks. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date or the number of applicants declines below ten as this will impact the examination schedule.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
C. Pardee ~2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading~rm/adams.html{the Public Electronic Reading Room).
Sincerely,
~/!M(~(J;J Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50~249 License Nos. DPR-19; DPR-25 cc: Distribution via ListServ
C. Pardee -2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.govlreading-rm/adams.html(the Public Electronic Reading Room).
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via ListServ DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\DRE 05 11 DRS OL CONFIRMATION OF EXAM.DOC To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" =
No co OFFICE RIII:DRS RIII:DRS RIII:DRS NAME RKWalton HPeterson DATE 05/1 110 05107/10 OFFICIAL RECORD COPY
Exelon Generation Company, LLC www.exeloncorp.com Exelon@
Dresden Nuclear Power Station Nuclear 6500 North Dresden Road Morris, IL 60450-9765 10 CFR 50.74(a)
March 18, 2010 SVPLTR: #10-0012 Mr. Hironori Peterson, Chief Operations Branch U. S. Nuclear Regulatory Commission, Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249
Subject:
Initial License Operator Examination Dates
Reference:
Letter from Mr. Jeffrey L. Hansen (Exelon Generating Company, LLC) to U.S.
NRC, "Response to NRC Regulatory Issue Summary 2009-11, 'Preparation and Scheduling of Operator Licensing Examinations', II dated August 13, 2009.
In the referenced letter, Dresden Nuclear Power Station (DNPS) submitted the proposed schedule of Operator License examinations and Generic Fundamentals examinations for the calendar years 2010 through 2013. The DNPS Operations Training Manager has discussed with Mr. Dell McNeil a number of changes to the schedule provided in the referenced letter.
This letter documents those requested date changes.
- For the Initial Operator License Examination that is currently scheduled for 3/5112, we request that the date be changed to 7/23/12
- For the Initial Operator License Examination that is currently scheduled for 3/4/13, we request that the date be changed to 10/21/13 Should you have any questions concerning this letter, please contact Ms. Marri Marchionda, Regulatory Assurance Manager at (815) 416-2800.
Respectfully,
'-2~~...-cJVI Tim Hanley Site Vice President Dresden Nuclear Power Station MAR 2 4 20m cc: Regional Administrator - NRC Region III Senior Resident Inspector, Dresden Nuclear Power Station
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19. 2010 Mr. Charles G. Pardee Senior Vice President. Exelon Generation Company. LLC President and Chief Nuclear Officer (CNO). Exelon Nuclear 4300 Winfield Road Warrenville IL 60555 SUB..IECT: CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS
Dear Mr. Pardee:
In a letter dated August 13. 2009 (RS-09-109). your staff responded to Regulatory Issue Summary (RIS) 2009-11. and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19.2009 (U-603882).
Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18.2009 (U-603924).
Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6,2010 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 2011, 2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as "To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region III Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows:
Station 2010 2011 2012 2013 2014
, Braidwood N/R 06/20 N/R 03/25 N/R Byron 9/27 N/R 01/16 01114 01/27 Clinton 11/1 8122 N/R 8/19 N/R I Dresden 03/08 03/07 3105 3/04 N/R
! LaSalle 09/13 N/R 09/24 N/R I N/R Quad Cities N/R 5/30 3/26 TBD N/R N/R - None Requested TBD - To Be DetermIned On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
C. Pardee -2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.
Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.
Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.
A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Sincerely, IRA!
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ
C. Pardee -2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.
Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.
Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.
A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Sincerely, IRA!
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION:
See next page DOCUMENT NAME: G:\DRS\Work in Progress\Exelon 021910 DRS OLdoc To receive a COP) oftbis document, indicate in tbe box "e" = Copy w/o attach/encl "E" = COpy with attach/end "::"J" = No COpy OFFICE NAME RIII:DRS JKweiser:co T RIII:DRS DMcNeil I RIII:DRS HPeterson r I DATE 01125/10 02117110 02/19/10 OFRC~LRECORDCOPY
Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalie RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak
Exelon Nuclear 4300 Winfield Road N ear WarrenvIlle, IL 60555 RS"()9-109 August13,2009 U, S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 - F 'I ~ () J 9..
Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and §0-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 172009
August13,2009 U. S. Nuclear Regulatory Commission Page 2
Subject:
Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each ~
facility is provided on a separate NRC Form 536.
In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.
There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.
Je Man ger - Licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station
- Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1
Attachment 1 Response to RIS 2009-11 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112.011 (10*;.>008)
Estimated burden per res~onse to comply wilh this voluntary Information collection requesl: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments '1.rdlng burden estimate to the Records and FOIA/Privacy Services Branch *5 F 3). U.S.
OPERATOR LICENSING Nuclear R~ulalOry CommiSSion. Washington, DC 20555-000 ,or brc internet e*mait to in ocouacts@nrc'Bov, and to the Desk Officer, Office olin ormation EXAMINATION DATA and Regulatory Affairs, NE 8*10202. (3150-0131), Office of Management and Budget, Washmgton. DC 20503. If a means used to impose en information collection does not display II currently valid OMS control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the Information collection.
FACILITY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINA1"'ON PREPARAr'ON SCHEDULE CY 2010 CY 2011 CY 2012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LlCENSEE*PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 Cy2012 CY 2013 NUMBER OF REACTOR 0 7 0 5 OPERATORS NUMBER OF SENIOR REACTOR 0 12 0 12 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE N/A 06120/2011 N/A 03/24/2013 ALTERNATE DATE N/A 07111/2011 N/A 0410812013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 0 0 0 19 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCI.EO PAPER
Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 PO-20(8)
Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection Is used to plan budgets and resources for operator examinations. Send comments ffarding burden estimate to the Records and FOIAlPrivacy Services Branch -5 F 3). U.S.
OPERATOR LICENSING Nuclear R:;?UlatOry CommisSion, Washington, DC 20555-000 ,Of brc Inlernet e-mail to in ocollects@nrc.gov, and to the Oesk Officer, Office 01 In ormation EXAMINATION DATA and Regulatory Affairs, NE B-l0202. (3150-0131). Office of Management and Budget. Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sr.0nsof. and a person is not required to respond to, tlla information collect on.
FACILITY r-IRCREGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINA1"'ON PREPARATION SCHEDULE CY 2010 Cy 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS .
CY 2010 Cy2011 Cy 2012 Cy2013 PROPOSED NUMBER NUMBER OF REACTOR 8 0 0 OPERATORS 6
NUMBER OF SENIOR REACTOR 6 6 6 OPERATORS -INSTANT 8
NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 1 1 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS -LIMITED 0 PROPOSED DATES PRIMARY DATE 09/1712010 09/2612011 09/24/2012 0912312013 AlTERNATE DATE N/A 10/0312011 10/01/2012 10/0712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 Cy 2011 PROPOSED - _..- -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 6 0 0 0 6 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRC FORM 53& u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 0813112008 (6-2005) eallmated burden n' r.~n. . to comply with IIlIa voluntary Informati on
<XlIIeI;tlon requNl: hour. III Infonnllllon oollec1lon .. used to p'-" b\ldgehl and rellOl.lrCM for opar.tor eqmjnlllJona. Send CO_nil ~Id~bur<len
'alllnale to the Recorda and FOIA/Privacy S4II'\Ilcee Branch -5 F ). U.S.
OPERATOR LICENSING Nudear R~ulaliOfy CommI&.lon. Wuhlngton, DC 20555-000 ,or i1. Intemet
~.H to In ocolkli:t8Onrc~, and to the Oa. Ofllcer. 0ftIce of I onnllllo n EXAMINATION DATA and Reg= AffaIni, Nt: 10202. (315C).0131), Omc. of ~ an d BUdge!. With QIOn. DC 20503. If II mea". uSed 10 Impoee an information coIllIdIon don nol dlaplly
- cumlnlly valid OMB control number, the NRC may not conduc:t o~n.or. and I person la not required 10 r**pond to, th e information col
- FACIUTY NRC ReGION Clinton Power Station, Unit 1 Facility Operating Weense No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2010 CY2011 CY2012 CY2013 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 6 0 OPERATORS 6 6 NUMBER OF SENIOR REACTOR 4 0 4 OPERATORS -INSTANT 0
NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* UMITEO 0 0 0 0 PROPOSED DATES PRIMARY DATE 10l25I2010 1210512011 N/A 08119/2013 ALTERNATE DATE 11/0112010 1211112011 N/A 08l26I2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED ~
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES PRINTEO ON ReCYCLEO PAPER
Attachment 4 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10-2008)
Estimatedrequest collection burden 1per res~onse hour. his information with thisisVOfunla~~W;~~~~
to complycollection used to s and resources for operator examinations. Send comments re~ n estimate to the Records and FOIAlPrivacy SeMces Branch .
OPERATOR LICENSING Nuclear R~ulatOry Commission. Washington. DC 20555*000 ,or by' internet e-mail to in oCOliectS@nrc-g0v, and to the D@sk Offic@r, Office of In ormation EXAMINATION DATA and Regulatory AlI'airs, NE 8-10202. (3150-O131). Office of Management and Budget. Washmgton, DC 20503. If a means used to Impose an information collection does not display a currenlly valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond 10, the information collection.
FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR*25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LlCENSEE*PREPARED ] 1 t 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 2 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 6 4) 9 4)
OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 1 1 1 1 NUMBER OF SENIOR REACTOR 0 0 I}
OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 03/0812010 03/0712011 03/0512012 03/04/2013 ALTERNATE DATE 04/05/2010 04/04/2011 04/02/2012 04/01/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (1()'200!!) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection Is used to plan budgets and resources for operator examinations. Send comments rer+ardjn~ bunden OPERATOR LICENSING 1 estimate to the Records and FOIAlPrivacy Services Branch *5 F 3). U.S.
Nuclear Re?,ulalory Commission, Washington, DC 20555*000 . or ~ internet a-maillo in oColiects@nrc.~v, and to the Desk OffICer. Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE 13-10202. (3150-0131). Office of Management and Budget. Washmgton. DC 20503. If a means used to impose an Information collection does not display a currently valid OMS control number. the NRC may nol conduct or sponsor. and a panlon Is not required 10 respond to. the Information collection.
FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-ll and NPF-18 UI NRC Docket Nos. STN 50*373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2011 Cy 2012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2010 CY 2011 CY2012 CY 2013 PROPOSED NUMBER NUMBER OF REACTOR 3 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 11 0 8 0 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR 0 2 OPERATORS* UPGRADE 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 0911412010 N/A 09124/2012 N/A ALTERNATE DATE 0912112010 N/A 10/0112012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - -~
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (1()'2003) PRINTED ON RECYCLED PAPER
Attachment 6 Response to RIS 2009-11 Page 1 of 2
~.'0IUI53a U.I. NUCLEM REGULATORY COIIIIIIllON N'PROYEO BY OMS: NO.311JO.0131 EXPIRES: 1013112011 10.2001)
~ burdltn r:
coIIIc:IbI , . . . hour.
~ 10 -ply with " " voIumery information
..bnillllloll ~ III ..... tD pIiIn ~
-.I _ far opendor _ ........ ...., ~~buriMn OPERATOR UCENSING ......... 10 ... ~ -.I FOl~
. . . . . ~...... W~DC
.-m.II tD s.mc:.. er.nc:n
.or:z.=
-5 F ).
, -.I 10 lilt DellI 0ftIcIr. 0IIcI ~ I u.s.
EXAMINATION DATA and - = Q = 1 F ;(311JO.0131). 0IIcI u.:c==.-. I
~ w 201503.. _ ~
..... 10...-.. lb .
coIIiC:IIon doea nat
- cunW!IIy wild Ole conIIoI tUnbIr, . . HAC "lIlY not COnch.l~IIO', III'Id
- ptll'IOII Ie not IlIqUlred to ,.1fIOIMI1o. ItIe IntannMlan *
,1DUfY IIRC~
Limerick GeHntial Statio., Ualta I ad 2 FIIdIIty OperatIDl Licea.. Not. NPF*39 ... NPF-85 I NRC Docket NOI. 50-351 ad 58-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF ev lOll Cyl.ll CylOll
- evlO13 UCENSEE-PREPARED I 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPAReD EXAMINATIONS *
- 0 B. INITIAL OPERATOR UCENSE EXAMINATIONS CylO12 PROPOSED NUMBER ev 101. CylOll
- - evlO13 NUMBER OF REACTOR OPERATORS 6
- 11 0 NUMBER OF seNIOR REACTOR 7 0 5 0 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 5
- 1 NUMBER OF SENIOR REACTOR OPERATORS* UMITED * *
- 0 PROPOSED DATES PRIMARY DATE 10104llOIO N/A 1010112812 N/A ALTERNATE DATE 101181201. N/A 091l4JlO12 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2018 CY lOll PROPOSED - -
NUMBER MARCH JUNE ~EPTEMBER DECEMBER MARCH JUNE IsEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES I) 0 0 0 0 Ui 0
Attachment 6 Response to RIS 2009-11 Page 2 of 2 NRC FORM 536 U.s. NUCLEAR REGULATORV COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011
\10.20(8)
Estimated burden per re$~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his informatIOn collection is used to pian budgets and resources for operator axaminalions. Sand comments r~ardln~ burden estimate to the Records and FOIAIPrivacy Services Branch -5 F 3), U.S.
OPERATOR LICENSING Nuclear Ra~latOry Commission, Washington, DC 20555-000 ,or b~ intarnet a-mall to in ocollacts@nrc-g0v, and 10 the Dask Officer, Office of In ormalion EXAMINATION DATA and Regulat~ Affairs. NE B-l0202, (3150-0131~ Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or 8&00l10r. and a person is not required to respond to, Ihe informaUon celiac on.
FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-351 and 50-353 A. PROPOSED EXAMINA,.ION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 CY 2011 CY 20ll CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2010 Cy lOll PROPOSED NUMBER CY lOll CY2013 NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 OPERATORS-UPGRADE 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 8 PROPOSED DATES PRIMARY DATE 0611412010 N/A N/A N/A ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 20ll PROPOSED - -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (11)-2008) PRINTED ON RECYCLED PAPER
Attachment 7 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES; 10131/2011 (10.20081 Estimated burdlHl per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments rrdinB burden estimate to the Records and FOIAlPrivacy Services Branch *5 F 3), U.S.
OPERATOR LICENSING Nuclear R~ulatOry Commission, Washington. DC 20555-000 ,or brc intMnet
&-mail to in ocollects@nrc.gov. and to the Desk OffICer. Office of In ormation EXAMINATION DATA and Ragulatoili Affairs. NE 8-10202. (3150'()131). OffICe of Management and Budget. Wash ngton, DC 20503. If a means used to Impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or sFc0nsor. and a person Is not required to respond 10, the Information collect on, FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2011 Cy 2013 PROPOSED NUMBER
-- -- CY 2012 ESTIMATED NUMBER OF LlCENSeE-PREPAREO 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY 2012 CY2013 NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 7 7 8 0 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2 1 2 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 05/1712010 0711112011 0512812012 N/A ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY lOll PROPOSED -- --
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (ttl-200B) PRINTED ON RECYCLED PAPER
Attachment 8 Response to RIS 2009"11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10-2008) Estimated burden per res~onS8 to comply with this voluntary information coliection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardlng burden estimate to the Records and FOIAlPrlllscy $efllices Branch *5 F 3). U.S.
OPERATOR LICENSING Nuclear ReVculatOry CommiSSion, Washington, DC 20555-000 , or blt internet e-mail to in ocoliects@nrc.gov, and to the Desk Officer, Office 01 In ormetion EXAMINATION DATA and RegUlato~ Alfail'll, NE B-1 0202, (3150-0131). Office 01 Management and Budget. Wash nglon. DC 20503. If a means used to impose an Information collection does not display a currently velid OMS control number. the NRC may not conduct or ~onsor, and S f)erson is not required to respond to, the information colle on.
FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE cy 2010 cy 2011 cy 2012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cy 2010 CylOll CY2012 CY2013 PROPOSED NUMBER NUMBER OF REACTOR 0 6 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 10 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR 0 OPERATORS* UPGRADE 0 3 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED
- PROPOSED DATES PRIMARY DATE
- 01/31/2011 N/A 02/1112013 ALTERNATE DATE
- 03/2112011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 20ll PROPOSED - -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANOlDATES NRC FORM 536 (10-2008) PRINTEO ON RECYCLEO PAPER
- See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates
Attachment 9 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315O'{)131 EXPIRES: 1013112011 (1Q..200ll)
Estimated burden per res~onse to comply with this yotuntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments ~rdln, burden estimate to the Records and FOIAlPrivacy Services Branch *5 F 3). U.S.
OPERATOR LICENSING Nuclear R~ulatory Commission. Washington. DC 20555.{)OO ,or bt: internet e-mail to in ocollects@nrc.~v. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B*10202. {3t5O'{)131). Office of Mana~ement and Budget. Washington. DC 20503. If a means used to Impose an nformation collection does not display a currently valid OMS control number, the NRC may not conduct Or sponsor, and II person IS not required to respond to, the Information coliectlon.
FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciHty Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2011 Cy 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. I NITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 Cy2011 CY 201l CY2013 PROPOSED NUMBER NUMBER OF REACTOR 0 6 4 3 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 11 10 to NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS>> LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/1212012 0411512013 ALTERNATE DATE N/A 06113/2011 03/26/2011 04/29/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - -
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES NRC FORM 53t\ {1Q..2008) PRINTED ON RECYCLED PAPER
Attachment 10 Response to RIS 2009-11 Page 1 of 1 NRC FORM 531 U.S. NUClEAR REGULATORY COMMISSION APPROVED BY OMB: NO.3150'()131 EXP1RES: 1013112011
('0.2001) e,Umated burden per ,...~n** to comply willi thla voluntary Information COIIec:lIon reque.t 1 hout. Ia information <:OIIeetIon II ueed 10 JlI!In budge1 a and tesou,,*, for op.,.1or .l<IIIIIlnellonl. Send cornman.. ~~ buI'Oen eallmell to the Records and FOtAIPrtvacy Servlc:ea Branch -5 F 3), U.S.
OPERATOR LICENSING NudHr R:tolY Commlllllion, WaaIIlngII1n. DC 2~ , or ~IMerneI e-mail 10 In II~nn:8t, and 10 the DMk Olllctr, 0ftIee of I nnallon EXAMINATION DATA and Regu= Afl'a1rl HE 10202, (3150-0131), Olliea of MIUI~
Budget. Wa ngton 6C 20503. If * !Melli uNd to inpcte an cdltiCllon doea nol d!.Pi'jI a Cl.IITIInIV VIIIId OMB conlrOl n\mlw, \he NRC mey not condu~naor, and a pereon Is not requIred 10 respond to. th e information
- FACIUTY NRC REGION Three MDe Island Nudear StatloR. UDlt I FaeWty Oper.dDC LleeDse Ito. DPR-SO I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF cy 1010
-- CylOll
-- CylOll Cy 2013 LlCENSEE-PREPARED 1 1 0 1 EXAMINATIONS EsnMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy2011
- Cy2011 Cy2013 NUMBER OF REACTOR 1 10 0 OPERATORS 9
NUMBER OF SENIOR REACTOR 1 10 0 8 OPERATORS
- INSTANT NUMBER OF SENIOR REACTOR I 0 OPERATORS* UPGRADE 0 I NUMBER OF SENIOR REACTOR 0 0 OPERATORS
- LIMITED 0 0 PROPOSED DATES PRIMARY OATE 01/2111010 09/12/2011 N/A 09/0'11013 AlTERNATE DATE 0112812010 09/1912011 N/A 09/1612013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED --,-- ~,-.
NUMBER MARCH JUNE fsEPTEMBER DECEMBER MARCH JUNE fsEPTEMBER DECEMBER EsnMATED NUMBER OF %1 0 0 0 18 0 0 0 CANDIDATES NRC FORM 538 (10.2008) PRINTED ON RECYCt.ED PN'ER
October 7,2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS
Dear Mr. Pardee:
In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 200B, (KKM-OB-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region 11\
power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows:
Station 2009 2010 2011 2012 I Braidwood 10/05 N/R 6/20 NIR Byron NIR 9/27 9/12 9/10 I Clinton 8/24 NIR BI22 N/R Dresden 03/09 03/0B 3107 3/05 I
. LaSalle NIR 09/13 N/R 9/17 I Quad Cities 11/30 N/R 5/30 3/26 I N/R - None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.
C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner'S name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, IRA!
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station
C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, IRA!
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos, NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive
. lcate in t he box "e "= COPY Wi0 attachiencI T o receive a cop~ 0f thiS document, IDd' "E"e= OPY '
Wit h attac hiencl "N" = No copy OFFICE RIII:DRS I RIII:DRS I RIII:DRS I I NAME JKweiser:co DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD COpy
C. Pardee -3 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station B. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 cc: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager Licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Station Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director - Quad Cities Nuclear Power Station
Letter to Charles G. Pardee from Hironori Peterson dated October 7, 2008
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION:
Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRSIII Patricia Buckley Tammy Tomczak
Janet Kweiser From: Carmen Olteanu Sent: Tuesday, October 21, 2008 11 :22 AM To: Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrDirslrlb Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak
Subject:
Exelon Letter Re Confirmation of Initial Exam Attachments: Exelon 100708 DRS OL.doc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession
- ML082880559.
1
AmerGen~
An Exelon Company www.excloncorp.com Exelon AmerGen Energy Company, lLC Nuclear 4300 Winfield Road Exelon Generation Warrenllille.1l 60S55 4300 Winfield Road Warrenville,ll60555 RS-08-092 July 22, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555~OOO1 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF~ 72 and NPF* 77 NRC Docket Nos. STN 5Q..4§6 and STN 50-457 Byron Station. Units 1 and 2 Facility Operating License Nos. NPF*37 and NPF-66 NRC Docket Nos. STN 50*454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 5Q-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 _
NRC Docket Nos. 5()..237 and 50-249 .>
LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF*85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR*16 NRC Docket No, 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
July 22,2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR~29 and DPR-30 NRC Docket No§. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289
Subject:
Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator licensing Examinations," dated June 27, 2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010.
Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
In calendar year 2009, six candidates are expected to take the dual-site limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate.
There are no regulatory commitments conta1ned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.
Respectfully,
.~Yv1~L-Darin M. Benyak Director - Licensing and Regulatory Affairs
July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station
- Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for laSalle County Station
- Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1
Response to RIS 2008-16 Attachment 1 Page 1 of 1 NRC FORM SlIi tui NOCLF..A R REGULATORY COMMISSION APrIlO'lIlP flY OMB: NO. J I5<HlIJI EXPIRES: OtllJll.2fX)S III-liltS.
Estima,od burden per r"'I''' ttl ctlmp1f with this vol"mary inlil1malion
(.'()n'.:-ctlufl reque.'it: 1 rnl1.lt, This infhrmatlon cullect
- md rt'iOun.
- e~ 'fIr Hper!l!ol examinations. Send e~jm3te to Ihe Recur~s,and f{)IAlPrivacy Ser OPERATOR LICENSING el atlon EXAMINATION DATA ,J 150-0131~. OITo.:e or M.n.~e,!,.nt and
- \. If11 means used tu \mpnfte an lnfurmllt Jon colJe..:tiUil dues nnt di~la)' j'i curremly valid OMS cnntrol number, the NRC may
~u~ C()OO~, llr spo~n. and a pt'r:>un is, nut requWtd tu rf'spnnd 10, the Inlnnn:Ulnn (1Jll<<:tn.ffl.
FACILITY NRCREGJON Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY 2010 CY2011 CY2012 BSTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS FSTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY 2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 1 0 7 0 NUMBER OF SENIOR REACTOR OPBRATORS"INSTANT 12 0 12 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 1 0 2 0 NUMBER OF SENIOR REAL-'UR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/05/2009 NlA 6120/2011 NfA ALTERNATE DATE 10119/2009 N/A 7/1112011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER i;ECEMBER ESTIMATED NUMBER OF 0 0 0 0 21 0 0 0 CANDIDATES
Response to R1S 2008-16 Attachment 2 Page 1 of 1 NRC FORM SJ6 u.s NUCLEMt REGIJI.ATOR'II COMMISSION APPROVED BY OMB: NO. 31S0*0I:1I EXI'IRES: tlHl31 /1{MlI!
11l*2IIOSl Ef;limlll00 hurden ~r ""F.tX.'n.-.e to ~'nmpty with Ibis vokmtotry IU*'U'n1Ollinn cnl'ecHo" tt>qUeSl: I hour. 1lU!1. inlo~m;ttfOn cnUechnn is used to plan budgt'ts and feMmrets tllf (_per"I!';' examinatllms. Send comment'> reg:ndi~ bunIeD
.,,1m... ro (he Re..,,>Id. nnd I'OINPrI"""y Services Br.lJ1<'h (T*5 3), U.s, OPERATOR LICENSING Noc~u R:~~~Jat.'!fYCIJmmi"siuu. W;il'hiogfuTl.
c.. matlh
. el Om EXAMINATION DATA and Regulatory Affaini t NE vI' M~U'Jagemenl dOO fiudgd, W;t'ih1ngwn. DC lIl5OJ. If a means used to impo!e an infnrnlarion collecliun does not dhpfay a currently Wllid OMS ~t)ntrnl numbef, lhe NRC may r~lh'i::,~.~i,nJJc':::;.nnd a per " is no! required '0 respond II), the FACILITY NRC REGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF L1CENSEE*PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 0 9 0 7 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 8 12 6 NUMBER OF SENIOR REACJ'OR OPERATORS-UPGRADE 0 1 1 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATFS PRIMARY DAlE N/A 9/27/2010 911212011 9/10/2012 ALTERNATE DATE N/A 10104/2010 9/2612011 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cy2009 cy2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DF£EMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 17 0 0 0 12 0 0 CANDIDATES
Response to RIS 2008-16 Attachment 3 Page 1 of 1 NRC FORM 5341 U.S NUCLEAR REflUI.ATORV COMMISSION APPROVED RY OMS: NO, J 150-01)' EXPIRES: 0Ill311l00ll 18*1OOSI E>li""'ffl hurden per ""'P' "'" '0 comply wilh rhi, ""lumary information
\;nlle\:lKm request: 1 hl:lur. Th,:;: truhrma11nn collection 1$ used to pfan budgee.
1~~~.lliii~-
e<<lmllie (T*5 3), U.s, OPERATOR lJCENSING Nuclear I~Jl;rl~to:~~
EXAMINATION DATA }
Imi'O:~
Manngemellt and an mlormatK>n control number. the NRC may unt (:nuduet or l'ipUmior. Jt required to re~pnnd fO, lhe informal ion cnJbl11on.
FACILITY NRCREGfON Clinton Power Station, Unit 1 III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF UCBNSEB-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CYgQOO CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6, 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 6 0 3 0 NUMBER OF SENIOR REAcroR OPERATORS*UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8124/2009 NlA 812212011 N/A ALTERNATE DATE 8117/2009 N/A 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2Q09 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBEROP 0 0 0 0 0 9 0 0 CANDIDATES
Response to RIS 2008-16 Attachment 4 Page 1 of 1 NR(: FORM S16 u.s NIJCI.EAR REGlJl.ATORV COMMISSION APrROVED IlY OMB: NO. JIS!)'!)!)I EXPIRES: 08/.l1t:!(X)8 i8*lIIISI Eslfmaled burden ~ r~ponr.e ttl t'nmp'r wtth thi~ 'Voium.try infurmiltinn I.."ollectton requclJ": r tp,lut, TMl' int(mrullflH1 4:nftccli()11 i~ tt..ed tu plan budgets
~~~~~~*~~f~~~~rd~a:;Jr3:~;i~~~.~~":r;!'~~efi~~i~3ire:~.
OPERATOR LICENSING . DC 10555*0001. "r by IOto.".,!
EXAMINATION DATA u~d tn impt)sc an infonnatitln and cnJla::tinn cklt':l> not di;;.play rt currently vaJid OMS ("olltrol number. fhe NRC may not cnndm:t Or ~)n~or I and a per~m i~ no{ required In respond to, the tntlumation (;(;lltcliun.
FACIUTV NRC Jt EG ION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50~249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LlCENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAl\tflNATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 6 4 4 4 NUMBER OF SENIOR REAcroR OPERATORS*INSTANT 4 10 8 8 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 1 1 1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/09/2009 3/0812010 3107/2011 3/05/2012 ALTERNATE DATE 4/0612009 4/05/2010 4/04/2011 4/0212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 Cy2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEFl'EMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 14 0 CANDIDATES
Response to RIS 2008-16 Attachment 5 Page 1 of 1 NRC FORM 5J' U.S NUCLEAR REGULATORY COMMISSION ,\!,I'ROVIlD BY OMIl: NO. 315IMIDI EXPIRES, 0lV3112001l (8*zoe5)
R\tim;tfffi burden p!'f rc::.ptlnse 10 l'umpl)' wifh Ihh. vol~nlAry inthrm:Uiun CI)Jlet:lioll request: I hour. 'fbi;; i:nhif!llalton ~nf1<<l;nn IS bseU It) prao budget....
and rel(lUr<t~ for "I"'!1Ilnr examm:lnoos. Send (m~l1Is regul'di~ burden e>tim.le 10 rhe Records ,od F01NPrivocy ServICe' Ilra""h IT*S .3). lJ s.
OPERATOR LICENSING EXAMINATION DATA ~~1~~:¥~~~i~f~i~;~Nfin~nn. DC.20555 ..I~II. (~b~ jnt~mel In 'lrmatmn
',(3150-11131). Otl;"'nfMDlIllgement..,d me~l'ls; u~d to impo~ an information cHll6:tJon doc~ not di\play J L"Ufl"Ctllty \'J:.kl OM8 tnmnll number the NRC may
~ot cundm:r or !'p.tnMH', and il persno k nOl required to re~p()l'ld to: the Informal tun <-'lJlttx"tiun.
FACILITY NRC REGION laSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF~11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY 2011 CY2012 ESTIMATED NUMBER-OF LICENSEE*PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY20Q9 CY 2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 0 4 0 4 NUMBER OF SENIOR REAcroR OPERATORS-lNSTANT 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 2 0 2 NUMBER Of SENIOR REAcroR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NlA 9114/2010 N/A 9/1812012 ALTERNATE DATE N/A 9/21/2010 N/A 9/2512012 C. PROPOSED GENERIC FUNDAMENTAlS EXAMINATION (GFE) SCHEDULE Cy2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPT'EMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 0 0 0 0 0 CANDIDATES
Response to RIS 2008-16 Attachment 6 Page 1 of 1 NRC FORM 5lli u.s NUCLEAR REGtJLATORV COMMISSION APPROVED BY OMB: NO. JI51).()l31 EXPIRES: (llVJ II1fIOK 111-:111851 l-:'\tlmated burden per reliponr.t' fo cumply with Ihis vuluntaty inthrmllt ion t.:oUtX'uun request: I hour. Thi!> inthrmaunn l'HIIct.~Hon j .. used In pbn budgets
.1m! rCM,l1,ln.:($ fhr operOOlf examjn:ttit~tt.;. Send <:(}mments regard;W! ourden 1.":'(ltruite in the Recl1l'd" a~ F~IAlPnv.acy Servkes Branch rr <; .3). U.s.
OPERATOR LICENSING
'he Dei.k ()ffM.~r. orrIC~ *(;?,~1tl~~;~~
EXAMINATION DATA ". (3150*/1131). OIl".
If .. Illeafl,"i u~IIO impo,~
"r M.nil~ement and an intllrmotion currently valid OMS c(mtml number. the (IIRC Inoy
~J! culld~1 flr ,"PC1I'!Sur. aM a per:;t)f) ~ lKll required lO respond UI, lhe uUonnatlon coUect,nn.
FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS
'" 1 0 1 ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAM INAnONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 0 6 0 4 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 2 0 3 NUMBER OF SENIOR REACTOR OPERATORS* LIM ITED 1f 0 a 0 PROPOSED DATES PRIMARY DATE '" 10/04/2010 N/A 10/08/2012 ALTERNATE DATE '" 10/18/2010 NlA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 16 0 0 0 0 0 0 CANDIDATES
- See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates
Response to RIS 2008-16 Attachment 7 Page 1 of 1 NRCFORMS~ u.s NlICI.EAR REGULATORY COMMISSION APPROVED BY OMS: NO, JI50-0131 EXPIRES: ()RO I/:!OO!I (fl.2O!IS) 13<1 irna,lf<! burden per ",sponse III mrnply wil h Ihi> .olunlary inf"rmm~'n eolJet'tlon request: I hnur. Th.s intitrmatKln collection IS 1Is.ed' It) plan budg~s
- J~ rtsmm'e" for npernlllf e~a . .
estimate tu the Ret:tlfds an~
OPERATOR LICENSING 0, J
- and tH1he Desk OtJicct. Office f)l' In rmatioJ)
EXAMINATION DATA 'IO~l)1. OISO-OI3I). ()ff"",,,fMa",,!!emelll and a~t. Wa5Itnn£:oou. DC ::050]. If It mea"~ u~d ft) impose an infimnatioll wllecU"n docs nUl display. turrerulx wild OMI! tnntml number. the NRC moy nut IxmaUCI Of .;poosnr. 300 a perMUl lli- nOI requftd to respond ;0. the mthnnalMm cullectlon.
FACILITY NRCR£GJON Oyster Creek Nuclear Generating Station I Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2010 CY2Q11 CY2012 ESTIMATED NUMBER OF LICENSEE*PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY201Q CY2011 CY2012 NUMBER OF REAClDR OPERATORS 6 6 6 0 NUMBER OF SENIOR REAClDR OPERATORS.INSTAl'IT 10 8 10 0 NUMBER OF SENIOR REAClDR OPERATORS*UPGRADE 0 2 2 0 NUMBER OF SENIOR REAClDR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/04/2009 5/17/2010 5/1612011 N/A ALTERNATE DATE 5/11/2009 5/24/2010 5/23/2011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 0 0 16 0 0 0 0 CANDIDATES
Response to RIS 2008-16 Attachment 8 Page 1 of 1 NRC? FORM SJ(; 1I$ NUCLEAR REGULA TOR'\' COMMISSION APPROVED BY OMll: NO. .ll,(HlIJl EXPIRES; IllII.ll t2n()~
18-:14185)
E"-Im~ed burden ~r resp(1n..~ ft\ L'umpl¥ with Iht~ \luruutary inlhnnalinl1 cnlJedlon reque..'a: I hour. This inRlrmau>n t..,tliet1ion is ust'd 10 plan budgets and rt~oout'{'ts for operlltOT t!umiom tons. Send Ct eslimale 10 rne Records,and r-DIAlPtivacy Servi OPERATOR LICENSING Gron.
l\."'t'f. 01'fk."e of III otln:t.tinp EXAMINATION DATA :U). Office nf Manllgcltlent and u'iCd 10 impllf.t' an inSbrmIKtUl1
.:nHet'tioo does oot display il currently V'41id OMS CURnut number. lhe NRC may
!Mlt condocr: nr "JXlI1SOf~ and a txf~lft is not required ttl re!<ipond to, lbe mthrmill ion cHUection.
FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. OPR-44 and OPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REAClOR OPERATORS 2 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 9 10 0 10 NUMBER OF SENIOR REAClOR OPERATORS*UPGRADE 1 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 6 0 0 0 PROPOSED DATES 12107/2009 PRIMARY DATE 1210612010 N/A 12103/2012 8/03/2009 - LSRO 12114/2009 ALTERNATE DATE 12113/2010 N/A 12110/2012 811 0/2009 - LSRO C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 16 0 0 0 0 0 CANDIDATES
Response to RIS 2008-16 Attachment 9 Page 1 of 1 NRCFORMSJ6 u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OM8, NO. .1150-1H3J EXPIRES: 0IVl112OO!l (lI-lOOSI Estimaled hurden per re'pn.", to comply with Ibi,_",rullll,ry informlllKln
'f~~il'~i~~~~
lIOO re~lIJn:e~ Klf nperUhl( examinafions.
eSlimale- 10 the Re1.:md~..oo ro'AIf'nvai; OPERATOR LICENSING
~ ~
EXAMINATION DATA *(3150-0131). OffIce ofM3rulll"""nt ,Ill!
mean!> u.~d l(l imp",~ nn informatIon lay a Cllm!ntly v.1id OM8 ctl"llIllo.mller. rile NRC may nnl (.'OOOllCI nf spunsor. and a per~n i.. lll,'tt Rquired It) ~fhnd to. the infhrtMtSun cnllection.
Ft\CILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAWNATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 BSTfMAlED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINAnONS BSTfMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 NUMBER OF REACIDR OPERATORS 6 0 6 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 0 10 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DAlE 11/30/2009 N/A 5/2912011 3/1212012 ALTERNATE DAlE 12107/2009 N/A 611212011 312612012 C. PROPOSED GENERIC FUNDA.\fENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 16 0 0 0 14 CANDIDATES
Response to RIS 2008~ 16 Attachment 10 Page 1 of 1 NRCFORM~3Ii tJ.s NtJCU;:AR REGULATORY COMMISSION APPROVED BY OMB: NO. 315tl-1lI3! EXPIRES: OIV31 r.oos CII*ZlMISI EMimatcd burden per response til compl1 with Ihis votuntary jnformation coll'ec, .ion reqUCM: J hour. 1lri~ infoml3:tlno t:HIJet:tion i:; us.ed to ph'" budgcls
- md teM.'mrces thr nperafnr exammlmon~. Send l"Hmmenl~ re~dblr!! burden
"male Itl the Rt<:.lI"ds .no FOINJ>ri\'ocy Services Branch (l.j 3). U.s.
OPERATOR LICENSING CnmmH,s1no. Wa.,t'JIngton~ DC 2055S.{'ltXiI ~~r,~Kl~~!
EXAMINATION DATA t;~~i~::~ Md f ""rrend~ valid OMS L'lltlHltl number* the NRC may oot ~Hnduct nr $.pon~Of+ and 01 peNlR j~ not required tn fespond to. the inthnnatinn cullet.'tuJIl.
FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No. OPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 BSTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 6 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 2 0 NUMBER OF SENIOR REACfOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/25/2009 N/A 5/30/2011 NlA ALTERNATE DATE 610112009 N/A 610612011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 15 0 0 0 CANDIDATES