RS-08-092, Amergen Energy Company, LLC, Transmittal of Response to NRC Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from RS-08-092)
Jump to navigation Jump to search
Amergen Energy Company, LLC, Transmittal of Response to NRC Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations
ML082050133
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane
Issue date: 07/22/2008
From: Benyak D
AmerGen Energy Co, Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-08-016, RS-08-092
Download: ML082050133 (13)


Text

An Exelon Company wwwexeloncorp.corn Ame rC, n Energy Company, LLC 4300 Winfield Road Warrenvil le, I L 60555 RS-08-092 July 22, 2008 erG ExelonR)

U. S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Nuclear Exelon Generation 4300 Winfield Road Warrenville, I L 60555

July 22, 2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27, 2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010.

Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows : the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.

Respectfully, Darin M. Benyak Director - Licensing and Regulatory Affairs

July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EYPIRES :08/31/2008 f8-2005)

Estimated burden per response to comply with this voluntary information collection request I hour. This information collection is used to plan budgets OPERATOR LICENSING and resources for examinations. Send comments burden estimate operator regarding to the Records and FOIA/Privacy Services Btanch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet EXAMINATION DATA e-mail to and to the Desk Officer, Office of Information and Regulatory Affairs, intcxollectsCanrc.gov NEOB-10202, (3150

.0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 1

0 7

O OPERATORS NUMBER OF SENIOR REACTOR 12 0

12 0

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

0 2

OPERATORS-UPGRADE 0

NUMBER OF SENIOR REACTOR 0

O O

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/05/2009 N/A 6/20/2011 N/A ALTERNATE DATE 10/19/2009 N/A 7/11/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 21 0

0 0

CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB

NO

. 3150-0131 EXPIRES

08/31/'008 c8-20051 Estimated burden per response to amply with this voluntary information collection request I hour. This information collection is used to plan budgets OPERATOR LICENSING and iesrmrces for examinations

. Send comments burden estimate operator regardin to the Records and FOIA/Privacy Services Branch cT-5 F~3>, U.S Nuclear Regulatory Commissicm, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail a>

and to the Desk Officer, Office of Information and Regulatory l at ory

6ov, Affairs,

, N NEOB-t020'_, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or and a is not to the information

spcrosor, to, collection.

person required respond FACILITY NRC REGION Byron Station, Units 1 and 2 111 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 0

9 O

7 OPERATORS NUMBER OF SENIOR REACTOR 0

g 12 6

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 1

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

O O

O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 9/27/2010 9/12/2011 9/10/2012 ALTERNATE DATE N/A 10/04/2010 9/26/2011 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GEE) SCHEDULE CI' 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

17 0

0 0

12 0

0 CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES : 08/3 t/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request : I hour

. This information collection is used to plan budgets OPERATOR LICENSING and resources for examinations. Send comments burden estimate operator regarding to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-((X)I, or by inlet get EXAMINATION DATA e-mail to and to the Desk Officer, Office of Information and Regulatory Affairs, intocollects@nrc.go v, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 2)503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may rot conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Clinton Power Station, Unit 1 III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 6

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 3

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

O OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR O

0 O

O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/24/2009 N/A 8/22/2011 N/A ALTERNATE DATE 8/17/2009 N/A 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

9 0

0 CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO

. 3150-0131 EXPIRES: 08/31/2(X)8 (8-21105)

Estimated burden per response to comply with this voluntary information collection request : I hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F~3), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-(10)1, or by internet EXAMINATION DATA e-mail to and to the Desk Officer, Office of Information and Regulatory intocollects@nrcgov, Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or. sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 6

4 4

4 OPERATORS NUMBER OF SENIOR REACTOR 4

10 8

8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 1

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

O O

O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 3/09/2009 3/08/2010 3/07/2011 3/05/2012 ALTERNATE DATE 4/06/2009 4/05/2010 4/04/2011 4/02/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 12 0

0 0

14 0

CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO

. 3150-0131 EXPIRES : 08/3t/2008 (8-2(K)5)

Estimated burden per response to comply With this voluntary information collection request: I hour. This information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments burden estimate regardin ~"

to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S Nuclear Regulatory Commission, DC. 20555-(A)0l, or intern et e-mail Washington, by to i4ocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatoryy Affairs, NEOB-10202,(3150-013 1), Oft-ice of ivlanagement and Budget, Washington, DC 20503. It a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or and a is not to to, the information

sponsor, collection.

person required respond FACILITY NRC REGION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 0

4 0

4 OPERATORS NUMBER OF SENIOR REACTOR 0

8 O

8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

O 2

OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

O O

O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 9/14/2010 N/A 9/18/2012 ALTERNATE DATE N/A 9/21/2010 N/A 9/25/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cY 2009 cY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

12 0

0 0

0 0

0 CANDIDATES

Response to RIS 2008-16 Page 1 of 1

  • See Attachment 8 (Peach Bottom Atomic Power Station) for LSRO numbers and exam dates NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0£3/31/2008 t8-2005)

Estimated burden per response to amply With this voluntary information collection request: I hour. This information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments

> burden estimate regardin to the Records and FOIA/Privacy Services Branch (T-5 F53). U.S.

Nuclear Regulatoryy Commission, Washington, DC _0555-(1001, or by internet EXAMINATION DATA e-mail to intocollects@nrcgov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10203, (3150-0131), Office of Management and Budget, Washington, DC 20503_ If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or and a is not to the information

sponsor, person to, collection.

required respond FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I

Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 0

6 O

4 OPERATORS NUMBER OF SENIOR REACTOR 0

10 O

6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

2 O

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

O O

OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/04/2010 N/A 10/08/2012 ALTERNATE DATE 10/18/2010 N/A 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cY 2009 cY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

16 0

0 0

0 0

0 CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES : 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary informafion collection request : I hour. This information collection is used to plan budgets OPERATOR LICENSING and resources for examinations

. Send comments estimate operator burden to the Records and FOIA/Privacy Services regarding Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-(1(X)1, or by internet EXAMINATION DATA e-mail to and to the Desk Office of Information and Regulatory Affairs, infocollects@nrc.go v,

Officer, NEOB-10202, (3150-013 I), Office ofManagement and Rudgi, WaAmgton, DC 20503

. If a means used to impose an information

-~dL-ri un does not display a currently valid OMB control number, the NRC may in'i, ~

" nduct r sponsor, and a is not to the infxmation to, collection.

person required respond FACILITY NRC REGION Oyster Creek Nuclear Generating Station I

Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 6

6 6

0 OPERATORS NUMBER OF SENIOR REACTOR 10 8

10 0

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

2 OPERATORS-UPGRADE 2

0 NUMBER OF SENIOR REACTOR 0

O O

O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 5/04/2009 5/17/2010 5/16/2011 N/A ALTERNATE DATE 5/11/2009 5/24/2010 5/23/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 cY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 0

0 16 0

0 0

0 CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES : 08/31/2008 t8-2105)

Estimated burden to with this intormation collection per response voluntary request: l hour. This information comply collection is used to plan budgets OPERATOR LICENSING and resources for examinations

. Send comments estimate operator burden to the Records and FOIA/Privacy Services Branch regarding (T-5 F53), U.S Nuclear Washington, internet e-mail in Re "ulatoryCommission, the DC20555-(XX)l,orby EXAMINATION DATA to and to Desk Officer, Office of Information and ocollects@nrc.gov, Regulatory Affairs, NEOB-1020'2, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or and a is not to the information

sponsor, to, collection.

person required respond FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I

Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1

0 1

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 2

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 9

10 0

10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

2 OPERATORS-UPGRADE 0

2 NUMBER OF SENIOR REACTOR 6

O O

O OPERATORS-LIMITED PROPOSED DATES 12/07/2009 PRIMARY DATE 12/06/2010 N/A 12/03/2012 8/03/2009-LSRO 12/14/2009 ALTERNATE DATE 12/13/2010 N/A 12/10/2012 8/10/2009-LSRO C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 16 0

0 0

0 0

CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES : 08/31/21008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request: I hour

. This information collection is used to plan budgets and restnuces for operator examinations. Send comments regardin~ burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to tocollecsC nrc. " ov, mid to the Officer, Office of Information and Regulatory la Affairs, NE B-10202, (3150-013 1), Oft-ice of Management and Budget, Washington, DC 20503

. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or.sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMNATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXANIINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR 6

0 6

4 OPERATORS NUMBER OF SENIOR REACTOR 10 0

10 10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 1

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

O O

O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 11/30/2009 N/A 5/29/2011 3/12/2012 ALTERNATE DATE 12/07/2009 N/A 6/12/2011 3/26/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cY 2009 cY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

16 0

0 0

14 CANDIDATES

Response to RIS 2008-16 0 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO. 3150-0131 EXPIRES

08/31/'(X)8 (8-2005)

Estimated burden per response to comply with this voluntary information collection request : I hour. This information collection is used to plan budgets OPERATOR LICENSING and resources for examinations. Send comments burden estimate operator regarding to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Re~ulwtoryCommission,Washington, DC'0555-(I(xll,orby internet EXAMINATION DATA e-mail to and to the Desk Officer, Office of Information and Regulatory intocollects@nrc.gov, Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may act conduct or and a is not to to, the information

sponsor, collection.

person required respond FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I

Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR O

8 O

OPERATORS NUMBER OF SENIOR REACTOR 6

O 7

O OPERATORS-INSTANT NUMBER OF SENIOR REACTOR O

O 2

O OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR O

O O

O OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 5/25/2009 N/A 5/30/2011 N/A ALTERNATE DATE 6/01/2009 N/A 6/06/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 15 0

0 0

CANDIDATES