ENT000324 Submitted: March 29, 2012 From:
Sent:
To:
Subject:
John-Mayer, Donald M Wednesday, November 5,20084:10 PM
'jrw1@nrc.gov' Indian Point 1 I am happy to report that we have completed the draining and de-sludging of the Unit 1 fuel pools. The fuel has been safely removed from the west pool (as of 9/19/08), the fuel pools are drained (as of 10/15/08) and de-sludge operations are completed (10/31/08). As an added measure for long-term SAFSTOR maintenance the most contaminated (west pool) has had a fixative (coating) applied to minimize the potential for future airborne contamination (this was completed today). This ends an important project for IPEe which has terminated the leakage from the Unit 1 spent fuel pools thus stopping the introduction of radiological contaminants to the underlying groundwater from this source. The contamination of ground water as a result of an actively leaking pool complex at Unit 1 has been terminated.
Not insignificantly this was completed with no personnel safety or radiological issues and for dose which was ALARA and below our goal.
Don Don Mayer Director, Unit 1 Entergy Nuclear Indian Point Energy Center (w) 914 827-7716 (c) 914 582-6901 Confidential I PEC001287826