ML12072A325

From kanterella
Jump to navigation Jump to search
2012/03/12 Davis-Besse Lr - FW: FENOC License Renewal RAI Letter L-12-015 (Part 3 of 3)
ML12072A325
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/12/2012
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML12072A325 (7)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Monday, March 12, 2012 11:49 AM To: dorts@firstenergycorp.com Cc: custerc@firstenergycorp.com; Davis-BesseHearingFile Resource

Subject:

FW: FENOC License Renewal RAI Letter L-12-015 (Part 3 of 3)

Attachments: LR-M037E Rev 3 Final 030912.pdf; LR-M037F Rev 2 Final 030912.pdf; LR-M039A Rev 4 Final 030912.pdf; LR-M039B Sheet 1 Rev 3 Final 030912.pdf; LR-M042B Rev 3 Final 030912.pdf Thanks From: dorts@firstenergycorp.com [1]

Sent: Friday, March 09, 2012 3:22 PM To: CuadradoDeJesus, Samuel Cc: custerc@firstenergycorp.com

Subject:

FENOC License Renewal RAI Letter L-12-015 (Part 3 of 3) 3 of 3 emails providing updated License Renewal Boundary Drawings included as the Enclosure to the letter.

See attached drawings.

_____

Steve Dort DBNPS License Renewal


The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3676 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D080722BF7B1)

Subject:

FW: FENOC License Renewal RAI Letter L-12-015 (Part 3 of 3)

Sent Date: 3/12/2012 11:48:43 AM Received Date: 3/12/2012 11:48:52 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"custerc@firstenergycorp.com" <custerc@firstenergycorp.com>

Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1040 3/12/2012 11:48:52 AM LR-M037E Rev 3 Final 030912.pdf 734344 LR-M037F Rev 2 Final 030912.pdf 449251 LR-M039A Rev 4 Final 030912.pdf 667724 LR-M039B Sheet 1 Rev 3 Final 030912.pdf 652172 LR-M042B Rev 3 Final 030912.pdf 603992 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

10 24 24 25 19 25 25 19 25 10 10 25 25 23 24 25 24 25 23 25 24 25 23 25 23 23 25 25 25 23 24 25 25 25 24 24 24 13 24 25 25 24 25 24 24 25 23 25 25 13 24 24 24 25 23 24 24 25 24 25 23 25 24 23 13 24 25 24 LR NOTE B LR NOTES:

A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01.

B. COMPONENTS BEYOND THE HIGHLIGHTING ARE AIR LINES THAT DO NOT CONTAIN LIQUID AND ARE NOT IN SCOPE.

LR NOTE B LICENSE RENEWAL BOUNDARY DRAWING LR-M037E REV. 3 SYSTEMS SHOWN ON THIS DRAWING:

10: MAKEUP & PURIFICATION 13: COMPONENT COOLING & DEMINERALIZED WATER STORAGE 19: REACTOR COOLANT VENT & DRAIN 23: SAMPLING 24: NONSAFETY AFFECTING SAFETY 25: BORON RECOVERY 23 24

25 25 23 23 25 24 25 23 23 25 23 25 LR NOTES:

A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LRLR-M001-01.

M001 01 B. PIPING ELEMENTS AND VALVE BODIES UP TO AND INCLUDING THE BLANK PLATE ARE INCLUDED IN SCOPE.

LICENSE RENEWAL BOUNDARY DRAWING LR-M037F REV. 2 SYSTEMS SHOWN ON THIS DRAWING:

23: SAMPLING LR NOTE B 24: NONSAFETY AFFECTING SAFETY 25: BORON RECOVERY

LR NOTES:

A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01.

B. COMPONENTS BEYOND THE HIGHLIGHTING ARE IN THE CONDENSATE DEMINERALIZER SYSTEM, WHICH IS LOCATED IN THE HIGHLIGHTING TURBINE BUILDING, WHERE (A)(2)-NSAS CONSIDERATIONS CONTINUED ON ARE NOT A CONCERN, AND ARE THEREFORE NOT IN THE SCOPE OF LR NOTE D LR-M090 LICENSE RENEWAL.

C. UPDATED S/I BOUNDARY IS AT THE INDICATED LOCATION, AS SHOWN ON P&ID M-039A REV 34.

D. PIPING ELEMENTS UP TO AND INCLUDING THE BLANK PLATE ARE INCLUDED IN SCOPE.

25 24 23 24 20 24 20 24 24 23 20 24 09 24 25 24 LR NOTE B 24 10 23 24 10 24 15 24 23 24 HIGHLIGHTING CONTINUED ON LR NOTE C LR-M090 LICENSE RENEWAL BOUNDARY DRAWING LR-M039A REV. 4 SYSTEMS SHOWN ON THIS DRAWING:

09: MAIN STEAM 10: MAKEUP & PURIFICATION 13: COMPONENT COOLING & DEMINERALIZED WATER STORAGE 15: SPENT FUEL COOLING & CLEANUP 20: STATION PLUMBING, DRAINS & SUMPS 23: SAMPLING 24: NONSAFETY AFFECTING SAFETY 24 25: BORON RECOVERY 23 24 23 25 24 13 24

13 24 24 13 HIGHLIGHTING CONTINUED ON HIGHLIGHTING LR-M036C CONTINUED ON 13 24 LR-M036C 24 25 24 25 24 HIGHLIGHTING 23 CONTINUED ON 24 LR-M020B 23 25 24 24 23 LR NOTE B 19 24 LR NOTE B 23 24 24 25 24 23 25 24 24 LR NOTE C 23 23 24 LR NOTES:

24 23 A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01.

B. COMPONENTS BEYOND THE HIGHLIGHTING DO NOT CONTAIN LIQUID OR STEAM NOR ARE ATTACHED TO SAFETY-RELATED COMPONENTS.

THEREFORE, THESE COMPONENTS ARE NOT WITHIN THE SCOPE OF LICENSE RENEWAL.

C. SEE DRAWING LR-M039B SHEET 2 FOR CONTINUATION OF IN-SCOPE COMPONENTS ASSOCIATED WITH THE ABANDONED IN-PLACE EVAPORATOR STORAGE TANK PUMPS.

LR NOTE C LICENSE RENEWAL BOUNDARY DRAWING LR-M039B SHEET 1 REV. 3 SYSTEMS SHOWN ON THIS DRAWING:

13: COMPONENT COOLING & DEMINERALIZED WATER STORAGE 19: REACTOR COOLANT VENT & DRAIN SKID 23: SAMPLING COMPONENTS 24: NONSAFETY AFFECTING SAFETY ALSO 25: BORON RECOVERY HIGHLIGHTED ON LR-M281N13 LR NOTE C

SEE LR NOTE B LR NOTES:

A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01.

B. FOR S-033-1, HIGHLIGHTING SHOULD BE GREEN TO THE NOTE 5 BOUNDARY.

LICENSE RENEWAL BOUNDARY DRAWING LR-M042B REV. 3 SYSTEMS SHOWN ON THIS DRAWING:

23: SAMPLING