OL - TVA Letter to NRC_01-17-12_2-PTI-030L-01 Transmittal to NRC
ML12023A200
Person / Time
Site: Watts Bar 
Issue date: 01/18/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12023A200 (113)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Wednesday, January 18, 2012 7:47 AM To:

Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc:

Arent, Gordon; Hamill, Carol L; Boyd, Desiree L

Subject:

TVA letter to NRC_01-17-12_2-PTI-030L-01 transmittal to NRC Attachments:

01-17-12_2-PTI-030L-01 transmittal to NRC_Final.pdf Please see attached TVA letter that was sent to the NRC today.

Thank You,

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

639 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF27AEAF9B)

Subject:

TVA letter to NRC_01-17-12_2-PTI-030L-01 transmittal to NRC Sent Date:

1/18/2012 7:47:25 AM Received Date:

1/18/2012 7:47:34 AM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 269 1/18/2012 7:47:34 AM 01-17-12_2-PTI-030L-01 transmittal to NRC_Final.pdf 613887 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

U.S. Nuclear Regulatory Commission Page 2 January 17, 2012 bcc (Enclosure):

Stephen Campbell U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Patricia Holahan, Acting Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 3 of 109 Table of Contents

1.0 INTRODUCTION

.......................................................................................................... 6 1.1 Test Objectives............................................................................................................. 6 1.2 Scope............................................................................................................................ 6

2.0 REFERENCES

............................................................................................................. 7 2.1 Performance References.............................................................................................. 7 2.2 Developmental References........................................................................................... 7 3.0 PRECAUTIONS AND LIMITATIONS......................................................................... 10 4.0 PREREQUISITE ACTIONS........................................................................................ 13 4.1 Preliminary Actions..................................................................................................... 13 4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies.......................... 17 4.3 Field Preparations....................................................................................................... 20 4.4 Approvals and Notifications........................................................................................ 25 5.0 ACCEPTANCE CRITERIA......................................................................................... 26 6.0 PERFORMANCE........................................................................................................ 28 6.1 Upper Compartment Air Mass Temperature............................................................... 29 6.1.1 Upper Compartment Coolers 2A, 2B, 2C...................................................... 29 6.1.2 Upper Compartment Coolers 2A, 2B, 2D...................................................... 31 6.1.3 Upper Compartment Coolers 2A, 2C, 2D...................................................... 33 6.1.4 Upper Compartment Coolers 2B, 2C, 2D...................................................... 35 6.2 Lower Compartment Air Mass Temperature............................................................... 37 6.2.1 Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A.................... 37 6.2.2 Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A.................... 39 6.2.3 Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B........................................................................................................ 41

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 4 of 109 Table of Contents (continued) 6.2.4 Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B........................................................................................................ 43 7.0 POST PERFORMANCE ACTIVITY............................................................................ 45 8.0 RECORDS.................................................................................................................. 46 Appendix A:

TEST PROCEDURES/INSTRUCTIONS REFERENCE REVIEW..................................................................................................... 47 Appendix B:

TEMPORARY CONDITION LOG............................................................... 49 Appendix C:

PERMANENT PLANT INSTRUMENTATION LOG.................................... 50 Appendix D:

ICS Points.................................................................................................. 56 Appendix E:

ERCW Flow and Temperature M&TE...................................................... 59 Appendix F:

Containment and Divider Barrier Boundary........................................... 64 Appendix G:

Lower Compartment Temperature Survey Cooler Alignments (Section 6.2).......................................................................... 66 Appendix H:

Weighted Average Containment Temperatures - ICS Out of Service................................................................................................... 68 Data Sheet 1:

Upper Compartment Temperature Survey - Subsection 6.1.1............................................................................................................ 73 Data Sheet 2:

Upper Compartment Temperature Survey - Subsection 6.1.2............................................................................................................ 75 Data Sheet 3:

Upper Compartment Temperature Survey - Subsection 6.1.3............................................................................................................ 77 Data Sheet 4:

Upper Compartment Temperature Survey - Subsection 6.1.4............................................................................................................ 79 Data Sheet 5:

Lower Compartment Temperature Survey - Subsection 6.2.1............................................................................................................ 81 Data Sheet 6:

Lower Compartment Temperature Survey - Subsection 6.2.2............................................................................................................ 86

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 5 of 109 Table of Contents (continued)

Data Sheet 7:

Lower Compartment Temperature Survey - Subsection 6.2.3............................................................................................................ 91 Data Sheet 8:

Lower Compartment Temperature Survey - Subsection 6.2.4............................................................................................................ 96 Data Sheet 9:

Upper Compartment Air Temperature Thermocouple Measurements......................................................................................... 101 Data Sheet 10: Lower Compartment Air Temperature Thermocouple Measurements......................................................................................... 103 Table 1:

Containment Air Cooling Equipment Locations.................................. 107

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 6 of 109 Date ________

1.0 INTRODUCTION

1.1 Test Objectives To demonstrate the capability of the Containment Air Cooling System to provide proper cooling of the following:



Upper and Lower Containment general spaces



Incore Instrument Room 1.2 Scope NOTE This test is performed during the portion of Hot Functional Testing (HFT) at which the Reactor Coolant System is at Normal Operating Temperature (NOT) and Normal Operating Pressure (NOP).

The test demonstrates that:

A.

The Upper Compartment Cooling (UCC) units will maintain design temperatures in the Upper Containment areas.

B.

The Lower Compartment Cooling (LCC) units, in conjunction with Control Rod Drive Mechanism (CRDM) Cooling units, will maintain design temperatures in the Lower Containment areas.

C.

The Incore Instrument Room Air Conditioning (IIRAC) units will maintain design temperatures in the Incore Instrument Room.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 7 of 109 Date ________

2.0 REFERENCES

2.1 Performance References A.

SMP-9.0, Conduct of Test B.

2-PTI-068-01, HFT - Heatup and Cooldown 2.2 Developmental References A.

Final Safety Analysis Report, Amendment 107

1.

Section 9.4.7, Containment Air Cooling System

2.

Table 14.2-1, Sheets 38 & 39, Containment Ventilation System Test Summary B.

Drawings:

1.

Flow Diagrams

a.

2-47W866-1, Rev 2, HEATING AND VENTILATION AIR FLOW DRA52841-02, Rev 0

b.

2-47W865-5, Rev 0, AIR CONDITIONING CHILLED WATER

c.

2-47W845-2, Rev 3, ESSENTIAL RAW COOLING WATER SYSTEM

d.

2-47W845-3, Rev 5, ESSENTIAL RAW COOLING WATER SYSTEM

2.

Logic/Control

a.

2-47W610-30-2, Rev 1, CONTROL DIAGRAM VENTILATION SYSTEM

b.

2-47W610-31-5, Rev 3, CONTROL DIAGRAM AIR CONDITIONING SYSTEM

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 8 of 109 Date ________

2.2 Developmental References (continued)

3.

Electrical

a.

45N2616-10, Rev 3, THERMOCOUPLES & RTDS CONNECTION DIAGRAMS DRA 52322-184, Rev 0

b.

2-47A615-0, Rev 1, INTEGRATED COMPUTER SYSTEM TERMINATIONS AND I/O LIST (Pages 18, 19, 28)

c.

2-45W2697-14-4, Rev 0, INTEGRATED COMPUTER SYSTEM DAQ.

PANEL 2-R104 CONNECTION DIAGRAM

d.

2-45W2697-14-8, Rev 0, INTEGRATED COMPUTER SYSTEM DAQ.

PANEL 2-R104 CONNECTION DIAGRAM

e.

2-45W2697-54-1, Rev 0, INTEGRATED COMPUTER SYSTEM DAQ.

PANEL 2-R111 CONNECTION DIAGRAM C.

Documents

1.

WBN2-30RB-4002, Rev 1, Reactor Building Ventilation System

2.

2-T-30-210, Rev 0, Containment Mass Air Temperature Sensors

3.

Unit 2 Technical Specifications (Draft)

a.

Section 3.6.5, Containment Air Temperature

4.

2-TSD-30L-1, Rev 0, HFT Containment Building Temperature Survey

5.

2-PTI-067-02-A, Rev 0, ERCW System Flow Balance - Train A

6.

2-PTI-067-02-B, Rev 0, ERCW System Flow Balance - Train B

7.

SSD-2-LPT-67-84, Rev 0, Lower Cntmt Cooler A Temp.

8.

SSD-2-LPT-67-92, Rev 0, Lower Cntmt Cooler C Temp

9.

SSD-2-LPT-67-100, Rev 0, Lower Cntmt Cooler B Temp

10. SSD-2-LPT-67-108, Rev 0, Lower Cntmt Cooler D Temp

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 9 of 109 Date ________

2.2 Developmental References (continued)

11. SSD-2-LPT-67-85, Rev 0, Control Rod Drive Vent Cooler A Temp
12. SSD-2-LPT-67-93, Rev 0, Control Rod Drive Vent Cooler C Temp
13. SSD-2-LPT-67-101, Rev 0, Control Rod Drive Vent Cooler B Temp
14. SSD-2-LPT-67-109, Rev 0, Control Rod Drive Vent Cooler D Temp
15. SSD-2-LPT-67-129, Rev 0, Upper Cntmt Vent Cooler A Temp
16. SSD-2-LPT-67-132, Rev 0, Upper Cntmt Vent Cooler C Temp
17. SSD-2-LPT-67-137, Rev 0, Upper Cntmt Vent Cooler B Temp
18. SSD-2-LPT-67-140, Rev 0, Upper Cntmt Vent Cooler D Temp

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 10 of 109 Date ________

3.0 PRECAUTIONS AND LIMITATIONS A.

Standard precautions shall be followed for working around energized electrical equipment in accordance with TVA Safety Procedure 1021.

B.

Steps may be repeated if all components cannot be tested in a step. However, if the test has been exited, prerequisite steps must be re-verified and a Chronological Test Log (CTL) entry made.

C.

Discrepancies between component ID tags and the description in a procedure/instruction if the UNIDs match, exclusive of place keeping zeros and train designators (e.g. 2-HS-31-468 vs. 2-HS-031-0468) and the noun description is sufficient to identify the component. This condition does not require a Test Deficiency Notice (TDN) in accordance with SMP-14.0. If the component label needs to be changed, a Tag Request Form (TR Card) should be processed in accordance with TI-12.14. Make an entry in the CTL and continue testing.

D.

IF/THEN steps may be marked N/A if stated condition does not exist.

E.

All open problems are to be tracked by a corrective action document and entered on the appropriate system punch list.

F.

Problems identified during the test shall be annotated on the CTL, including a description of the problem, the procedure step when/where the problem was identified, corrective action steps taken to resolve the problem, and the number of the corrective action document, if one was required.

G. Observe all Radiation Protection (RP) requirements with working in or near contaminated areas.

H.

Ensure there are no adverse effects to the operation of Unit 1 structures, systems, or components.

I.

Special precautions may be required to prevent heat stress due to high temperature and humidity in some test areas. Follow heat stress precautions in accordance with TVA Safety Procedure 806 and the Site Safety Department.

J.

Access to Containment will be controlled by applicable procedures independent of this test procedure.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 11 of 109 Date ________

3.0 PRECAUTIONS AND LIMITATIONS (continued)

K.

The Containment and Divider Barrier Boundary as listed in Appendix F should be maintained. Temporary means of isolation to simulate closed containment conditions is permissible including the use of plastic/plywood sheeting utilizing appropriate site procedures. A CTL entry and/or Appendix F entry shall be made to clarify any significant change of condition.

L.

CRDM Cooler fans could create a local personnel hazard due to high noise levels and high air velocity. Double hearing protection (ear plugs and ear covers) is required when near the operating CRDM Cooler fans.

M. At least one CRDM Cooler per paired set shall be in operation, and remain in service, when air temperatures at the coil intake exceed 160F as indicated by computer point T1104A and/or T1105A. Test personnel shall notify the Control Room when this condition is observed and make a CTL entry of that notification and the personnel notified.

N.

A minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is required to elapse (with the specified coolers in operation) between performing the first cooler alignment and collecting the first set of data in both Section 6.1 and Section 6.2. A minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is required between subsequent sets of data within each Subsection. A minimum of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is required between subsequent Subsections. The Test Engineer may obtain and record additional data during the test.

O. The Unit Supervisor may, at their discretion, provide fresh air and exhaust air using the Containment Purge System; this should be accomplished prior to the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> stabilization period preceding data collection. A CTL entry shall be made if purging occurs within the 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to data collection start, during a data collection period, or during the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period between data sets.

Containment Purge valves should be closed during data collection.

P.

This test will be performed at conditions that mimic normal operating conditions.

The ERCW Temperature Control Valve setpoints are controlled by Operations and may not exceed 110F (UCCs) or 120F (LCCs, CRDM Coolers) in accordance with their Plant Setpoint & Scaling Documents Q. Upper Compartment Cooler, Lower Compartment Cooler, and CRDM Cooler control switches in the Main Control Room may NOT be placed in PULL A-P AUTO.

R.

The test data from each Subsection will be reviewed by the designated Test Engineer for accuracy and completeness prior to making data available to Engineering. A review and evaluation of test data by Engineering shall be performed for each Subsection to ensure adequate data has been obtained and to request any additional test data.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 12 of 109 Date ________

3.0 PRECAUTIONS AND LIMITATIONS (continued)

S.

During the test, the lower permissible temperature of 60F is not expected to occur; however, temperatures inside Containment should be closely monitored by test personnel so that, if necessary, appropriate action may be initiated to raise the temperature to acceptable limits.

T.

If the required Integrated Computer System (ICS) points are unavailable at the time of the test, the Upper and Lower Compartment weighted-average air temperatures may be calculated using Appendix H.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 13 of 109 Date ________

4.0 PREREQUISITE ACTIONS NOTE Prerequisite steps may be performed in any order, unless otherwise stated, and should be completed as close in time as practicable to the start of the instruction subsection to which they apply.

4.1 Preliminary Actions

[1]

VERIFY the test/performance copy of this Preoperational Test Instruction (PTI) is the current revision and as needed, each test person assisting in this test has the current revision.

[2]

OBTAIN copies of the applicable forms from the latest revision of SMP-9.0 AND ATTACH to this PTI for use during the performance of this PTI.

[3]

ENSURE changes to the references listed on Appendix A have been reviewed and determined NOT to adversely affect the test performance.

[4]

VERIFY current revisions and change paper for referenced drawings have been reviewed and determined NOT to adversely affect test performance, AND ATTACH documentation of the current drawing revision numbers and change papers that were reviewed to the data package.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 14 of 109 Date ________

4.1 Preliminary Actions (continued)

[5]

EVALUATE open items in Watts Bar Integrated Task Equipment List (WITEL) for the following systems, AND ENSURE that they will NOT adversely affect the test performance.

A.

System 30G, Upper Compartment Coolers B.

System 30H, Lower Compartment Coolers C.

System 30I, CRDM Coolers D.

System 30L, Pressure, Temperature, & Humidity Monitoring E.

System 31B, Incore Instrument Room Air Conditioning

[6]

ENSURE required Component Testing has been completed prior to start of test for the following systems.

A.

System 30G, Upper Compartment Coolers B.

System 30H, Lower Compartment Coolers C.

System 30I, CRDM Coolers D.

System 30L, Pressure, Temperature, & Humidity Monitoring E.

System 31B, Incore Instrument Room Air Conditioning

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 15 of 109 Date ________

4.1 Preliminary Actions (continued)

[7]

ENSURE outstanding Design Change Notices (DCNs),

Engineering Document Construction Releases (EDCRs), or Temporary Alterations (TAs) do NOT adversely impact testing, AND ATTACH documentation of DCNs, EDCRs, and TAs that were reviewed to the data package.

A.

System 30G, Upper Compartment Coolers B.

System 30H, Lower Compartment Coolers C.

System 30I, CRDM Coolers D.

System 30L, Pressure, Temperature, & Humidity Monitoring E.

System 31B, Incore Instrument Room Air Conditioning

[8]

ENSURE the GTM-05 HVAC Air Balance packages for the following systems have been completed.

A.

System 30G, Upper Compartment Coolers B.

System 30H, Lower Compartment Coolers C.

System 30I, CRDM Coolers D.

System 31B, Incore Instrument Room Air Conditioning

[9]

ENSURE the ERCW Flow Balance is complete to the extent necessary to support test activities.

A.

Train A: 2-PTI-067-02-A B.

Train B: 2-PTI-067-02-B

[10]

ENSURE a review of outstanding Clearances has been coordinated with Unit 2 Operations for impact to the test performance, AND RECORD in Appendix B, Temporary Condition Log, if required.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 16 of 109 Date ________

4.1 Preliminary Actions (continued)

[11]

VERIFY plant instruments required for test performance listed in Appendix C, Permanent Plant Instrumentation Log, have been placed in service and are within their calibration interval, AND RECORD on Appendix C.

[12]

ENSURE components contained within the boundaries of this test are under the jurisdictional control of Preoperational Startup Engineering (PSE) and/or Plant Operations.

[13]

REVIEW preventive maintenance records for equipment within the scope of this test, AND VERIFY no conditions exist that will impact test performance.

A.

System 30G, Upper Compartment Coolers B.

System 30H, Lower Compartment Coolers C.

System 30I, CRDM Coolers D.

System 30L, Pressure, Temperature, & Humidity Monitoring E.

System 31B, Incore Instrument Room Air Conditioning

[14]

PERFORM a pretest walkdown on equipment to be tested to ensure no conditions exist that will impact test performance.

[15]

CONDUCT a pretest briefing with Test and Operations personnel in accordance with SMP-9.0.

[16]

ENSURE that communications are available for areas where testing is to be conducted.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 17 of 109 Date ________

4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies

[1]

OBTAIN the following M&TE, or equivalent, AND COMPLETE the following table:

DESCRIPTION MINIMUM RANGE REQUIRED ACCURACY M&TE ID NUMBER CALIBRATION DUE DATE Flowmeter (Ultrasonic)1 0-1000 gpm 6 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)1 0-1000 gpm 6 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)1 0-1000 gpm 6 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)1 0-1000 gpm 6 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)2 0-500 gpm 3 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)2 0-500 gpm 3 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)2 0-500 gpm 3 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)2 0-500 gpm 3 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)3 0-100 gpm 11/2 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)3 0-100 gpm 11/2 Sch 40S Stainless Steel Pipe

2% of reading Flowmeter (Ultrasonic)4 0-100 gpm 2 Sch 40 Carbon Steel Pipe

2% of reading Flowmeter (Ultrasonic)4 0-100 gpm 2 Sch 40 Carbon Steel Pipe

2% of reading 1

2 3

4 1-4 A minimum of 3 ultrasonic flowmeters calibrated to these specifications are required to perform this test.

A minimum of 2 ultrasonic flowmeters calibrated to these specifications are required to perform this test.

A minimum of 1 ultrasonic flowmeter calibrated to these specifications is required to perform this test.

A minimum of 1 ultrasonic flowmeter calibrated to these specifications is required to perform this test.

(N/A the unused spaces if no additional flowmeters are available)

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 18 of 109 Date ________

4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies (continued)

DESCRIPTION MINIMUM RANGE REQUIRED ACCURACY M&TE ID NUMBER CALIBRATION DUE DATE Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Thermocouple (Type T) 32-150F

2F Temperature Indicating Device (Type T Thermocouple) 32-150F

2F

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 19 of 109 Date ________

4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies (continued)

[2]

VERIFY M&TE calibration due dates will support the completion of this test performance A.

Subsection 6.1.1 B.

Subsection 6.1.2 C.

Subsection 6.1.3 D.

Subsection 6.1.4 E.

Subsection 6.2.1 F.

Subsection 6.2.2 G. Subsection 6.2.3 H.

Subsection 6.2.4

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 20 of 109 Date ________

4.3 Field Preparations

[1]

ENSURE the following systems are operational and have been placed in service to the extent necessary to perform this test:

A.

System 30F, Containment Vent Air Cleanup Units B.

System 30G, Upper Compartment Coolers C.

System 30H, Lower Compartment Coolers D.

System 30I, Control Rod Drive Mechanism Coolers E.

System 30L, Pressure, Temperature & Humidity Monitoring F.

System 31B, Incore Instrument Room Air Conditioning G. System 55, Annunciator and Sequential Events Recording System H.

System 67, Essential Raw Cooling Water I.

System 261, Integrated Computer System (ICS)

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 21 of 109 Date ________

4.3 Field Preparations (continued)

[2]

RECORD the status of the ICS points listed in Appendix D:

[3]

RECORD whether the minimum number of ICS points are in scan (not out of service) as follows:

A.

At least two (2) of the Group 1 Upper Containment Temperature points in scan.

A.

Subsection 6.1.1  YES  NO B.

Subsection 6.1.2  YES  NO C.

Subsection 6.1.3  YES  NO D.

Subsection 6.1.4  YES  NO B.

At least one (1) of the Group 2 Upper Containment Temperature points in scan.

A.

Subsection 6.1.1  YES  NO B.

Subsection 6.1.2  YES  NO C.

Subsection 6.1.3  YES  NO D.

Subsection 6.1.4  YES  NO C.

At least one (1) of the Group 1 Lower Containment Temperature points in scan.

A.

Subsection 6.2.1  YES  NO B.

Subsection 6.2.2  YES  NO C.

Subsection 6.2.3  YES  NO D.

Subsection 6.2.4  YES  NO

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 22 of 109 Date ________

4.3 Field Preparations (continued)

D.

At least one (1) of the Group 2 Lower Containment Temperature points in scan.

A.

Subsection 6.2.1  YES  NO B.

Subsection 6.2.2  YES  NO C.

Subsection 6.2.3  YES  NO D.

Subsection 6.2.4  YES  NO E.

At least one (1) of the Group 3 Lower Containment Temperature points in scan.

A.

Subsection 6.2.1  YES  NO B.

Subsection 6.2.2  YES  NO C.

Subsection 6.2.3  YES  NO D.

Subsection 6.2.4  YES  NO NOTE Installation of ultrasonic flowmeters may require insulation to be removed. Removal and subsequent reinstallation of insulation should be tracked in a separate work order.

[4]

ENSURE ultrasonic flowmeters and thermocouples are installed at the locations listed in Appendix E.

A.

Section 6.1 (thermocouples only)

B.

Subsection 6.2.1 C.

Subsection 6.2.2 D.

Subsection 6.2.3 E.

Subsection 6.2.4

[5]

[6]

PERFORM a walkdown of the Containment Boundary AND COMPLETE Appendix F.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 23 of 109 Date ________

4.3 Field Preparations (continued)

[7]

VERIFY via the HFT Test Engineer for 2-PTI-068-01 that the plant is at the 557F plateau.

A.

Section 6.1 B.

Section 6.2

[8]

PERFORM a walkdown of the Containment Building AND RECORD in the CTL the general status of the Containment Building describing those conditions which may attribute to a heat loss or gain (e.g. missing insulation, scaffolds, platforms, tenting, welding machines or acetylene torches in use, standing water, etc).

[9]

RECORD whether the Rod Control Mechanism Coils are energized or de-energized:

A.

Subsection 6.1.1 RCM Coils energized  YES  NO B.

Subsection 6.1.2 RCM Coils energized  YES  NO C.

Subsection 6.1.3 RCM Coils energized  YES  NO D.

Subsection 6.1.4 RCM Coils energized  YES  NO E.

Subsection 6.2.1 RCM Coils energized  YES  NO F.

Subsection 6.2.2 RCM Coils energized  YES  NO G. Subsection 6.2.3 RCM Coils energized  YES  NO H.

Subsection 6.2.4 RCM Coils energized  YES  NO

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 24 of 109 Date ________

4.3 Field Preparations (continued)

[10]

ENSURE one Containment Vent Air Cleanup Unit is in service by performing the following:

[10.1]

ENSURE one of the following valves is open (check one)

 2-ISV-30-23, CNTMT PRESS RELIEF FLTR INLET ISOL

 2-ISV-30-24 CNTMT PRESS RELIEF FLTR INLET ISOL

[10.2]

ENSURE the following valves are open:



2-FCV-30-37, CNTMT LOWER COMPARTMENT PURGE EXH PRESS RELIEF



2-FCV-30-40, CNTMT LOWER COMPARTMENT PURGE EXH PRESS RELIEF

[11]

IF the Unit 2 Annulus is closed (Equipment Hatch X-1 CLOSED, Blast Doors CLOSED, and Door A78 CLOSED),

THEN ENSURE one train of Unit 2 Annulus Vacuum Fans are in service (check one).

 2-FAN-65-77, EGTS CNTMT ANN VAC FAN 2A

 2-FAN-65-74, EGTS CNTMT ANN VAC FAN 2B

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 25 of 109 Date ________

4.4 Approvals and Notifications

[1]

OBTAIN permission of the Preoperational Startup Manager to perform this test.

Preoperational Startup Manager Signature Date

[2]

OBTAIN the Unit 2 Supervisors (US/SRO) or Shift Managers (SM) authorization to perform this test.

US/SRO/SM Signature Date

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 26 of 109 Date ________

5.0 ACCEPTANCE CRITERIA A.

The Upper Containment Coolers will maintain design temperatures in the Upper Containment areas as follows:

Operating Coolers Upper Compartment Weighted Average Air Temperature is greater than 62.1F and less than 107.9F1 UCC 2A UCC 2B UCC 2C 6.1.1[6]

UCC 2A UCC 2B UCC 2D 6.1.2[6]

UCC 2A UCC 2C UCC 2D 6.1.3[6]

UCC 2B UCC 2C UCC 2D 6.1.4[6]

1 Required value is 60F to 110F, reduced to 62.1F to 107.9F to account for instrument inaccuracies described in NESSD 2-T-30-210.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 27 of 109 Date ________

5.0 ACCEPTANCE CRITERIA (continued)

B.

The Lower Containment Coolers in conjunction with the CRDM Coolers (operating in Shroud Suction mode), will maintain design temperatures in the Lower Containment areas as follows:

Operating Coolers Lower Compartment Weighted Average Air Temperature is between 62.5F and 117.5F2 Incore Instrument Room Temperature is between 63.6F and 96.4F3 LCC 2A-A LCC 2B-B LCC 2C-A CRDM Cooler 2A-A CRDM Cooler 2C-A IIRAC 2A 6.2.1[6]A 6.2.1[6]B LCC 2A-A LCC 2B-B LCC 2D-B CRDM Cooler 2A-A CRDM Cooler 2B-B IIRAC 2A 6.2.2[6]A 6.2.2[6]B LCC 2A-A LCC 2C-A LCC 2D-B CRDM Cooler 2C-A CRDM Cooler 2D-B IIRAC 2B 6.2.3[6]A 6.2.3[6]B LCC 2B-B LCC 2C-A LCC 2D-B CRDM Cooler 2B-B CRDM Cooler 2D-B IIRAC 2B 6.2.4[6]A 6.2.4[6]B 2

3 Required value is 60F to 120F, reduced to 62.5F to 117.5F to account for instrument inaccuracies described in NESSD 2-T-30-210.

Required value is 60F to 100F, reduced to 63.6F to 96.4F to account for instrument inaccuracies described in NESSD 2-T-30-210.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 28 of 109 Date ________

6.0 PERFORMANCE NOTES

1)

Section 6.1 of this instruction may be performed in parallel with Section 6.2. The Subsections within Section 6.1 and 6.2 may be performed in any order at the discretion of the Test Director.

2)

A minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is required to elapse (with the specified coolers in operation) between performing the first cooler alignment and collecting the first set of data in both Section 6.1 and Section 6.2. A minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is required between subsequent sets of data within each Subsection. A minimum of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is required between subsequent Subsections. The Test Engineer may obtain and record additional data during the test. The flowchart below shows the general progression of steps and waiting periods in this test within both Section 6.1 and Section 6.2.

3)

If the minimum required ICS points are Out of Service, temperature measurement may be performed using Appendix H.

4)

Verification of equipment status may be made either locally at the device or remotely by indication in the Main Control Room, Auxiliary Control Room, or at the breaker compartment, as applicable. See Table 1 for equipment locations.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 29 of 109 Date ________

6.1 Upper Compartment Air Mass Temperature 6.1.1 Upper Compartment Coolers 2A, 2B, 2C

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.1 and Subsection 6.1.1 have been completed.

[2]

ENSURE the Upper Compartment Coolers are aligned as follows:

A.

2-CCU-30-95, CNTMT UPPER COMPARTMENT COOLER 2A, is ON B.

2-CCU-30-97, CNTMT UPPER COMPARTMENT COOLER 2B, is ON C.

2-CCU-30-99, CNTMT UPPER COMPARTMENT COOLER 2C, is ON D.

2-CCU-30-100, CNTMT UPPER COMPARTMENT COOLER 2D, is OFF NOTE Temperature controllers for in-service UCCs may be adjusted by Operations to maintain Upper Compartment weighted-average air temperature within Tech Spec limit (60 - 110F).

UCC temperature controller setpoints shall NOT be adjusted above 110F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

IF the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.1.1 in step 4.3[3]), THEN PERFORM Section 2.0 of Appendix H.

(Step 6.1.1[5] may be marked N/A)

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 30 of 109 Date ________

6.1.1 Upper Compartment Coolers 2A, 2B, 2C (continued)

[5]

COLLECT Upper Compartment Temperature Survey data as delineated on Data Sheet 1, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 1 (Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

[6]

RECORD the Average Upper Compartment Air Mass Temperature for Subsection 6.1.1, AND VERIFY it meets Acceptance Criteria.

Data Source: (check one)

 ICS Point U9019 from Data Sheet 1

 TUP from Appendix H

F Acc Crit: 62.1F to 107.9F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Upper Compartment Temperature Survey data collected in Subsection 6.1.1 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 31 of 109 Date ________

6.1.2 Upper Compartment Coolers 2A, 2B, 2D

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.1 and Subsection 6.1.2 have been completed.

[2]

ENSURE the Upper Compartment Coolers are aligned as follows:

A.

2-CCU-30-95, CNTMT UPPER COMPARTMENT COOLER 2A, is ON B.

2-CCU-30-97, CNTMT UPPER COMPARTMENT COOLER 2B, is ON C.

2-CCU-30-99, CNTMT UPPER COMPARTMENT COOLER 2C, is OFF D.

2-CCU-30-100, CNTMT UPPER COMPARTMENT COOLER 2D, is ON NOTE Temperature controllers for in-service UCCs may be adjusted by Operations to maintain Upper Compartment weighted-average air temperature within Tech Spec limit (60 - 110F).

UCC temperature controller setpoints shall NOT be adjusted above 110F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

IF the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.1.2 in step 4.3[3]), THEN PERFORM Section 2.0 of Appendix H.

(Step 6.1.2[5] may be marked N/A)

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 32 of 109 Date ________

6.1.2 Upper Compartment Coolers 2A, 2B, 2D (continued)

[5]

COLLECT Upper Compartment Temperature Survey data as delineated on Data Sheet 2, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 2 (Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

[6]

RECORD the Average Upper Compartment Air Mass Temperature for Subsection 6.1.2, AND VERIFY it meets Acceptance Criteria.

Data Source: (check one)

 ICS Point U9019 from Data Sheet 2

 TUP from Appendix H

F Acc Crit: 62.1F to 107.9F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Upper Compartment Temperature Survey data collected in Subsection 6.1.2 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 33 of 109 Date ________

6.1.3 Upper Compartment Coolers 2A, 2C, 2D

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.1 and Subsection 6.1.3 have been completed.

[2]

ENSURE the Upper Compartment Coolers are aligned as follows:

A.

2-CCU-30-95, CNTMT UPPER COMPARTMENT COOLER 2A, is ON B.

2-CCU-30-97, CNTMT UPPER COMPARTMENT COOLER 2B, is OFF C.

2-CCU-30-99, CNTMT UPPER COMPARTMENT COOLER 2C, is ON D.

2-CCU-30-100, CNTMT UPPER COMPARTMENT COOLER 2D, is ON NOTE Temperature controllers for in-service UCCs may be adjusted by Operations to maintain Upper Compartment weighted-average air temperature within Tech Spec limit (60 - 110F).

UCC temperature controller setpoints shall NOT be adjusted above 110F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

IF the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.1.3 in step 4.3[3]), THEN PERFORM Section 2.0 of Appendix H.

(Step 6.1.3[5] may be marked N/A)

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 34 of 109 Date ________

6.1.3 Upper Compartment Coolers 2A, 2C, 2D (continued)

[5]

COLLECT Upper Compartment Temperature Survey data as delineated on Data Sheet 3, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 3 (Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

[6]

RECORD the Average Upper Compartment Air Mass Temperature for Subsection 6.1.3, AND VERIFY it meets Acceptance Criteria.

Data Source: (check one)

 ICS Point U9019 from Data Sheet 3

 TUP from Appendix H

F Acc Crit: 62.1F to 107.9F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Upper Compartment Temperature Survey data collected in Subsection 6.1.3 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 35 of 109 Date ________

6.1.4 Upper Compartment Coolers 2B, 2C, 2D

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.1 and Subsection 6.1.4 have been completed.

[2]

ENSURE the Upper Compartment Coolers are aligned as follows:

A.

2-CCU-30-95, CNTMT UPPER COMPARTMENT COOLER 2A, is OFF B.

2-CCU-30-97, CNTMT UPPER COMPARTMENT COOLER 2B, is ON C.

2-CCU-30-99, CNTMT UPPER COMPARTMENT COOLER 2C, is ON D.

2-CCU-30-100, CNTMT UPPER COMPARTMENT COOLER 2D, is ON NOTE Temperature controllers for in-service UCCs may be adjusted by Operations to maintain Upper Compartment weighted-average air temperature within Tech Spec limit (60 - 110F).

UCC temperature controller setpoints shall NOT be adjusted above 110F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

F the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.1.4 in step 4.3[3]), THEN PERFORM Section 2.0 of Appendix H.

(Step 6.1.4[5] may be marked N/A)

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 36 of 109 Date ________

6.1.4 Upper Compartment Coolers 2B, 2C, 2D (continued)

[5]

COLLECT Upper Compartment Temperature Survey data as delineated on Data Sheet 4, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 4.

(Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

[6]

RECORD the Average Upper Compartment Air Mass Temperature for Subsection 6.1.4, AND VERIFY it meets Acceptance Criteria.

Data Source: (check one)

 ICS Point U9019 from Data Sheet 4

 TUP from Appendix H

F Acc Crit: 62.1F to 107.9F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Upper Compartment Temperature Survey data collected in Subsection 6.1.4 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 37 of 109 Date ________

6.2 Lower Compartment Air Mass Temperature 6.2.1 Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.2 and Subsection 6.2.1 have been completed.

[2]

ENSURE the various coolers in Lower Containment are aligned in accordance with Appendix G for Subsection 6.2.1.

NOTE Temperature controllers for in-service LCCs and CRDM Coolers may be adjusted by Operations to maintain Lower Compartment weighted-average air temperature within Tech Spec limit (60 - 120F). LCC and CRDM Cooler temperature controller setpoints shall NOT be adjusted above 120F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

IF the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.2.1 in step 4.3[3]), THEN PERFORM Section 3.0 of Appendix H.

(Step 6.2.1[5] may be marked N/A)

[5]

COLLECT Lower Compartment Temperature Survey data as delineated on Data Sheet 5, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 5.

(Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 38 of 109 Date ________

6.2.1 Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A (continued)

[6]

RECORD the following Lower Compartment Temperature Data for Subsection 6.2.1, AND VERIFY they meet Acceptance Criteria.

A.

Average Lower Compartment Air Mass Temperature Data Source (check one)

 ICS Point U9020 from Data Sheet 5

 TLOW from Appendix H

F Acc Crit: 62.5F to 117.5F B.

Incore Instrument Room Temperature:

Data Source (check one)

 ICS Point T1029A from Data Sheet 5

 2-TE-30-210AD from Appendix H

F Acc Crit: 63.6F to 96.4F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Lower Compartment Temperature Survey data collected in Subsection 6.2.1 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 39 of 109 Date ________

6.2.2 Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.2 and Subsection 6.2.2 have been completed.

[2]

ENSURE the various coolers in Lower Containment are aligned in accordance with Appendix G for Subsection 6.2.2.

NOTE Temperature controllers for in-service LCCs and CRDM Coolers may be adjusted by Operations to maintain Lower Compartment weighted-average air temperature within Tech Spec limit (60 - 120F). LCC and CRDM Cooler temperature controller setpoints shall NOT be adjusted above 120F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

IF the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.2.2 in step 4.3[3]), THEN PERFORM Section 3.0 of Appendix H.

(Step 6.2.2[5] may be marked N/A)

[5]

COLLECT Lower Compartment Temperature Survey data as delineated on Data Sheet 6, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 6.

(Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 40 of 109 Date ________

6.2.2 Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A (continued)

[6]

RECORD the following Lower Compartment Temperature Data for Subsection 6.2.2, AND VERIFY they meet Acceptance Criteria.

A.

Average Lower Compartment Air Mass Temperature Data Source (check one)

 ICS Point U9020 from Data Sheet 6

 TLOW from Appendix H

F Acc Crit: 62.5F to 117.5F B.

Incore Instrument Room Temperature:

Data Source (check one)

 ICS Point T1029A from Data Sheet 6

 2-TE-30-210AD from Appendix H

F Acc Crit: 63.6F to 96.4F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Lower Compartment Temperature Survey data collected in Subsection 6.2.2 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 41 of 109 Date ________

6.2.3 Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.2 and Subsection 6.2.3 have been completed.

[2]

ENSURE the various coolers in Lower Containment are aligned in accordance with Appendix G for Subsection 6.2.3.

NOTE Temperature controllers for in-service LCCs and CRDM Coolers may be adjusted by Operations to maintain Lower Compartment weighted-average air temperature within Tech Spec limit (60 - 120F). LCC and CRDM Cooler temperature controller setpoints shall NOT be adjusted above 120F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

IF the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.2.3 in step 4.3[3]), THEN PERFORM Section 3.0 of Appendix H.

(Step 6.2.3[5] may be marked N/A)

[5]

COLLECT Lower Compartment Temperature Survey data as delineated on Data Sheet 7, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 7.

(Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 42 of 109 Date ________

6.2.3 Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B (continued)

[6]

RECORD the following Lower Compartment Temperature Data for Subsection 6.2.3, AND VERIFY they meet Acceptance Criteria.

A.

Average Lower Compartment Air Mass Temperature Data Source (check one)

 ICS Point U9020 from Data Sheet 7

 TLOW from Appendix H

F Acc Crit: 62.5F to 117.5F B.

Incore Instrument Room Temperature:

Data Source (check one)

 ICS Point T1029A from Data Sheet 7

 2-TE-30-210AD from Appendix H

F Acc Crit: 63.6F to 96.4F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Lower Compartment Temperature Survey data collected in Subsection 6.2.3 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 43 of 109 Date ________

6.2.4 Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B

[1]

ENSURE all prerequisites listed in Section 4.0 for Section 6.2 and Subsection 6.2.4 have been completed.

[2]

ENSURE the various coolers in Lower Containment are aligned in accordance with Appendix G for Subsection 6.2.4.

NOTE Temperature controllers for in-service LCCs and CRDM Coolers may be adjusted by Operations to maintain Lower Compartment weighted-average air temperature within Tech Spec limit (60 - 120F). LCC and CRDM Cooler temperature controller setpoints shall NOT be adjusted above 120F.

[3]

VERIFY the required minimum time has elapsed (with the specified coolers in operation) before collecting data.

(See Note 2 at the beginning of Section 6.0 for clarification)

 24 hrs  4 hrs

[4]

IF the minimum required ICS points are out of service (NO selected for any of the items pertaining to Subsection 6.2.4 in step 4.3[3]), THEN PERFORM Section 3.0 of Appendix H.

(Step 6.2.4[5] may be marked N/A)

[5]

COLLECT Lower Compartment Temperature Survey data as delineated on Data Sheet 8, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 8.

(Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 44 of 109 Date ________

6.2.4 Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B (continued)

[6]

RECORD the following Lower Compartment Temperature Data for Subsection 6.2.4, AND VERIFY they meet Acceptance Criteria.

A.

Average Lower Compartment Air Mass Temperature Data Source (check one)

 ICS Point U9020 from Data Sheet 8

 TLOW from Appendix H

F Acc Crit: 62.5F to 117.5F B.

Incore Instrument Room Temperature:

Data Source (check one)

 ICS Point T1029A from Data Sheet 8

 2-TE-30-210AD from Appendix H

F Acc Crit: 63.6F to 96.4F NOTE Include a copy of all applicable sections of the CTL, Data Sheets, and any other pertinent test documentation in the following step.

[7]

DELIVER a copy of the Lower Compartment Temperature Survey data collected in Subsection 6.2.4 to Engineering for their review and evaluation.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 45 of 109 Date ________

7.0 POST PERFORMANCE ACTIVITY

[1]

VERIFY Engineering has reviewed and evaluated each Subsections test data to the extent necessary and any request for additional data has been addressed, AND ATTACH copies of Engineering concurrence for each Subsection to the data package.

A.

Subsection 6.1.1 B.

Subsection 6.1.2 C.

Subsection 6.1.3 D.

Subsection 6.1.4 E.

Subsection 6.2.1 F.

Subsection 6.2.2 G. Subsection 6.2.3 H.

Subsection 6.2.4

[2]

ENSURE ultrasonic flowmeters and thermocouples listed in Appendix E have been removed.

[3]

ENSURE any insulation removed to support installation of the ultrasonic flowmeters has been reinstalled.

WO ________________

NOTE The plant equipment used to verify acceptance criteria are thermocouples and cannot be calibrated. Their computer points are software calibration only. Post-test calibration of these instruments is not necessary and will not be performed.

[4]

NOTIFY the Unit 2 US/SRO of the test completion and system alignment and that the Containment Air Cooling System may be aligned as needed to support HFT.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 46 of 109 Date ________

8.0 RECORDS A.

QA Records Completed Test Package B.

Non-QA Records None

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 47 of 109 Appendix A (Page 1 of 2)

TEST PROCEDURES/INSTRUCTIONS REFERENCE REVIEW Date ________

NOTES

1)

Additional copies of this table may be made as necessary

2)

Initial and date indicates review has been completed for impact PROCEDURE/

INSTRUCTION REVISION/CHANGES IMPACT Yes/No INITIAL AND DATE.

(N/A for no change) 2-TSD-30L-1 FSAR Section 9.4.7 Table 14.2-1 Sh 38 & 39 Unit 2 Tech Specs Section 3.6.5 2-PTI-067-02-A 2-PTI-067-02-B WBN2-30RB-4002 2-T-30-210 SSD-2-LPT-67-84 SSD-2-LPT-67-92 SSD-2-LPT-67-100 SSD-2-LPT-67-108 SSD-2-LPT-67-85 SSD-2-LPT-67-93 SSD-2-LPT-67-101 SSD-2-LPT-67-109

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 48 of 109 Appendix A (Page 2 of 2)

TEST PROCEDURES/INSTRUCTIONS REFERENCE REVIEW Date ________

PROCEDURE/

INSTRUCTION REVISION/CHANGES IMPACT Yes/No INITIAL AND DATE.

(N/A for no change)

SSD-2-LPT-67-129 SSD-2-LPT-67-132 SSD-2-LPT-67-137 SSD-2-LPT-67-140

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 49 of 109 Appendix B (Page 1 of 1)

TEMPORARY CONDITION LOG Date ________

NOTES

1)

Additional copies of this table may be made as necessary

2)

These steps will be N/Ad if no temporary condition existed.

ITEM No.

TEMPORARY CONDITION DESCRIPTION PERFORMED RETURNED TO NORMAL Step No.

Performed By/Date CV By/Date Step No.

Returned By/Date CV By/Date

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 50 of 109 Appendix C (Page 1 of 6)

PERMANENT PLANT INSTRUMENTATION LOG Date ________

INSTRUMENT OR INSTRUMENT LOOP #

CAL DUE DATE FILLED AND VENTED1 PLACED IN SERVICE1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE2 POST-TEST CALIBRATION ACCEPTABLE2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 2-TE-30-210A N/A YES N/A3 N/A3 2-TE-30-210B N/A YES N/A3 N/A3 2-TE-30-210C N/A YES N/A3 N/A3 2-TE-30-210D N/A YES N/A3 N/A3 2-TE-30-210E N/A YES N/A3 N/A3 2-TE-30-210F N/A YES N/A3 N/A3 2-TE-30-210G N/A NO N/A N/A 2-TE-30-210H N/A NO N/A N/A 2-TE-30-210I N/A NO N/A N/A 2-TE-30-210J N/A NO N/A N/A 2-TE-30-210K N/A NO N/A N/A 2-TE-30-210L N/A NO N/A N/A 2-TE-30-210M N/A NO N/A N/A 2-TE-30-210N N/A NO N/A N/A 2-TE-30-210O N/A YES N/A3 N/A3 2-TE-30-210P N/A YES N/A3 N/A3 2-TE-30-210Q N/A YES N/A3 N/A3 2-TE-30-210R N/A YES N/A3 N/A3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 51 of 109 Appendix C (Page 2 of 6)

PERMANENT PLANT INSTRUMENTATION LOG Date ________

INSTRUMENT OR INSTRUMENT LOOP #

CAL DUE DATE FILLED AND VENTED1 PLACED IN SERVICE1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE2 POST-TEST CALIBRATION ACCEPTABLE2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 2-TE-30-210S N/A YES N/A3 N/A3 2-TE-30-210T N/A YES N/A3 N/A3 2-TE-30-210U N/A YES N/A3 N/A3 2-TE-30-210V N/A YES N/A3 N/A3 2-TE-30-210W N/A YES N/A3 N/A3 2-TE-30-210X N/A YES N/A3 N/A3 2-TE-30-210Y N/A YES N/A3 N/A3 2-TE-30-210Z N/A YES N/A3 N/A3 2-TE-30-210AA N/A YES N/A3 N/A3 2-TE-30-210AB N/A YES N/A3 N/A3 2-TE-30-210AC N/A YES N/A3 N/A3 2-TE-30-210AD N/A YES N/A3 N/A3 2-TE-30-210AE N/A YES N/A3 N/A3 2-TE-30-210AF N/A YES N/A3 N/A3 2-TE-30-210AG N/A YES N/A3 N/A3 2-TE-30-210AH N/A YES N/A3 N/A3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 52 of 109 Appendix C (Page 3 of 6)

PERMANENT PLANT INSTRUMENTATION LOG Date ________

INSTRUMENT OR INSTRUMENT LOOP #

CAL DUE DATE FILLED AND VENTED1 PLACED IN SERVICE1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE2 POST-TEST CALIBRATION ACCEPTABLE2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 2-TE-30-211A N/A NO N/A N/A 2-TE-30-211B N/A NO N/A N/A 2-TE-30-211C N/A NO N/A N/A 2-TE-30-211D N/A NO N/A N/A 2-TE-30-211E N/A NO N/A N/A 2-TE-30-211F N/A NO N/A N/A 2-TE-30-211G N/A NO N/A N/A 2-TE-30-211H N/A NO N/A N/A 2-TE-30-211I N/A NO N/A N/A 2-TE-30-211J N/A NO N/A N/A 2-TE-30-211K N/A NO N/A N/A 2-TE-30-211L N/A NO N/A N/A 2-TE-30-211M N/A NO N/A N/A 2-TE-30-211N N/A NO N/A N/A 2-TE-30-211O N/A NO N/A N/A 2-TE-30-211P N/A NO N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 53 of 109 Appendix C (Page 4 of 6)

PERMANENT PLANT INSTRUMENTATION LOG Date ________

INSTRUMENT OR INSTRUMENT LOOP #

CAL DUE DATE FILLED AND VENTED1 PLACED IN SERVICE1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE2 POST-TEST CALIBRATION ACCEPTABLE2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 2-TE-30-211Q N/A NO N/A N/A 2-TE-30-211R N/A NO N/A N/A 2-TE-30-211S N/A NO N/A N/A 2-TE-30-211T N/A NO N/A N/A 2-TE-30-211U N/A NO N/A N/A 2-TE-30-211V N/A NO N/A N/A 2-ME-30-240 N/A NO N/A N/A 2-ME-30-241 N/A NO N/A N/A 2-LPT-31-307 N/A NO N/A N/A 2-LPT-31-328 N/A NO N/A N/A 2-TI-31-300 N/A NO N/A N/A 2-TI-31-312 N/A NO N/A N/A 2-TI-31-320 N/A NO N/A N/A 2-TI-31-333 N/A NO N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 54 of 109 Appendix C (Page 5 of 6)

PERMANENT PLANT INSTRUMENTATION LOG Date ________

INSTRUMENT OR INSTRUMENT LOOP #

CAL DUE DATE FILLED AND VENTED1 PLACED IN SERVICE1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE2 POST-TEST CALIBRATION ACCEPTABLE2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 2-LPT-67-129 N/A NO N/A N/A 2-LPT-67-137 N/A NO N/A N/A 2-LPT-67-132 N/A NO N/A N/A 2-LPT-67-140 N/A NO N/A N/A 2-LPT-67-84 N/A NO N/A N/A 2-LPT-67-92 N/A NO N/A N/A 2-LPT-67-100 N/A NO N/A N/A 2-LPT-67-108 N/A NO N/A N/A 2-LPT-67-85 N/A NO N/A N/A 2-LPT-67-93 N/A NO N/A N/A 2-LPT-67-101 N/A NO N/A N/A 2-LPT-67-109 N/A NO N/A N/A 2-LPT-67-4554 N/A NO N/A N/A 2-LPT-67-4564 N/A NO N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 55 of 109 Appendix C (Page 6 of 6)

PERMANENT PLANT INSTRUMENTATION LOG Date ________

INSTRUMENT OR INSTRUMENT LOOP #

CAL DUE DATE FILLED AND VENTED1 PLACED IN SERVICE1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE2 POST-TEST CALIBRATION ACCEPTABLE2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 2-FI-67-263 NO N/A N/A 2-FI-67-265 NO N/A N/A 2-FI-67-267 NO N/A N/A 2-FI-67-269 NO N/A N/A 2-FI-67-332 NO N/A N/A 2-FI-67-333 NO N/A N/A 2-FI-67-334 NO N/A N/A 2-FI-67-335 NO N/A N/A 1

2 3

4 These items may be initialed and dated by personnel performing the task. Instrumentation not required to be filled and vented may be identified as Not Applicable. (N/A)

May be identified as Not Applicable (N/A) if instrument was not used to verify/record quantitative acceptance criteria data.

These Temperature Elements cannot be calibrated and their computer points are software calibration only. Post-test calibration of these instruments is not necessary and will not be performed These instrument loops are under Unit 1 control.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 56 of 109 Appendix D (Page 1 of 3)

ICS Points Date ________

Group ICS Point Description Point Status (circle one)

Initials Upper 1 T1000A1 CNTMT AIR TEMP AZ/EL 270/868 DOME In Scan / OOS N/A T1001A2 CNTMT TEMP 104/796 PRZ CEILG In Scan / OOS N/A T1002A2 CNTMT TEMP 0/796 SG ENCL CEILG In Scan / OOS N/A T1003A2 CNTMT TEMP 180/796 SG ENCL CEILG In Scan / OOS Lower 1 T1004A2 CNTMT TEMP 184/708 RX SHLD WALL In Scan / OOS Lower 1 T1005A2 CNTMT TEMP 0/708 RX SHLD WALL In Scan / OOS N/A T1006A CNTMT TEMP 67/708 UN RX VSL SUPP1 In Scan / OOS N/A T1007A CNTMT TEMP 158/708 UN RX VSL SUPP2 In Scan / OOS N/A T1008A CNTMT TEMP 247/708 UN RX VSL SUPP3 In Scan / OOS N/A T1009A CNTMT TEMP 338/708 UN RX VSL SUPP4 In Scan / OOS N/A T1010A CNTMT TEMP EL719 OPP RX VSL NOZL 1 In Scan / OOS N/A T1011A CNTMT TEMP EL719 OPP RX VSL NOZL 2 In Scan / OOS N/A T1012A CNTMT TEMP EL719 OPP RX VSL NOZL 3 In Scan / OOS N/A T1013A CNTMT TEMP EL719 OPP RX VSL NOZL 4 In Scan / OOS N/A T1014A2 CNTMT TEMP 45/753 OPP REFUEL GATE In Scan / OOS Lower 1 T1015A2 CNTMT TEMP 104/726 IN PZR SUPP PLTF In Scan / OOS Upper 1 T1016A1 CNTMT TEMP 55/809 ICE COND WALL In Scan / OOS Upper 1 T1017A1 CNTMT TEMP 235/809 ICE WALL OPP SID In Scan / OOS Upper 2 T1018A1 CNTMT TEMP 92/799 PRZR ENCL WALL In Scan / OOS Upper 2 T1019A1 CNTMT TEMP 285/766 ICE OPP PZR In Scan / OOS Upper 2 T1020A1 CNTMT TEMP 180/766 SG ENCL WALL In Scan / OOS Upper 2 T1021A1 CNTMT TEMP 0/766 SG ENCL OPP SIDE In Scan / OOS

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 57 of 109 Appendix D (Page 2 of 3)

ICS Points Date ________

Group ICS Point Description Point Status (circle one)

Initials Lower 2 T1022A2 CNTMT TEMP 126/745 ICE PLTFM RCP#2 In Scan / OOS Lower 2 T1023A2 CNTMT TEMP 309/745 ICE PLTFM RCP#4 In Scan / OOS Lower 2 T1024A2 CNTMT TEMP 201/745 ICE PLTFM SG#3 In Scan / OOS Lower 2 T1025A2 CNTMT TEMP 22/745 ICE PLTFM SG#1 In Scan / OOS N/A T1026A2 CNTMT TEMP 90/687 SUMP In Scan / OOS Lower 3 T1027A2 CNTMT TEMP 0/723 FAN COMPT WALL In Scan / OOS Lower 3 T1028A2 CNTMT TEMP 180/723 FAN COMPT WALL In Scan / OOS N/A T1029A2 CNTMT TEMP 90/716 INSTR RM WALL In Scan / OOS Lower 3 T1030A2 CNTMT TEMP 40/723 ACCUM RM WALL In Scan / OOS Lower 3 T1031A2 CNTMT TEMP 140/723 ACCUM RM WALL In Scan / OOS Lower 3 T1032A2 CNTMT TEMP 220/723 ACCUM RM WALL In Scan / OOS Lower 3 T1033A2 CNTMT TEMP 320/723 ACCUM RM WALL In Scan / OOS N/A T1100A CRDM COOL UNIT A-A EXHAUST In Scan / OOS N/A T1101A CRDM COOL UNIT B-B EXHAUST In Scan / OOS N/A T1102A CRDM COOL UNIT C-A EXHAUST In Scan / OOS N/A T1103A CRDM COOL UNIT D-B EXHAUST In Scan / OOS N/A T1104A CRDM COOL UNIT C-A B-B INTAKE In Scan / OOS N/A T1105A CDRM COOL UNIT A-A D-B INTAKE In Scan / OOS N/A T1110A LOWR COMPT COOL UNIT A-A EXHAUST In Scan / OOS N/A T1111A LOWR COMPT COOL UNIT B-B EXHAUST In Scan / OOS N/A T1112A LOWR COMPT COOL UNIT C-A EXHAUST In Scan / OOS N/A T1113A LOWR COMPT COOL UNIT D-B EXHAUST In Scan / OOS N/A T1114A LOWER COMPT COOL UNIT A-A INTAKE In Scan / OOS N/A T1115A LOWER COMPT COOL UNIT B-B INTAKE In Scan / OOS N/A T1116A LOWER COMPT COOL UNIT C-A INTAKE In Scan / OOS

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 58 of 109 Appendix D (Page 3 of 3)

ICS Points Date ________

Group ICS Point Description Point Status (circle one)

Initials N/A T1117A LOWER COMPT COOL UNIT D-B INTAKE In Scan / OOS N/A T1118A UPPER COMPT COOL UNIT A INTAKE In Scan / OOS N/A T1119A UPPER COMPT COOL UNIT B INTAKE In Scan / OOS N/A T1120A UPPER COMPT COOL UNIT C INTAKE In Scan / OOS N/A T1121A UPPER COMPT COOL UNIT D INTAKE In Scan / OOS N/A T1122A UPPER COMPT COOL UNIT A EXHAUST In Scan / OOS N/A T1123A UPPER COMPT COOL UNIT B EHXUAST In Scan / OOS N/A T1124A UPPER COMPT COOL UNIT C EXHAUST In Scan / OOS N/A T1125A UPPER COMPT COOL UNIT D EXHAUST In Scan / OOS N/A T2614A3 ERCW SUP HDR 2A TEMP In Scan / OOS N/A T2615A3 ERCW SUP HDR 2B TEMP In Scan / OOS N/A U90191 CNTMT UPPER CMPT AVG MASS AIR TEMP In Scan / OOS N/A U90202 CNTMT LOWER CMPT AVG MASS AIR T In Scan / OOS N/A Y0701A CNTMT UP-COMPARTMENT DEW PT TEMP In Scan / OOS N/A Y0702A CNTMT LOW-COMPARTMENT DEW PT TEMP In Scan / OOS 1

2 3

These ICS Points are required for performance of Section 6.1. If the minimum required points are OOS, then Appendix H may be used to determine the Upper Compartment Weighted Average Air Temperature.

These ICS Points are required for performance of Section 6.2. If the minimum required points are OOS, then Appendix H may be used to determine the Lower Compartment Weighted Average Air Temperature.

These ICS Points are under Unit 1 control

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 59 of 109 Appendix E (Page 1 of 5)

ERCW Flow and Temperature M&TE Date ________

Upper Compartment Air Mass Temperature - Section 6.1 UNID Description Location Additional Information M&TE ID Installed Removed 1st CV 2-TW-67-262 UPPER CNTMT VENT CLR A DISCH TEMP EL 802 AZ 37

minimum range:

32-150F 2-TW-67-266 UPPER CNTMT VENT CLR B DISCH TEMP EL 802 AZ 149

minimum range:

32-150F 2-TW-67-264 UPPER CNTMT VENT CLR C DISCH TEMP EL 802 AZ 215

minimum range:

32-150F 2-TW-67-268 UPPER CNTMT VENT CLR D DISCH TEMP EL 802 AZ 325

minimum range:

32-150F

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 60 of 109 Appendix E (Page 2 of 5)

ERCW Flow and Temperature M&TE Date ________

Lower Compartment Air Mass Temperature - Section 6.2 UNID/Location Description Location Additional Information Subsection 6.2.1 Subsection 6.2.2 Subsection 6.2.3 Subsection 6.2.4 Removed M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS 1st CV Ultrasonic Flowmeter near 2-FE-67-471 LOW CNTMT VENT CLR A DISCH FLOW EL 726 AZ 21

(S Fan Rm) 6 Schedule 40S Stainless Steel Pipe Ultrasonic Flowmeter near 2-FE-67-474 LOW CNTMT VENT CLR B DISCH FLOW EL 726 AZ 159

(N Fan Rm) 6 Schedule 40S Stainless Steel Pipe Ultrasonic Flowmeter near 2-FE-67-472 LOW CNTMT VENT CLR C DISCH FLOW EL 726 AZ 201

(N Fan Rm) 6 Schedule 40S Stainless Steel Pipe Ultrasonic Flowmeter near 2-FE-67-476 LOW CNTMT VENT CLR D DISCH FLOW EL 726 AZ 339

(S Fan Rm) 6 Schedule 40S Stainless Steel Pipe 2-TW-67-230 LWR CNTMT VENT CLR A DISCH TEMP EL 721 AZ 9

(S Fan Rm) minimum range:

32-150F 2-TW-67-244 LWR CNTMT VENT CLR B DISCH TEMP EL 721 AZ 171

(N Fan Rm) minimum range:

32-150F

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 61 of 109 Appendix E (Page 3 of 5)

ERCW Flow and Temperature M&TE Date ________

Lower Compartment Air Mass Temperature - Section 6.2 UNID/Location Description Location Additional Information Subsection 6.2.1 Subsection 6.2.2 Subsection 6.2.3 Subsection 6.2.4 Removed M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS 1st CV 2-TW-67-236 LWR CNTMT VENT CLR C DISCH TEMP EL 721 AZ 187

(N Fan Rm) minimum range:

32-150F 2-TW-67-250 LWR CNTMT VENT CLR D DISCH TEMP EL 721 AZ 351

(S Fan Rm) minimum range:

32-150F Ultrasonic Flowmeter near 2-FE-67-470 CONT ROD DRIVE VENT CLR A DISCH FLOW EL 720 AZ 9

3 Schedule 40S Stainless Steel Pipe Ultrasonic Flowmeter near 2-FE-67-477 CONT ROD DRIVE VENT CLR B DISCH FLOW EL 720 AZ 171

3 Schedule 40S Stainless Steel Pipe Ultrasonic Flowmeter near 2-FE-67-473 CONT ROD DRIVE VENT CLR C DISCH FLOW EL 720 AZ 187

3 Schedule 40S Stainless Steel Pipe Ultrasonic Flowmeter near 2-FE-67-475 CONT ROD DRIVE VENT CLR D DISCH FLOW EL 720 AZ 351

3 Schedule 40S Stainless Steel Pipe

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 62 of 109 Appendix E (Page 4 of 5)

ERCW Flow and Temperature M&TE Date ________

Lower Compartment Air Mass Temperature - Section 6.2 UNID/Location Description Location Additional Information Subsection 6.2.1 Subsection 6.2.2 Subsection 6.2.3 Subsection 6.2.4 Removed M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS 1st CV 2-TW-67-232 CONTROL ROD DR VENT CLR A DISCH TEMP EL 725 AZ 9

(S Fan Rm) minimum range:

32-150F 2-TW-67-246 CONTROL ROD DR VENT CLR B DISCH TEMP EL 725 AZ 171

(N Fan Rm) minimum range:

32-150F 2-TW-67-238 CONTROL ROD DR VENT CLR C DISCH TEMP EL 725 AZ 187

(N Fan Rm) minimum range:

32-150F 2-TW-67-252 CONTROL ROD DR VENT CLR D DISCH TEMP EL 725 AZ 351

(S Fan Rm) minimum range:

32-150F Ultrasonic Flowmeter near 2-FE-67-257 INSTR RM VENT CLR A DISCH FLOW A12W / 692 (692 Pent Rm) 11/2 Schedule 40S Stainless Steel Pipe Ultrasonic Flowmeter near 2-FE-67-259 INSTR RM VENT CLR B DISCH FLOW A12W / 692 (692 Pent Rm) 11/2 Schedule 40S Stainless Steel Pipe

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 63 of 109 Appendix E (Page 5 of 5)

ERCW Flow and Temperature M&TE Date ________

Lower Compartment Air Mass Temperature - Section 6.2 UNID/Location Description Location Additional Information Subsection 6.2.1 Subsection 6.2.2 Subsection 6.2.3 Subsection 6.2.4 Removed M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS M&TE ID INITIALS 1st CV 2-TW-67-256 INSTR RM VENT CLR A DISCH TEMP A12W / 692 (692 Pent Rm) minimum range:

32-150F 2-TW-67-258 INSTR RM VENT CLR B DISCH TEMP A12W / 692 (692 Pent Rm) minimum range:

32-150F Ultrasonic Flowmeter near 2-FE-31-311 INCORE INST RM CHILL A CWS FLOW A12W / 692 (692 Pent Rm) 2 Schedule 40 Carbon Steel Pipe Ultrasonic Flowmeter near 2-FE-31-332 INCORE INST RM CHILL B CWS FLOW A12W / 692 (692 Pent Rm) 2 Schedule 40 Carbon Steel Pipe

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 64 of 109 Appendix F (Page 1 of 2)

Containment and Divider Barrier Boundary Date ________

NOTES

1)

Record significant changes to the Containment Boundary in Remarks below.

2)

Temporary use of plastic sheeting and plywood to establish the Containment Boundary is acceptable.

3)

Additional copies of this table may be made as necessary.

Description Location (AZ/EL)

Desired Position Initials Remarks Equipment Hatch (X-1) 285 / 765' CLOSED Lower Personnel Airlock (X-2A) 162 / 716' CLOSED Upper Personnel Airlock (X-2B) 255 / 757' CLOSED Fuel Transfer Tube (X-3) 262 / 711' CLOSED Maintenance Port (X-37) 265 / 771' CLOSED Thimble Tube (X-54) 90 / 740' CLOSED Ice Blowing (X-79A) 289 / 808' CLOSED Ice Blowing (X-79B) 290 / 808' CLOSED Maintenance Port (X-108) 218 / 711' CLOSED Maintenance Port (X-109) 222 / 711' CLOSED Maintenance Port (X-117) 300 / 758' CLOSED Layup Water Treatment (X-118) 209 / 708' CLOSED Crane Wall Door (Raceway to Loop 3) 226 / 703' CLOSED Crane Wall Door (Raceway to Loop 4) 314 / 703' CLOSED Crane Wall Door (Incore Instr Rm to RCP 2) 134 / 716' CLOSED Crane Wall Door (Acc Rm 4 to Lower Ice Catwalk) 305 / 744' CLOSED Hatch (Incore Instr Rm to Raceway) 162 / 716' CLOSED

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 65 of 109 Appendix F (Page 2 of 2)

Containment and Divider Barrier Boundary Date ________

Description Location (AZ/EL)

Desired Position Initials Remarks Incore Instr Rm Blowout Panel 126 / 730' CLOSED Incore Instr Rm Blowout Panel 54 / 730' CLOSED Ice Condenser Lower Inlet Doors 746' 2-M-9 CLOSED Ice Condenser End Wall 245 / 806' CLOSED Ice Condenser End Wall 305 / 806' CLOSED Personnel Hatch #1 (top of Pressurizer Enclosure) 105 / 802' CLOSED Personnel Hatch #2 (Subhatch) 305 / 757' CLOSED East Refuel Canal Drain Plug 272 / 714' REMOVED West Refuel Canal Drain Plug 268 / 714' REMOVED RCP Access Plug 1 46 / 757' INSTALLED RCP Access Plug 2 134 / 757' INSTALLED RCP Access Plug 3 226 / 757' INSTALLED RCP Access Plug 4 314 / 757' INSTALLED Lower Containment Access Plug 270 / 757' INSTALLED Raceway Access Plug 105 / 757' INSTALLED Reactor Cavity Pressure Relief Panels 750' CLOSED CRDM Missile Shields 760' INSTALLED Transfer Canal Gate Blocks 270 / 713' INSTALLED

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 66 of 109 Appendix G (Page 1 of 2)

Lower Compartment Temperature Survey Cooler Alignments (Section 6.2)

Date ________

UNID NOMENCLATURE Subsection 6.2.1 Subsection 6.2.2 Subsection 6.2.3 Subsection 6.2.4 STATUS INITIALS STATUS INITIALS STATUS INITIALS STATUS INITIALS Lower Compartment Coolers 2-CCU-30-74 CNTMT LOWER COMPARTMENT COOLER 2A-A ON ON ON OFF 2-CCU-30-75 CNTMT LOWER COMPARTMENT COOLER 2B-B ON ON OFF ON 2-CCU-30-77 CNTMT LOWER COMPARTMENT COOLER 2C-A ON OFF ON ON 2-CCU-30-78 CNTMT LOWER COMPARTMENT COOLER 2D-B OFF ON ON ON CRDM Coolers & Associated Dampers 2-CLR-30-83 CRDM COOLER 2A-A ON ON OFF OFF 2-TCO-30-84 1

CRDM COOLER 2A-A SHROUD SUCTION OPEN 1

OPEN 1

CLOSED CLOSED 2-TCO-30-85 CRDM COOLER 2A-A LOWER COMPARTMENT SUCT CLOSED CLOSED CLOSED CLOSED 2-CLR-30-92 CRDM COOLER 2B-B OFF ON OFF ON 2-TCO-30-93 1

CRDM COOLER 2B-B SHROUD SUCTION CLOSED OPEN 1

CLOSED OPEN 1

2-TCO-30-94 CRDM COOLER 2B-B LOWER COMPARTMENT SUCT CLOSED CLOSED CLOSED CLOSED 2-CLR-30-88 CRDM COOLER 2C-A ON OFF ON OFF 2-TCO-30-89 1

CRDM COOLER 2C-A SHROUD SUCTION OPEN 1

CLOSED OPEN 1

CLOSED 2-TCO-30-90 CRDM COOLER 2C-A LOWER COMPARTMENT SUCT CLOSED CLOSED CLOSED CLOSED 2-CLR-30-80 CRDM COOLER 2D-B OFF OFF ON ON 2-TCO-30-81 1

CRDM COOLER 2D-B SHROUD SUCTION CLOSED CLOSED OPEN 1

OPEN 1

2-TCO-30-82 CRDM COOLER 2D-B LOWER COMPARTMENT SUCT CLOSED CLOSED CLOSED CLOSED

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 67 of 109 Appendix G (Page 2 of 2)

Lower Compartment Temperature Survey Cooler Alignments (Section 6.2)

Date ________

UNID NOMENCLATURE Subsection 6.2.1 Subsection 6.2.2 Subsection 6.2.3 Subsection 6.2.4 STATUS INITIALS STATUS INITIALS STATUS INITIALS STATUS INITIALS Incore Instrument Room Air Conditioning 2-AHU-31-265 INCORE INSTRUMENT ROOM AIR HANDLING UNIT 2A ON ON OFF OFF 2-FCO-31-263 2

INCORE INSTR RM AHU 2A DISCHARGE OPEN 2

OPEN 2

CLOSED CLOSED 2-FCO-31-264 2

INCORE INSTR RM AHU 2A DISCHARGE OPEN 2

OPEN 2

CLOSED CLOSED 2-CHR-31-303 2

INCORE INSTR ROOM CHILLER 2A ON 2

ON 2

OFF OFF 2-PMP-31-303/1 2

INCORE INSTR ROOM CW PUMP 2A ON 2

ON 2

OFF OFF 2-AHU-31-266 INCORE INSTRUMENT ROOM AIR HANDLING UNIT 2B OFF OFF ON ON 2-FCO-31-268 2

INCORE INSTR RM AHU 2B DISCHARGE CLOSED CLOSED OPEN 2

OPEN 2

2-FCO-31-269 2

INCORE INSTR RM AHU 2B DISCHARGE CLOSED CLOSED OPEN 2

OPEN 2

2-CHR-31-324 2

INCORE INSTR ROOM CHILLER 2B OFF OFF ON 2

ON 2

2-PMP-31-324/1 2

INCORE INSTR ROOM CW PUMP 2B OFF OFF ON 2

ON 2

1 2

CRDM Shroud Suction Dampers are designed to automatically open if their respective Handswitch is in P AUTO and their associated CRDM Cooler starts.

Incore Instrument Room Air Conditioning Chiller, Pump, and Dampers are designed to automatically start/open when their associated AHU starts.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 68 of 109 Appendix H (Page 1 of 5)

Weighted Average Containment Temperatures - ICS Out of Service Date ________

1.0 NOTES AND GUIDELINES A.

Additional copies of sections of this Appendix, Data Sheet 9, and Data Sheet 10 may be made as necessary.

B.

This Appendix may be used to obtain Containment Temperature data and calculate the Upper or Lower Containment weighted average air temperature if the minimum required ICS Points are Out of Service (OOS) during the performance of this instruction C.

Perform Section 2.0 for Upper Compartment Mass Air Temperature.

D.

Perform Section 3.0 for Lower Compartment Mass Air Temperature and Incore Instrument Room Temperature.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 69 of 109 Appendix H (Page 2 of 5)

Weighted Average Containment Temperatures - ICS Out of Service Date ________

2.0 UPPER COMPARTMENT WEIGHTED AVERAGE AIR TEMPERATURE

[1]

RECORD the Subsection number that this Appendix is being performed in:

Subsection ________

[2]

OBTAIN the following M&TE, or equivalent, AND COMPLETE the following table:

DESCRIPTION MINIMUM RANGE REQUIRED ACCURACY M&TE ID NUMBER CALIBRATION DUE DATE Temperature Indicating Device (Type T Thermocouple) 40 - 175F

 3.6F

[3]

ENSURE M&TE calibration due dates will support the completion of this test performance.

NOTE Step 2.0[4] and 2.0[5] shall be performed in parallel.

[4]

MEASURE Upper Containment Temperature thermocouple temperature as delineated on Data Sheet 9, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 9.

(ENTER OOS for any thermocouple that is NOT indicating)

A.

Set 1 B.

Set 2 C.

Set 3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 70 of 109 Appendix H (Page 3 of 5)

Weighted Average Containment Temperatures - ICS Out of Service Date ________

2.0 UPPER COMPARTMENT WEIGHTED AVERAGE AIR TEMPERATURE (continued)

[5]

COLLECT additional Upper Compartment Temperature Survey data as delineated on Data Sheet 1, 2, 3 or 4, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 1, 2, 3, or 4, as appropriate.

(Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

[6]

VERIFY the following from Data Sheet 9:

A.

At least two (2) of the Group 1 Upper Containment thermocouples NOT OOS.

B.

At least one (1) of the Group 2 Upper Containment thermocouples NOT OOS.

[7]

RECORD the Upper Compartment Air Mass Temperature (TUP) from Data Sheet 9.

TUP =

F

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 71 of 109 Appendix H (Page 4 of 5)

Weighted Average Containment Temperatures - ICS Out of Service Date ________

3.0 LOWER COMPARTMENT WEIGHTED AVERAGE AIR TEMPERATURE

[1]

RECORD the Subsection number that this Appendix is being performed in:

Subsection ________

[2]

OBTAIN the following M&TE, or equivalent, AND COMPLETE the following table:

DESCRIPTION MINIMUM RANGE REQUIRED ACCURACY M&TE ID NUMBER CALIBRATION DUE DATE Temperature Indicating Device (Type T Thermocouple) 40 - 175F

 3.6F

[3]

ENSURE M&TE calibration due dates will support the completion of this test performance.

NOTE Step 3.0[4] and 3.0[5] shall be performed in parallel.

[4]

MEASURE Lower Containment Temperature thermocouple temperature as delineated on Data Sheet 10, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 10.

(ENTER OOS for any thermocouple that is NOT indicating)

A.

Set 1 B.

Set 2 C.

Set 3

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 72 of 109 Appendix H (Page 5 of 5)

Weighted Average Containment Temperatures - ICS Out of Service Date ________

3.0 LOWER COMPARTMENT WEIGHTED AVERAGE AIR TEMPERATURE (continued)

[5]

COLLECT additional Lower Compartment Temperature Survey data as delineated on Data Sheet 5, 6, 7, or 8, waiting 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> between each set of data, AND RECORD data on Data Sheet 5, 6, 7, or 8, as appropriate.

(Enter OOS for out of service ICS points.)

A.

Set 1 B.

Set 2 C.

Set 3

[6]

VERIFY the following from Data Sheet 10:

A.

At least one (1) of the Group 1 Lower Containment thermocouples NOT OOS.

B.

At least one (1) of the Group 2 Lower Containment thermocouples NOT OOS.

C.

At least one (1) of the Group 3 Lower Containment thermocouples NOT OOS.

[7]

RECORD the following from Data Sheet 10 A.

Lower Compartment Air Mass Temperature (TLOW).

TLOW =

F B.

Incore Instrument Room Temperature (2-TE-30-210AD) 2-TE-30-210AD =

F

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 73 of 109 Data Sheet 1 (Page 1 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.1 Date ________

Subsection 6.1.1: Upper Compartment Coolers 2A, 2B, 2C Upper Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210A 270 / 868' DOME T1000A 2-TE-30-210Q 55 / 809' ICE COND WALL T1016A 2-TE-30-210R 235 / 809' ICE WALL OPP SID T1017A 2-TE-30-210S 92 / 766' PRZR ENCL WALL T1018A 2-TE-30-210T 285 / 766' ICE OPP PRZR T1019A 2-TE-30-210U 180 / 766' SG ENCL WALL T1020A 2-TE-30-210V 0 / 766' SG ENCL OPP SIDE T1021A UPPER CMPT AVG MASS AIR TEMP U9019 Additional Upper Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-211O UPPER COMPT COOL UNIT A INTAKE T1118A 2-TE-30-211P UPPER COMPT COOL UNIT B INTAKE T1119A 2-TE-30-211Q UPPER COMPT COOL UNIT C INTAKE T1120A 2-TE-30-211R UPPER COMPT COOL UNIT D INTAKE T1121A 2-TE-30-211S UPPER COMPT COOL UNIT A EXHAUST T1122A 2-TE-30-211T UPPER COMPT COOL UNIT B EXHAUST T1123A 2-TE-30-211U UPPER COMPT COOL UNIT C EXHAUST T1124A 2-TE-30-211V UPPER COMPT COOL UNIT D EXHAUST T1125A 2-ME-30-240 CNTMT UP-COMPARTMENT DEW PT TEMP Y0701A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 74 of 109 Data Sheet 1 (Page 2 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.1 Date ________

Subsection 6.1.1: Upper Compartment Coolers 2A, 2B, 2C Additional Upper Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average 2-FI-67-263 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2A ERCW RET FLOW N/A 2-FI-67-332 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2A ERCW SUP FLOW N/A 2-FI-67-267 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2B ERCW RET FLOW N/A 2-FI-67-334 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2B ERCW SUP FLOW N/A 2-FI-67-265 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2C ERCW RET FLOW N/A 2-FI-67-333 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2C ERCW SUP FLOW N/A 2-TW-67-262 EL 802 AZ 37

UPPER CNTMT VENT CLR A DISCH TEMP 2-TW-67-266 EL 802 AZ 149

UPPER CNTMT VENT CLR B DISCH TEMP 2-TW-67-264 EL 802 AZ 215

UPPER CNTMT VENT CLR C DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 75 of 109 Data Sheet 2 (Page 1 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.2 Date ________

Subsection 6.1.2: Upper Compartment Coolers 2A, 2B, 2D Upper Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210A 270 / 868' DOME T1000A 2-TE-30-210Q 55 / 809' ICE COND WALL T1016A 2-TE-30-210R 235 / 809' ICE WALL OPP SID T1017A 2-TE-30-210S 92 / 766' PRZR ENCL WALL T1018A 2-TE-30-210T 285 / 766' ICE OPP PRZR T1019A 2-TE-30-210U 180 / 766' SG ENCL WALL T1020A 2-TE-30-210V 0 / 766' SG ENCL OPP SIDE T1021A UPPER CMPT AVG MASS AIR TEMP U9019 Additional Upper Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-211O UPPER COMPT COOL UNIT A INTAKE T1118A 2-TE-30-211P UPPER COMPT COOL UNIT B INTAKE T1119A 2-TE-30-211Q UPPER COMPT COOL UNIT C INTAKE T1120A 2-TE-30-211R UPPER COMPT COOL UNIT D INTAKE T1121A 2-TE-30-211S UPPER COMPT COOL UNIT A EXHAUST T1122A 2-TE-30-211T UPPER COMPT COOL UNIT B EXHAUST T1123A 2-TE-30-211U UPPER COMPT COOL UNIT C EXHAUST T1124A 2-TE-30-211V UPPER COMPT COOL UNIT D EXHAUST T1125A 2-ME-30-240 CNTMT UP-COMPARTMENT DEW PT TEMP Y0701A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 76 of 109 Data Sheet 2 (Page 2 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.2 Date ________

Subsection 6.1.2: Upper Compartment Coolers 2A, 2B, 2D Additional Upper Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average 2-FI-67-263 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2A ERCW RET FLOW N/A 2-FI-67-332 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2A ERCW SUP FLOW N/A 2-FI-67-267 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2B ERCW RET FLOW N/A 2-FI-67-334 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2B ERCW SUP FLOW N/A 2-FI-67-269 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2D ERCW RET FLOW N/A 2-FI-67-335 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2D ERCW SUP FLOW N/A 2-TW-67-262 EL 802 AZ 37

UPPER CNTMT VENT CLR A DISCH TEMP 2-TW-67-266 EL 802 AZ 149

UPPER CNTMT VENT CLR B DISCH TEMP 2-TW-67-268 EL 802 AZ 325

UPPER CNTMT VENT CLR D DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 77 of 109 Data Sheet 3 (Page 1 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.3 Date ________

Subsection 6.1.3: Upper Compartment Coolers 2A, 2C, 2D Upper Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210A 270 / 868' DOME T1000A 2-TE-30-210Q 55 / 809' ICE COND WALL T1016A 2-TE-30-210R 235 / 809' ICE WALL OPP SID T1017A 2-TE-30-210S 92 / 766' PRZR ENCL WALL T1018A 2-TE-30-210T 285 / 766' ICE OPP PRZR T1019A 2-TE-30-210U 180 / 766' SG ENCL WALL T1020A 2-TE-30-210V 0 / 766' SG ENCL OPP SIDE T1021A UPPER CMPT AVG MASS AIR TEMP U9019 Additional Upper Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-211O UPPER COMPT COOL UNIT A INTAKE T1118A 2-TE-30-211P UPPER COMPT COOL UNIT B INTAKE T1119A 2-TE-30-211Q UPPER COMPT COOL UNIT C INTAKE T1120A 2-TE-30-211R UPPER COMPT COOL UNIT D INTAKE T1121A 2-TE-30-211S UPPER COMPT COOL UNIT A EXHAUST T1122A 2-TE-30-211T UPPER COMPT COOL UNIT B EXHAUST T1123A 2-TE-30-211U UPPER COMPT COOL UNIT C EXHAUST T1124A 2-TE-30-211V UPPER COMPT COOL UNIT D EXHAUST T1125A 2-ME-30-240 CNTMT UP-COMPARTMENT DEW PT TEMP Y0701A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 78 of 109 Data Sheet 3 (Page 2 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.3 Date ________

Subsection 6.1.3: Upper Compartment Coolers 2A, 2C, 2D Additional Upper Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average 2-FI-67-263 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2A ERCW RET FLOW N/A 2-FI-67-332 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2A ERCW SUP FLOW N/A 2-FI-67-265 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2C ERCW RET FLOW N/A 2-FI-67-333 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2C ERCW SUP FLOW N/A 2-FI-67-269 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2D ERCW RET FLOW N/A 2-FI-67-335 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2D ERCW SUP FLOW N/A 2-TW-67-262 EL 802 AZ 37

UPPER CNTMT VENT CLR A DISCH TEMP 2-TW-67-264 EL 802 AZ 215

UPPER CNTMT VENT CLR C DISCH TEMP 2-TW-67-268 EL 802 AZ 325

UPPER CNTMT VENT CLR D DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 79 of 109 Data Sheet 4 (Page 1 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.4 Date ________

Subsection 6.1.4: Upper Compartment Coolers 2B, 2C, 2D Upper Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210A 270 / 868' DOME T1000A 2-TE-30-210Q 55 / 809' ICE COND WALL T1016A 2-TE-30-210R 235 / 809' ICE WALL OPP SID T1017A 2-TE-30-210S 92 / 766' PRZR ENCL WALL T1018A 2-TE-30-210T 285 / 766' ICE OPP PRZR T1019A 2-TE-30-210U 180 / 766' SG ENCL WALL T1020A 2-TE-30-210V 0 / 766' SG ENCL OPP SIDE T1021A UPPER CMPT AVG MASS AIR TEMP U9019 Additional Upper Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-211O UPPER COMPT COOL UNIT A INTAKE T1118A 2-TE-30-211P UPPER COMPT COOL UNIT B INTAKE T1119A 2-TE-30-211Q UPPER COMPT COOL UNIT C INTAKE T1120A 2-TE-30-211R UPPER COMPT COOL UNIT D INTAKE T1121A 2-TE-30-211S UPPER COMPT COOL UNIT A EXHAUST T1122A 2-TE-30-211T UPPER COMPT COOL UNIT B EXHAUST T1123A 2-TE-30-211U UPPER COMPT COOL UNIT C EXHAUST T1124A 2-TE-30-211V UPPER COMPT COOL UNIT D EXHAUST T1125A 2-ME-30-240 CNTMT UP-COMPARTMENT DEW PT TEMP Y0701A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 80 of 109 Data Sheet 4 (Page 2 of 2)

Upper Compartment Temperature Survey - Subsection 6.1.4 Date ________

Subsection 6.1.4: Upper Compartment Coolers 2B, 2C, 2D Additional Upper Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average 2-FI-67-267 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2B ERCW RET FLOW N/A 2-FI-67-334 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2B ERCW SUP FLOW N/A 2-FI-67-265 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2C ERCW RET FLOW N/A 2-FI-67-333 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2C ERCW SUP FLOW N/A 2-FI-67-269 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2D ERCW RET FLOW N/A 2-FI-67-335 2-L-329

[A12V / 713]

(713 Pent Rm)

UPPER CNTMT VENT CLR 2D ERCW SUP FLOW N/A 2-TW-67-266 EL 802 AZ 149

UPPER CNTMT VENT CLR B DISCH TEMP 2-TW-67-264 EL 802 AZ 215

UPPER CNTMT VENT CLR C DISCH TEMP 2-TW-67-268 EL 802 AZ 325

UPPER CNTMT VENT CLR D DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 81 of 109 Data Sheet 5 (Page 1 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.1 Date ________

Subsection 6.2.1: Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A Lower Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210B 104 / 796' PRZ ENCL CEILG T1001A 2-TE-30-210C 0 / 796' SG ENCL CEILG T1002A 2-TE-30-210D 180 / 796' SG ENCL CEILG T1003A 2-TE-30-210E 184 / 708' RX SHLD WALL T1004A 2-TE-30-210F 0 / 708' RX SHLD WALL T1005A 2-TE-30-210O 45 / 753' OPP REFUEL GATE T1014A 2-TE-30-210P 104 / 726' IN PZR SUPP PLTF T1015A 2-TE-30-210W 126 / 745' ICE PLTFM RCP#2 T1022A 2-TE-30-210X 309 / 745' ICE PLTFM RCP#4 T1023A 2-TE-30-210Y 201 / 745' ICE PLTFM SG#3 T1024A 2-TE-30-210Z 22 / 745' ICE PLTFM SG#1 T1025A 2-TE-30-210AA 90 / 687' SUMP T1026A 2-TE-30-210AB 0 / 723' FAN COMPT WALL T1027A 2-TE-30-210AC 180 / 723' FAN COMPT WALL T1028A 2-TE-30-210AD 90 / 716' INSTR RM WALL T1029A 2-TE-30-210AE 40 / 723' ACCUM RM WALL T1030A 2-TE-30-210AF 140 / 723' ACCUM RM WALL T1031A 2-TE-30-210AG 220 / 723' ACCUM RM WALL T1032A 2-TE-30-210AH 320 / 723' ACCUM RM WALL T1033A LOWER CMPT AVG MASS AIR TEMP U9020 Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 82 of 109 Data Sheet 5 (Page 2 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.1 Date ________

Subsection 6.2.1: Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data 2-TE-30-211A CRDM COOL UNIT A-A EXHAUST T1100A 2-TE-30-211B CRDM COOL UNIT B-B EXHAUST T1101A 2-TE-30-211C CRDM COOL UNIT C-A EXHAUST T1102A 2-TE-30-211D CRDM COOL UNIT D-B EXHAUST T1103A 2-TE-30-211E CRDM COOL UNIT C-A B-B INTAKE T1104A 2-TE-30-211F CRDM COOL UNIT A-A D-B INTAKE T1105A 2-TE-30-211G LOWR COMPT COOL UNIT A-A EXHAUST T1110A 2-TE-30-211H LOWR COMPT COOL UNIT B-B EXHAUST T1111A 2-TE-30-211I LOWR COMPT COOL UNIT C-A EXHAUST T1112A 2-TE-30-211J LOWR COMPT COOL UNIT D-B EXHAUST T1113A 2-TE-30-211K LOWER COMPT COOL UNIT A-A INTAKE T1114A 2-TE-30-211L LOWER COMPT COOL UNIT B-B INTAKE T1115A 2-TE-30-211M LOWER COMPT COOL UNIT C-A INTAKE T1116A 2-TE-30-211N LOWER COMPT COOL UNIT D-B INTAKE T1117A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 83 of 109 Data Sheet 5 (Page 3 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.1 Date ________

Subsection 6.2.1: Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210G UN RX VSL SUPP1 T1006A 2-TE-30-210H UN RX VSL SUPP2 T1007A 2-TE-30-210I UN RX VSL SUPP3 T1008A 2-TE-30-210J UN RX VSL SUPP4 T1009A 2-TE-30-210K EL719 OPP RX VSL NOZL 1 T1010A 2-TE-30-210L EL719 OPP RX VSL NOZL 2 T1011A 2-TE-30-210M EL719 OPP RX VSL NOZL 3 T1012A 2-TE-30-210N EL719 OPP RX VSL NOZL 4 T1013A 2-ME-30-241 CNTMT LOW-COMPARTMENT DEWPT TEMP Y0702A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 84 of 109 Data Sheet 5 (Page 4 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.1 Date ________

Subsection 6.2.1: Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-471 EL 726 AZ 21

(S Fan Rm)

LOW CNTMT VENT CLR A DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-474 EL 726 AZ 159

(N Fan Rm)

LOW CNTMT VENT CLR B DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-472 EL 726 AZ 201

(N Fan Rm)

LOW CNTMT VENT CLR C DISCH FLOW 2-TW-67-230 EL 721 AZ 9

(S Fan Rm)

LOW CNTMT VENT CLR A DISCH TEMP 2-TW-67-244 EL 721 AZ 171

(N Fan Rm)

LOW CNTMT VENT CLR B DISCH TEMP 2-TW-67-236 EL 721 AZ 187

(N Fan Rm)

LOW CNTMT VENT CLR C DISCH TEMP Ultrasonic Flowmeter near 2-FE-67-470 EL 720 AZ 9

CONT ROD DRIVE VENT CLR A DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-473 EL 720 AZ 187

CONT ROD DRIVE VENT CLR C DISCH FLOW 2-TW-67-232 EL 725 AZ 9

(S Fan Rm)

CONTROL ROD DR VENT CLR A DISCH TEMP 2-TW-67-238 EL 725 AZ 187

(N Fan Rm)

CONTROL ROD DR VENT CLR C DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 85 of 109 Data Sheet 5 (Page 5 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.1 Date ________

Subsection 6.2.1: Lower Compartment Coolers 2A-A, 2B-B, 2C-A CRDM Coolers 2A-A, 2C-A Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-257 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR A DISCH FLOW 2-TW-67-256 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR A DISCH TEMP 2-TI-31-300 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2A CW IN TEMP N/A 2-TI-31-312 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2A CW OUT TEMP N/A Ultrasonic Flowmeter near 2-FE-31-311 A12W / 692 (692 Pent Rm)

INCORE INST RM CHILL A CWS FLOW Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 86 of 109 Data Sheet 6 (Page 1 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.2 Date ________

Subsection 6.2.2: Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A Lower Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210B 104 / 796' PRZ ENCL CEILG T1001A 2-TE-30-210C 0 / 796' SG ENCL CEILG T1002A 2-TE-30-210D 180 / 796' SG ENCL CEILG T1003A 2-TE-30-210E 184 / 708' RX SHLD WALL T1004A 2-TE-30-210F 0 / 708' RX SHLD WALL T1005A 2-TE-30-210O 45 / 753' OPP REFUEL GATE T1014A 2-TE-30-210P 104 / 726' IN PZR SUPP PLTF T1015A 2-TE-30-210W 126 / 745' ICE PLTFM RCP#2 T1022A 2-TE-30-210X 309 / 745' ICE PLTFM RCP#4 T1023A 2-TE-30-210Y 201 / 745' ICE PLTFM SG#3 T1024A 2-TE-30-210Z 22 / 745' ICE PLTFM SG#1 T1025A 2-TE-30-210AA 90 / 687' SUMP T1026A 2-TE-30-210AB 0 / 723' FAN COMPT WALL T1027A 2-TE-30-210AC 180 / 723' FAN COMPT WALL T1028A 2-TE-30-210AD 90 / 716' INSTR RM WALL T1029A 2-TE-30-210AE 40 / 723' ACCUM RM WALL T1030A 2-TE-30-210AF 140 / 723' ACCUM RM WALL T1031A 2-TE-30-210AG 220 / 723' ACCUM RM WALL T1032A 2-TE-30-210AH 320 / 723' ACCUM RM WALL T1033A LOWER CMPT AVG MASS AIR TEMP U9020 Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 87 of 109 Data Sheet 6 (Page 2 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.2 Date ________

Subsection 6.2.2: Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data 2-TE-30-211A CRDM COOL UNIT A-A EXHAUST T1100A 2-TE-30-211B CRDM COOL UNIT B-B EXHAUST T1101A 2-TE-30-211C CRDM COOL UNIT C-A EXHAUST T1102A 2-TE-30-211D CRDM COOL UNIT D-B EXHAUST T1103A 2-TE-30-211E CRDM COOL UNIT C-A B-B INTAKE T1104A 2-TE-30-211F CRDM COOL UNIT A-A D-B INTAKE T1105A 2-TE-30-211G LOWR COMPT COOL UNIT A-A EXHAUST T1110A 2-TE-30-211H LOWR COMPT COOL UNIT B-B EXHAUST T1111A 2-TE-30-211I LOWR COMPT COOL UNIT C-A EXHAUST T1112A 2-TE-30-211J LOWR COMPT COOL UNIT D-B EXHAUST T1113A 2-TE-30-211K LOWER COMPT COOL UNIT A-A INTAKE T1114A 2-TE-30-211L LOWER COMPT COOL UNIT B-B INTAKE T1115A 2-TE-30-211M LOWER COMPT COOL UNIT C-A INTAKE T1116A 2-TE-30-211N LOWER COMPT COOL UNIT D-B INTAKE T1117A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 88 of 109 Data Sheet 6 (Page 3 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.2 Date ________

Subsection 6.2.2: Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210G UN RX VSL SUPP1 T1006A 2-TE-30-210H UN RX VSL SUPP2 T1007A 2-TE-30-210I UN RX VSL SUPP3 T1008A 2-TE-30-210J UN RX VSL SUPP4 T1009A 2-TE-30-210K EL719 OPP RX VSL NOZL 1 T1010A 2-TE-30-210L EL719 OPP RX VSL NOZL 2 T1011A 2-TE-30-210M EL719 OPP RX VSL NOZL 3 T1012A 2-TE-30-210N EL719 OPP RX VSL NOZL 4 T1013A 2-ME-30-241 CNTMT LOW-COMPARTMENT DEWPT TEMP Y0702A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 89 of 109 Data Sheet 6 (Page 4 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.2 Date ________

Subsection 6.2.2: Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-471 EL 726 AZ 21

(S Fan Rm)

LOW CNTMT VENT CLR A DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-474 EL 726 AZ 159

(N Fan Rm)

LOW CNTMT VENT CLR B DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-476 EL 726 AZ 339

(S Fan Rm)

LOW CNTMT VENT CLR D DISCH FLOW 2-TW-67-230 EL 721 AZ 9

(S Fan Rm)

LOW CNTMT VENT CLR A DISCH TEMP 2-TW-67-244 EL 721 AZ 171

(N Fan Rm)

LOW CNTMT VENT CLR B DISCH TEMP 2-TW-67-250 EL 721 AZ 351

(S Fan Rm)

LOW CNTMT VENT CLR D DISCH TEMP Ultrasonic Flowmeter near 2-FE-67-470 EL 720 AZ 9

CONT ROD DRIVE VENT CLR A DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-477 EL 720 AZ 171

CONT ROD DRIVE VENT CLR B DISCH FLOW 2-TW-67-232 EL 725 AZ 9

(S Fan Rm)

CONTROL ROD DR VENT CLR A DISCH TEMP 2-TW-67-246 EL 725 AZ 171

(N Fan Rm)

CONTROL ROD DR VENT CLR B DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 90 of 109 Data Sheet 6 (Page 5 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.2 Date ________

Subsection 6.2.2: Lower Compartment Coolers 2A-A, 2B-B, 2D-B CRDM Coolers 2A-A, 2B-B Incore Instrument Room Air Conditioning Train 2A Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-257 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR A DISCH FLOW 2-TW-67-256 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR A DISCH TEMP 2-TI-31-300 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2A CW IN TEMP N/A 2-TI-31-312 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2A CW OUT TEMP N/A Ultrasonic Flowmeter near 2-FE-31-311 A12W / 692 (692 Pent Rm)

INCORE INST RM CHILL A CWS FLOW Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 91 of 109 Data Sheet 7 (Page 1 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.3 Date ________

Subsection 6.2.3: Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B Lower Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210B 104 / 796' PRZ ENCL CEILG T1001A 2-TE-30-210C 0 / 796' SG ENCL CEILG T1002A 2-TE-30-210D 180 / 796' SG ENCL CEILG T1003A 2-TE-30-210E 184 / 708' RX SHLD WALL T1004A 2-TE-30-210F 0 / 708' RX SHLD WALL T1005A 2-TE-30-210O 45 / 753' OPP REFUEL GATE T1014A 2-TE-30-210P 104 / 726' IN PZR SUPP PLTF T1015A 2-TE-30-210W 126 / 745' ICE PLTFM RCP#2 T1022A 2-TE-30-210X 309 / 745' ICE PLTFM RCP#4 T1023A 2-TE-30-210Y 201 / 745' ICE PLTFM SG#3 T1024A 2-TE-30-210Z 22 / 745' ICE PLTFM SG#1 T1025A 2-TE-30-210AA 90 / 687' SUMP T1026A 2-TE-30-210AB 0 / 723' FAN COMPT WALL T1027A 2-TE-30-210AC 180 / 723' FAN COMPT WALL T1028A 2-TE-30-210AD 90 / 716' INSTR RM WALL T1029A 2-TE-30-210AE 40 / 723' ACCUM RM WALL T1030A 2-TE-30-210AF 140 / 723' ACCUM RM WALL T1031A 2-TE-30-210AG 220 / 723' ACCUM RM WALL T1032A 2-TE-30-210AH 320 / 723' ACCUM RM WALL T1033A LOWER CMPT AVG MASS AIR TEMP U9020 Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 92 of 109 Data Sheet 7 (Page 2 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.3 Date ________

Subsection 6.2.3: Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data 2-TE-30-211A CRDM COOL UNIT A-A EXHAUST T1100A 2-TE-30-211B CRDM COOL UNIT B-B EXHAUST T1101A 2-TE-30-211C CRDM COOL UNIT C-A EXHAUST T1102A 2-TE-30-211D CRDM COOL UNIT D-B EXHAUST T1103A 2-TE-30-211E CRDM COOL UNIT C-A B-B INTAKE T1104A 2-TE-30-211F CRDM COOL UNIT A-A D-B INTAKE T1105A 2-TE-30-211G LOWR COMPT COOL UNIT A-A EXHAUST T1110A 2-TE-30-211H LOWR COMPT COOL UNIT B-B EXHAUST T1111A 2-TE-30-211I LOWR COMPT COOL UNIT C-A EXHAUST T1112A 2-TE-30-211J LOWR COMPT COOL UNIT D-B EXHAUST T1113A 2-TE-30-211K LOWER COMPT COOL UNIT A-A INTAKE T1114A 2-TE-30-211L LOWER COMPT COOL UNIT B-B INTAKE T1115A 2-TE-30-211M LOWER COMPT COOL UNIT C-A INTAKE T1116A 2-TE-30-211N LOWER COMPT COOL UNIT D-B INTAKE T1117A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 93 of 109 Data Sheet 7 (Page 3 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.3 Date ________

Subsection 6.2.3: Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210G UN RX VSL SUPP1 T1006A 2-TE-30-210H UN RX VSL SUPP2 T1007A 2-TE-30-210I UN RX VSL SUPP3 T1008A 2-TE-30-210J UN RX VSL SUPP4 T1009A 2-TE-30-210K EL719 OPP RX VSL NOZL 1 T1010A 2-TE-30-210L EL719 OPP RX VSL NOZL 2 T1011A 2-TE-30-210M EL719 OPP RX VSL NOZL 3 T1012A 2-TE-30-210N EL719 OPP RX VSL NOZL 4 T1013A 2-ME-30-241 CNTMT LOW-COMPARTMENT DEWPT TEMP Y0702A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 94 of 109 Data Sheet 7 (Page 4 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.3 Date ________

Subsection 6.2.3: Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-471 EL 726 AZ 21

(S Fan Rm)

LOW CNTMT VENT CLR A DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-472 EL 726 AZ 201

(N Fan Rm)

LOW CNTMT VENT CLR C DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-476 EL 726 AZ 339

(S Fan Rm)

LOW CNTMT VENT CLR D DISCH FLOW 2-TW-67-230 EL 721 AZ 9

(S Fan Rm)

LOW CNTMT VENT CLR A DISCH TEMP 2-TW-67-236 EL 721 AZ 187

(N Fan Rm)

LOW CNTMT VENT CLR C DISCH TEMP 2-TW-67-250 EL 721 AZ 351

(S Fan Rm)

LOW CNTMT VENT CLR D DISCH TEMP Ultrasonic Flowmeter near 2-FE-67-473 EL 720 AZ 187

CONT ROD DRIVE VENT CLR C DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-475 EL 720 AZ 351

CONT ROD DRIVE VENT CLR D DISCH FLOW 2-TW-67-238 EL 725 AZ 187

(N Fan Rm)

CONTROL ROD DR VENT CLR C DISCH TEMP 2-TW-67-252 EL 725 AZ 351

(S Fan Rm)

CONTROL ROD DR VENT CLR D DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 95 of 109 Data Sheet 7 (Page 5 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.3 Date ________

Subsection 6.2.3: Lower Compartment Coolers 2A-A, 2C-A, 2D-B CRDM Coolers 2C-A, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-259 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR B DISCH FLOW 2-TW-67-258 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR B DISCH TEMP 2-TI-31-320 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2B CW IN TEMP N/A 2-TI-31-333 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2B CW OUT TEMP N/A Ultrasonic Flowmeter near 2-FE-31-332 A12W / 692 (692 Pent Rm)

INCORE INST RM CHILL B CWS FLOW Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 96 of 109 Data Sheet 8 (Page 1 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.4 Date ________

Subsection 6.2.4: Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B Lower Compartment Mass Air Temperatures UNID Location (AZ/EL)

Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210B 104 / 796' PRZ ENCL CEILG T1001A 2-TE-30-210C 0 / 796' SG ENCL CEILG T1002A 2-TE-30-210D 180 / 796' SG ENCL CEILG T1003A 2-TE-30-210E 184 / 708' RX SHLD WALL T1004A 2-TE-30-210F 0 / 708' RX SHLD WALL T1005A 2-TE-30-210O 45 / 753' OPP REFUEL GATE T1014A 2-TE-30-210P 104 / 726' IN PZR SUPP PLTF T1015A 2-TE-30-210W 126 / 745' ICE PLTFM RCP#2 T1022A 2-TE-30-210X 309 / 745' ICE PLTFM RCP#4 T1023A 2-TE-30-210Y 201 / 745' ICE PLTFM SG#3 T1024A 2-TE-30-210Z 22 / 745' ICE PLTFM SG#1 T1025A 2-TE-30-210AA 90 / 687' SUMP T1026A 2-TE-30-210AB 0 / 723' FAN COMPT WALL T1027A 2-TE-30-210AC 180 / 723' FAN COMPT WALL T1028A 2-TE-30-210AD 90 / 716' INSTR RM WALL T1029A 2-TE-30-210AE 40 / 723' ACCUM RM WALL T1030A 2-TE-30-210AF 140 / 723' ACCUM RM WALL T1031A 2-TE-30-210AG 220 / 723' ACCUM RM WALL T1032A 2-TE-30-210AH 320 / 723' ACCUM RM WALL T1033A LOWER CMPT AVG MASS AIR TEMP U9020 Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 97 of 109 Data Sheet 8 (Page 2 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.4 Date ________

Subsection 6.2.4: Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data 2-TE-30-211A CRDM COOL UNIT A-A EXHAUST T1100A 2-TE-30-211B CRDM COOL UNIT B-B EXHAUST T1101A 2-TE-30-211C CRDM COOL UNIT C-A EXHAUST T1102A 2-TE-30-211D CRDM COOL UNIT D-B EXHAUST T1103A 2-TE-30-211E CRDM COOL UNIT C-A B-B INTAKE T1104A 2-TE-30-211F CRDM COOL UNIT A-A D-B INTAKE T1105A 2-TE-30-211G LOWR COMPT COOL UNIT A-A EXHAUST T1110A 2-TE-30-211H LOWR COMPT COOL UNIT B-B EXHAUST T1111A 2-TE-30-211I LOWR COMPT COOL UNIT C-A EXHAUST T1112A 2-TE-30-211J LOWR COMPT COOL UNIT D-B EXHAUST T1113A 2-TE-30-211K LOWER COMPT COOL UNIT A-A INTAKE T1114A 2-TE-30-211L LOWER COMPT COOL UNIT B-B INTAKE T1115A 2-TE-30-211M LOWER COMPT COOL UNIT C-A INTAKE T1116A 2-TE-30-211N LOWER COMPT COOL UNIT D-B INTAKE T1117A 2-TE-67-455 ERCW SUP HDR 2A TEMP T2614A 2-TE-67-456 ERCW SUP HDR 2B TEMP T2615A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 98 of 109 Data Sheet 8 (Page 3 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.4 Date ________

Subsection 6.2.4: Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data UNID Description ICS Point Set 1 Set 2 Set 3 Average 2-TE-30-210G UN RX VSL SUPP1 T1006A 2-TE-30-210H UN RX VSL SUPP2 T1007A 2-TE-30-210I UN RX VSL SUPP3 T1008A 2-TE-30-210J UN RX VSL SUPP4 T1009A 2-TE-30-210K EL719 OPP RX VSL NOZL 1 T1010A 2-TE-30-210L EL719 OPP RX VSL NOZL 2 T1011A 2-TE-30-210M EL719 OPP RX VSL NOZL 3 T1012A 2-TE-30-210N EL719 OPP RX VSL NOZL 4 T1013A 2-ME-30-241 CNTMT LOW-COMPARTMENT DEWPT TEMP Y0702A Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 99 of 109 Data Sheet 8 (Page 4 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.4 Date ________

Subsection 6.2.4: Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-474 EL 726 AZ 159

(N Fan Rm)

LOW CNTMT VENT CLR B DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-472 EL 726 AZ 201

(N Fan Rm)

LOW CNTMT VENT CLR C DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-476 EL 726 AZ 339

(S Fan Rm)

LOW CNTMT VENT CLR D DISCH FLOW 2-TW-67-244 EL 721 AZ 171

(N Fan Rm)

LOW CNTMT VENT CLR B DISCH TEMP 2-TW-67-236 EL 721 AZ 187

(N Fan Rm)

LOW CNTMT VENT CLR C DISCH TEMP 2-TW-67-250 EL 721 AZ 251

(S Fan Rm)

LOW CNTMT VENT CLR D DISCH TEMP Ultrasonic Flowmeter near 2-FE-67-477 EL 720 AZ 171

CONT ROD DRIVE VENT CLR B DISCH FLOW Ultrasonic Flowmeter near 2-FE-67-475 EL 720 AZ 351

CONT ROD DRIVE VENT CLR D DISCH FLOW 2-TW-67-246 EL 725 AZ 171

(N Fan Rm)

CONTROL ROD DR VENT CLR B DISCH TEMP 2-TW-67-252 EL 725 AZ 351

(S Fan Rm)

CONTROL ROD DR VENT CLR D DISCH TEMP Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 100 of 109 Data Sheet 8 (Page 5 of 5)

Lower Compartment Temperature Survey - Subsection 6.2.4 Date ________

Subsection 6.2.4: Lower Compartment Coolers 2B-B, 2C-A, 2D-B CRDM Coolers 2B-B, 2D-B Incore Instrument Room Air Conditioning Train 2B Additional Lower Compartment Temperature Data UNID Location Description M&TE ID Set 1 Set 2 Set 3 Average Ultrasonic Flowmeter near 2-FE-67-259 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR B DISCH FLOW 2-TW-67-258 A12W / 692 (692 Pent Rm)

INSTR RM VENT CLR B DISCH TEMP 2-TI-31-320 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2B CW IN TEMP N/A 2-TI-31-333 A12W / 692 (692 Pent Rm)

INCORE INSTR ROOM CHILLER 2B CW OUT TEMP N/A Ultrasonic Flowmeter near 2-FE-31-332 A12W / 692 (692 Pent Rm)

INCORE INST RM CHILL B CWS FLOW Start / Stop Time & Date Data Recorded:

/

/

/

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 101 of 109 Data Sheet 9 (Page 1 of 2)

Upper Compartment Air Temperature Thermocouple Measurements Date ________

Subsection:

M&TE ID:

Cal Due Date:

UNID Description ICS Point Thermocouple Terminations1 Temperatures Rack Terminal Block Cable Terminals (Shield / + / -)

Set 1 Set 2 Set 3 Average Temp (T) 2-TE-30-210A DOME T1000A 2-R-104 E/00 2CR397 S1 / +1 / -1 2-TE-30-210Q ICE COND WALL T1016A 2-R-111 03 2R802 S0 / +0 / -0 2-TE-30-210R ICE WALL OPP SID T1017A 2-R-111 03 2R803 S1 / +1 / -1 2-TE-30-210S PRZR ENCL WALL T1018A 2-R-111 03 2R804 S2 / +2 / -2 2-TE-30-210T ICE OPP PRZR T1019A 2-R-111 03 2R805 S3 / +3 / -3 2-TE-30-210U SG ENCL WALL T1020A 2-R-111 03 2R806 S4 / +4 / -4 2-TE-30-210V SG ENCL OPP SIDE T1021A 2-R-111 03 2R807 S5 / +5 / -5 Time & Date Data Recorded:

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A 1

Reference Drawings 2-45W2697-14-4 for Rack 2-R-104 and 2-45W2697-14-8 for Rack 2-R-111.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 102 of 109 Data Sheet 9 (Page 2 of 2)

Upper Compartment Air Temperature Thermocouple Measurements Date ________

Subsection:

Group UNID Description ICS Point Average Temp (T)

Volume Fraction (VF)

Temperature Fraction (TF = T  VF) 1 2-TE-30-210A DOME T1000A 0.25 1

2-TE-30-210Q ICE COND WALL T1016A 0.11 1

2-TE-30-210R ICE WALL OPP SID T1017A 0.11 2

2-TE-30-210S PRZR ENCL WALL T1018A 0.11 2

2-TE-30-210T ICE OPP PRZR T1019A 0.20 2

2-TE-30-210U SG ENCL WALL T1020A 0.11 2

2-TE-30-210V SG ENCL OPP SIDE T1021A 0.11 SUM of OOS Volume Fractions (VFOOS):

Sum of Temp Fractions (TF):

F 1

VF 1

TF

)

(T e

Temperatur Air Average t Weighted Compartmen Upper OOS UP













Calculations Performed By:

Calculations Verified By

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 103 of 109 Data Sheet 10 (Page 1 of 4)

Lower Compartment Air Temperature Thermocouple Measurements Date ________

Subsection:

M&TE ID:

Cal Due Date:

UNID Description ICS Point Thermocouple Terminations2 Temperatures Rack Terminal Block Cable Terminals (Shield / + / -)

Set 1 Set 2 Set 3 Average Temp (T) 2-TE-30-210B PRZ ENCL CEILG T1001A 2-R-104 E/00 2CR399 S2 / +2 / -2 2-TE-30-210C SG ENCL CEILG T1002A 2-R-104 E/00 2CR401 S3 / +3 / -3 2-TE-30-210D SG ENCL CEILG T1003A 2-R-104 E/00 2CR403 S4 / +4 / -4 2-TE-30-210E RX SHLD WALL T1004A 2-R-104 E/00 2CR405 S5 / +5 / -5 2-TE-30-210F RX SHLD WALL T1005A 2-R-104 J/10 2CR407 S0 / +0 / -0 2-TE-30-210O OPP REFUEL GATE T1014A 2-R-104 J/08 2CR425 S2 / +2 / -2 2-TE-30-210P IN PZR SUPP PLTF T1015A 2-R-104 J/08 2CR427 S3 / +3 / -3 2-TE-30-210W ICE PLTFM RCP#2 T1022A 2-R-111 03 2R808 S6 / +6 / -6 2-TE-30-210X ICE PLTFM RCP#4 T1023A 2-R-111 03 2R809 S7 / +7 / -7 2-TE-30-210Y ICE PLTFM SG#3 T1024A 2-R-111 04 2R810 S1 / +1 / -1 2-TE-30-210Z ICE PLTFM SG#1 T1025A 2-R-111 04 2R811 S2 / +2 / -2 2-TE-30-210AA SUMP T1026A 2-R-111 04 2R812 S3 / +3 / -3 2-TE-30-210AB FAN COMPT WALL T1027A 2-R-111 04 2R813 S4 / +4 / -4 2-TE-30-210AC FAN COMPT WALL T1028A 2-R-111 04 2R814 S5 / +5 / -5

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 104 of 109 Data Sheet 10 (Page 2 of 4)

Lower Compartment Air Temperature Thermocouple Measurements Date ________

Subsection:

UNID Description ICS Point Thermocouple Terminations2 Temperatures Rack Terminal Block Cable Terminals (Shield / + / -)

Set 1 Set 2 Set 3 Average Temp (T) 2-TE-30-210AD INSTR RM WALL T1029A 2-R-111 04 2R815 S6 / +6 / -6 2-TE-30-210AE ACCUM RM WALL T1030A 2-R-111 04 2R816 S7 / +7 / -7 2-TE-30-210AF ACCUM RM WALL T1031A 2-R-111 05 2R817 S0 / +0 / -0 2-TE-30-210AG ACCUM RM WALL T1032A 2-R-111 05 2R818 S1 / +1 / -1 2-TE-30-210AH ACCUM RM WALL T1033A 2-R-111 05 2R819 S2 / +2 / -2 2-TE-30-210G UN RX VSL SUPP1 T1006A 2-R-104 J/10 2CR409 S1 / +1 / -1 2-TE-30-210H UN RX VSL SUPP2 T1007A 2-R-104 J/10 2CR411 S2 / +2 / -2 2-TE-30-210I UN RX VSL SUPP3 T1008A 2-R-104 J/10 2CR413 S3 / +3 / -3 2-TE-30-210J UN RX VSL SUPP4 T1009A 2-R-104 J/10 2CR415 S4 / +4 / -4 Time & Date Data Recorded:

N/A Data Recorded/Calculated By:

Calculations Verified By:

N/A N/A N/A 2

Reference Drawings 2-45W2697-14-4 for Rack 2-R-104 and 2-45W2697-14-8 & 2-45W2697-54-1for Rack 2-R-111.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 105 of 109 Data Sheet 10 (Page 3 of 4)

Lower Compartment Air Temperature Thermocouple Measurements Date ________

Subsection:

Group UNID Description ICS Point Average Temp (T)

Volume Fraction (VF)

Temperature Fraction (TF = T  VF)

N/A 2-TE-30-210B PRZ ENCL CEILG T1001A 0.007 N/A 2-TE-30-210C SG ENCL CEILG T1002A 0.072 N/A 2-TE-30-210D SG ENCL CEILG T1003A 0.072 1

2-TE-30-210E RX SHLD WALL T1004A 0.122 1

2-TE-30-210F RX SHLD WALL T1005A 0.122 N/A 2-TE-30-210O OPP REFUEL GATE T1014A 0.034 1

2-TE-30-210P IN PZR SUPP PLTF T1015A 0.007 2

2-TE-30-210W ICE PLTFM RCP#2 T1022A 0.061 2

2-TE-30-210X ICE PLTFM RCP#4 T1023A 0.061 2

2-TE-30-210Y ICE PLTFM SG#3 T1024A 0.061 2

2-TE-30-210Z ICE PLTFM SG#1 T1025A 0.061 N/A 2-TE-30-210AA SUMP T1026A 0.034

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 106 of 109 Data Sheet 10 (Page 4 of 4)

Lower Compartment Air Temperature Thermocouple Measurements Date ________

Subsection:

Group UNID Description ICS Point Average Temp (T)

Volume Fraction (VF)

Temperature Fraction (TF = T  VF) 3 2-TE-30-210AB FAN COMPT WALL T1027A 0.037 3

2-TE-30-210AC FAN COMPT WALL T1028A 0.038 N/A 2-TE-30-210AD INSTR RM WALL T1029A 0.043 3

2-TE-30-210AE ACCUM RM WALL T1030A 0.053 3

2-TE-30-210AF ACCUM RM WALL T1031A 0.047 3

2-TE-30-210AG ACCUM RM WALL T1032A 0.034 3

2-TE-30-210AH ACCUM RM WALL T1033A 0.034 Sum of OOS Volume Fractions (VFOOS):

Sum of Temp Fractions (TF):

F 1

VF 1

TF

)

(T e

Temperatur Air Average t Weighted Compartmen Lower OOS LOW













Calculations Performed By:

Calculations Verified By

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 107 of 109 Table 1 (Page 1 of 3)

Containment Air Cooling Equipment Locations Date ________

Upper Compartment Coolers UNID Main Control Room Breaker Location UCC 2A 2-CCU-30-95 2-HS-30-95A

[2-M-9]

2-BKR-30-95

[RX VENT BD 2A-A]

802' / 37

UCC 2B 2-CCU-30-97 2-HS-30-97A

[2-M-9]

2-BKR-30-97

[RX VENT BD 2B-B]

802' / 149

UCC 2C 2-CCU-30-99 2-HS-30-99A

[2-M-9]

2-BKR-30-99

[RX VENT BD 2A-A]

802' / 215

UCC 2D 2-CCU-30-100 2-HS-30-100A

[2-M-9]

2-BKR-30-100

[RX VENT BD 2B-B]

802' / 325

Lower Compartment Coolers UNID Main Control Room Breaker Location LCC 2A-A 2-CCU-30-74 2-HS-30-74A

[2-M-9]

2-BKR-30-74

[480V SD BD 2A1-A]

716' / 21

(S Fan Rm)

LCC 2B-B 2-CCU-30-75 2-HS-30-75A

[2-M-9]

2-BKR-30-75

[480V SD BD 2B1-B]

716' / 159

(N Fan Rm)

LCC 2C-A 2-CCU-30-77 2-HS-30-77A

[2-M-9]

2-BKR-30-77

[480V SD BD 2A2-A]

716' / 201

(N Fan Rm)

LCC 2D-B 2-CCU-30-78 2-HS-30-78A

[2-M-9]

2-BKR-30-78

[480V SD BD 2B2-B]

716' / 339

(S Fan Rm)

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 108 of 109 Table 1 (Page 2 of 3)

Containment Air Cooling Equipment Locations Date ________

CRDM Coolers & Associated Dampers UNID Main Control Room Aux Control Room Breaker Location CRDM Cooler 2A-A 2-CLR-30-83 2-HS-30-83A

[2-M-9]

N/A 2-BKR-30-83

[480V SD BD 2A1-A]

703' / 25

2-TCO-30-841 2-HS-30-84A

[2-M-9]

2-HS-30-84C

[2-L-10]

N/A 703' / 15

2-TCO-30-85 2-HS-30-85A

[2-M-9]

2-HS-30-85C

[2-L-10]

N/A 703' / 15

CRDM Cooler 2B-B 2-CLR-30-92 2-HS-30-92A

[2-M-9]

N/A 2-BKR-30-92

[480V SD BD 2B1-B]

703' / 165

2-TCO-30-931 2-HS-30-93A

[2-M-9]

2-HS-30-93C

[2-L-10]

N/A 703' / 165

2-TCO-30-94 2-HS-30-94A

[2-M-9]

2-HS-30-94C

[2-L-10]

N/A 703' / 165

CRDM Cooler 2C-A 2-CLR-30-88 2-HS-30-88A

[2-M-9]

N/A 2-BKR-30-88

[480V SD BD 2A2-A]

703' / 205

2-TCO-30-891 2-HS-30-89A

[2-M-9]

2-HS-30-89C

[2-L-10]

N/A 703' / 195

2-TCO-30-90 2-HS-30-90A

[2-M-9]

2-HS-30-90C

[2-L-10]

N/A 703' / 195

CRDM Cooler 2D-B 2-CLR-30-80 2-HS-30-80A

[2-M-9]

N/A 2-BKR-30-80

[480V SD BD 2B2-B]

703' / 335

2-TCO-30-811 2-HS-30-81A

[2-M-9]

2-HS-30-81C

[2-L-10]

N/A 703' / 345

2-TCO-30-82 2-HS-30-82A

[2-M-9]

2-HS-30-82C

[2-L-10]

N/A 703' / 345

1 CRDM Shroud Suction Dampers are designed to automatically open if their respective Handswitch is in P AUTO and their associated CRDM Cooler starts.

WBN Unit 2 Containment Building Temperature Survey 2-PTI-030L-01 Rev. 0000 Page 109 of 109 Table 1 (Page 3 of 3)

Containment Air Cooling Equipment Locations Date ________

Incore Instrument Room Air Conditioning UNID Main Control Room Breaker Location Train A 2-AHU-31-265 2-HS-31-265A

[2-M-9]

2-BKR-31-265

[RX MOV BD 2A1-A]

730' / 57

(IIR) 2-FCO-31-2632 2-XI-31-263

[2-M-9]

N/A 730' / 57

(IIR) 2-FCO-31-2642 2-XI-31-264

[2-M-9]

N/A 730' / 57

(IIR) 2-CHR-31-3032 N/A 2-BKR-31-303B

[RX MOV BD 2A1-A]

A12W / 692 (692 Pent Rm) 2-PMP-31-303/12 N/A 2-BKR-31-303A

[RX MOV BD 2A1-A]

A12W / 692 (692 Pent Rm)

Train B 2-AHU-31-266 2-HS-31-266A

[2-M-9]

2-BKR-31-266

[RX MOV BD 2B1-B]

730' / 112

(IIR) 2-FCO-31-2682 2-XI-31-268

[2-M-9]

N/A 730' / 112

(IIR) 2-FCO-31-2692 2-XI-31-269

[2-M-9]

N/A 730' / 112

(IIR) 2-CHR-31-3242 N/A 2-BKR-31-324B

[RX MOV BD 2B1-B]

A12W / 692 (692 Pent Rm) 2-PMP-31-324/12 N/A 2-BKR-31-324A

[RX MOV BD 2B1-B]

A12W / 692 (692 Pent Rm) 2 Incore Instrument Room Air Conditioning Chiller, Pump, and Dampers are designed to automatically start/open when their associated AHU starts.