MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] |
Text
Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Saturday, February 11, 2012 5:42 PM To: 'dorts@firstenergycorp.com'; 'custerc@firstenergycorp.com'; Davis-BesseHearingFile Resource
Subject:
Teleconference call for FENOC's review and comments. (EOM)
Attachments: 1 24 2012 DB NRC Telecon Summary.docx Importance: High
- Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch 1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov 1
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3515 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0807211ECC8)
Subject:
Teleconference call for FENOC's review and comments. (EOM)
Sent Date: 2/11/2012 5:42:08 PM Received Date: 2/11/2012 5:42:10 PM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:
"'dorts@firstenergycorp.com'" <dorts@firstenergycorp.com>
Tracking Status: None
"'custerc@firstenergycorp.com'" <custerc@firstenergycorp.com>
Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 264 2/11/2012 5:42:10 PM 1 24 2012 DB NRC Telecon Summary.docx 29909 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 24, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE, LICENSE RENEWAL APPLICATION (TAC. NO.
ME4640)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on January 24, 2012, to discuss and clarify the staffs requests for additional information (RAIs) concerning the Davis-Besse license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description on the status of the items is also included.
The applicant had an opportunity to comment on this summary.
Samuel Cuadrado de Jesús, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-346
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information cc w/encls: See next page
DOCUMENT NAME: Insert document name and full path.
OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME S Cuadrado de D Morey Jesús DATE / / / / / /
SUMMARY
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS January 24, 2012 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesús U.S. Nuclear Regulatory Commission (NRC)
Allen Hiser NRC Bo Pham NRC Christopher Sydnor NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)
Steven Dort FENOC Allen McAllister FENOC Larry Hinkle FENOC Jake Hofelich, FENOC Zackary Warchol FENOC ENCLOSURE 1
SUMMARY
OF TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION January 24, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on January 24, 2012, to discuss and clarify the following concern related to the Davis-Besse license renewal application (LRA).
MRP-227-A Implementation Discussion:
The purpose of the call was to discuss the pressurized water reactor (PWR) Reactor Vessel Internals Program and how the applicant plans to implement MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A).
The staff wanted to know the applicants plans to address any differences between MRP-227 and MRP-227-A. The applicant stated that a review of MRP-227-A dated December 2011, against the previous version of MRP-227 dated December 2008, was in progress to identify any changes needed to the Davis-Besse PWR Reactor Vessel Internals (RVI) Program or to the aging management review (AMR) results provided in License Renewal Application (LRA) Table 3.1.2-2, Aging Management Review Results - Reactor Vessel Internals. The applicant noted that, at a minimum, several changes are required to LRA Table 3.1.2-2.
The staff indicated that the reconciliation of the differences would become an open item and that the changes should be sent as soon as possible. The staff indicated the response should be tied to a previous RVI request for additional information (RAI). The staff is to provide the RAI number.
The applicant stated that it will provide the response as soon as possible, but no later than the Davis-Besse Advisory Committee on Reactor Safeguards (ACRS) subcommittee meeting scheduled for April 10, 2012. The staff requested the applicant to be very clear as to what has and what has not changed, and to identify what was reviewed.
There was no further discussion, and the call was concluded.
SUBJECT:
Summary of Telephone Conference Call conducted on January 24, 2012 ENCLOSURE 2