MONTHYEARML24348A1072024-12-13013 December 2024 NRR E-mail Capture - (External_Sender) St. Lucie Power Plant Monthly Turtle Report for November 2024 ML24311A0392024-11-0505 November 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2024 ML24310A1292024-11-0404 November 2024 Acceptance of Requested Licensing Action Amendment Request ML24290A0442024-10-15015 October 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for September 2024 ML24281A1592024-10-0707 October 2024 Acceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel Cycles ML24254A2562024-09-0606 September 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for August 2024 ML24248A2422024-09-0404 September 2024 Acceptance Review for St. Lucie, Unit 2 - Relief Request (RR) 14: Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24246A0152024-08-12012 August 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for July 2024 ML24194A1222024-07-11011 July 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for June 2024 ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24176A1612024-06-15015 June 2024 NRR E-mail Capture - (External_Sender) May 2024 FPL Marine Turtle Removal Monthly Report ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24134A0142024-05-10010 May 2024 NRR E-mail Capture - (External_Sender) Pasl Monthly Turtle Report for April 2024 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A2202024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for March 2024 ML24074A4262024-03-12012 March 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for February 2024 ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24036A2152024-02-0505 February 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for January 2024 ML24031A5472024-01-13013 January 2024 NRR E-mail Capture - (External_Sender) December 2023 FPL Marine Turtle Removal Monthly Report ML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 – Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARIR 05000335/20254032024-12-10010 December 2024 Information Request for the Cyber Security Baseline Security Inspection Notification to Perform Inspection 05000335/2025403; 05000389/2025403 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24177A2532024-02-12012 February 2024 Request for Additional Information Relief Request RR 7, Alternative Examination of Reactor Vessel Welds for Florida Power & Light Company, St. Lucie Nuclear Plant, Unit 1 ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22325A0692022-11-18018 November 2022 RAI Set 4 ML22270A1482022-09-26026 September 2022 SLRA Second Round RAI Letter 2 - Class 1 Fatigue (Final) ML22217A0032022-08-0404 August 2022 SLRA Second Round RAI Letter 1) ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22193A0872022-07-11011 July 2022 Letter RAI Set 3 (Final) ML22133A0032022-05-12012 May 2022 SLRA RAIs Set 1 ML22101A2322022-05-0202 May 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Enclosure RCIs and RAIs ML22094A1672022-04-0101 April 2022 2022 St. Lucie POV Inspection Information Request ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report ML21350A4262021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Licensing Amendment Request Concerning Technical Specification Conversion to NUREG-1432, Revision 5 ML21119A3142021-04-28028 April 2021 Requests for Additional Information Regarding License Amendment Requests to Apply Risk Informed Completion Times (RICT) for the 120-Volt AC (EPID L-2020-LLA-0283) (Email) ML21063A3192021-03-0404 March 2021 Request for Additional Information Regarding Relief Request RR 15 - Extension of RPV Welds from 10 to 20 Years ML20092G3442020-04-0101 April 2020 RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program ML20094G2022020-03-30030 March 2020 Request for Additional Information Regarding License Amendment Request to Adopt EAL Schemes Pursuant to NEI 99-01 (L-2019-LLA-0210) ML19350B2982019-12-13013 December 2019 NMFS to NRC, Request for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation ML19225D3152019-08-13013 August 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19193A1982019-07-12012 July 2019 Emailed St. Lucie Heat Sink RFI ML19192A1372019-07-11011 July 2019 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19192A1352019-06-25025 June 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19151A8312019-05-31031 May 2019 NRR E-mail Capture - St. Lucie Plant, Unit Nos. 1 and 2, Request for Additional Information Regarding Emergency Diesel Generator Surveillance Requirement Amendment Request ML19151A5092019-05-21021 May 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit Nos. 1 and 2 Emergency Diesel Generator Surveillance Requirement Amendment Request ML19109A1392019-04-18018 April 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding the License Amendment Request Pertaining to the Iodine Removal System ML19053A2242019-02-0101 February 2019 NRR E-mail Capture - St. Lucie Plant Unit No. 1 - Draft Request for Additional Information Related to Relief Request 6 Regarding the Refueling Water Tank Bottom Liner L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)2018-10-22022 October 2018 St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18296A2052018-10-22022 October 2018 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18197A4112018-08-0101 August 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Reduce the Number of Control Element Assemblies ML18019A0712018-01-18018 January 2018 NRR E-mail Capture - Request for Additional Information - St. Lucie Inop AFW Steam Supply LAR (L-2017-LLA-0296) ML17304B1532017-12-18018 December 2017 Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pool ML17331B1532017-11-27027 November 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie IST Relief Request #5 - PR-01 (L-2017-LLR-0113) ML17277A3692017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie RICT LAR - MF5372/MF5373 ML17152A1842017-06-0101 June 2017 Request for Additional Information - RPS Rate of Change and LCO Change LAR (CACs MF9119 9120) ML16356A1432016-12-20020 December 2016 Notification of Inspection and Request for Information ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16308A3232016-11-0303 November 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie EDG Day Tank LAR - MF8006 ML16292A8212016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML17003A0452016-10-11011 October 2016 NRR E-mail Capture - (External_Sender) FW: St. Lucie Response to RAI on SL2-22 SG Tube Inspection Report (MF7604) ML16244A2602016-08-26026 August 2016 Notification of Inspection and Request for Information ML16155A3502016-06-0303 June 2016 Notification of Inspection and Request for Information 2024-07-12
[Table view] |
Text
From:
Orf, Tracy Sent:
Friday, May 20, 2011 12:26 PM To:
'Wasik, Chris' Cc:
Abbott, Liz; Frehafer, Ken
Subject:
St. Lucie Unit 1 EPU - request for additional information (Electrical Engineering)
Dear Mr. Wasik,
By letter dated November 22, 2010 (Agencywide Documents Access and Management System Accession No. ML103560415) Florida Power & Light Company (the licensee) submitted a license amendment request for St. Lucie Unit 1.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and has concluded that additional information is required from the licensee in order for the NRC staff to complete their review. The questions below describe these requests for additional information (RAls).
The NRC requests that the licensee respond to these RAls within 30 days of the date of this e-mail. If the licensee concludes that more than 30 days are required to respond to the RAls, the licensee should request additional time, including a basis for why the extension is needed.
Please contact me at the number below or by e-mail if you have any questions on this issue or if you require additional time to submit your responses.
Sincerely, Tracy J. Orf, Project Manager St. Lucie Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-2788 REQUEST FOR ADDITIONAL INFORMATION (RAI)
REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE ST. LUCIE PLANT, UNIT NO.1 DOCKET NO. 50-335 EEEB-1:
Explain how the licensee is addressing environmental qualification (EQ) margins for the electrical equipment in accordance with the following regulations and regulatory guidance documents: (a) 10 CFR 50.49e(8), (b) Regulatory Guide (RG) 1.89, Revision 1, Section C.4, and (c) IEEE 323-1974, Section 6.3.1.5.
EEEB-2:
Figures 2.3.1-1 and 2.3.1-2, in Attachment 5 of the LAR, show the Unit 1 Containment LOCA and MSLB Accident Temperature and Pressure Profiles vs.
Plant EQ Profiles of electrical equipment. The profiles in these figures do not appear to have the minimum EQ margins required per IEEE 323-1974. Provide justifications for apparent lack of margins. Provide discussion of the margins in the pre-EPU and post-EPU stages.
EEEB-3:
Page 2.3.1-6 in Attachment 5 of the LAR states, Pressure effects are generally stress-related rather than age degradation related. Provide clarification as to how pressure effects were considered for environmental qualification.
EEEB-4:
Page 2.3.1-6 in Attachment 5 of the LAR, states, Using the information available in the Doc Pacs, any equipment that could not be qualified by direct comparison to the beta radiation dose plus the total integrated gamma dose was assessed for potential beta dose reduction. Factors included consideration if a component was sealed, equipment shielding considerations. Provide a summary of EQ calculations in which radiation reduction factors were considered necessary as a result of EPU. In particular, confirm whether the following statement in RG 1.89, Section C.2.c(6) was considered in the calculation: If, after considering the appropriate shielding factors, the total beta radiation dose contribution to the equipment or component is calculated to be less than 10% of the total gamma radiation dose to which the equipment or component has been qualified, the equipment or component is considered qualified for beta and gamma radiation environment.
EEEB-5:
Provide a comparison of radiation levels, pre and post EPU for plant areas that have electrical equipment that have changed from mild to harsh radiological environments.
EEEB-6:
Page 2.3.1-9 and Table 2.3.1-1 in Attachment 5 of the LAR list four components which are now considered to be located in a harsh radiation environment.
However, in Table 2.3.1-2, five components (additional component HVE-6B) are identified. Explain the apparent discrepancy.
EEEB-7:
Provide a justification for not performing an evaluation of High Energy Line Break analysis for the impact on the EQ of the electric equipment inside containment.
EEEB-8:
Page 2.3.1-10 in Attachment 5 of the LAR states, The localized MSLB accident temperature of 3200 F is exceeded by a few degrees for a matter of seconds while steam is flowing; however, this has been evaluated for qualified equipment in the trestle area and found not to have any impact. Discuss in detail how the localized MSLB accident temperature of 3200 F is exceeded by how many degrees for how many seconds while steam is flowing. Discuss how this condition meets the required EQ temperature margin in accordance with 10 CFR 50.49 and Regulatory Position C.4 in Regulatory Guide 1.89.
EEEB-9:
Confirm that the Target Dose, shown in Table 2.3.1-1, Attachment 5 of the LAR, is the Target Total Integrated Dose for the impacted electrical equipment.
EEEB-10:
Page 2.3.4-3 in Attachment 5 of the LAR states, Each batterys capacity permits 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of emergency operation without assistance from a battery charger. Each station battery supplies power for 125 VDC safety loads that include
.instrument power along with some non-Class loads Confirm that a failure of these non-safety loads under postulated environmental conditions will not prevent satisfactory accomplishment of safety functions of the safety-related batteries.
EEEB-11:
Table 2.3.1-2 in Attachment 5 of the LAR indicates submergence level in the Reactor Containment Building is increased due to EPU but there is no impact on the electrical equipment. Provide a summary of your evaluation that determined that there is no impact on the electrical equipment.
EEEB-12:
Section 2.3.3.2.4 in Attachment 5 of the LAR provides a summary of the following planned modifications for EPU conditions:
The current limiting reactors (CLRs) are being replaced with lower impedance CLRs. Provide the following: 1) Details on the change in fault current as a consequence of this change, and fault current contribution due to the higher rating of the main generator and additional motor loads and 2) A summary of the calculation performed to validate the degraded voltage relay setting after the auxiliary system load and impedance changes.
The non-safety sections of the 480V Motor Control Centers 1A5/1B5 and 1A6/1B6 will be tripped on a safety injection actuation signal (SIAS). If this modification is required to satisfy separation criteria, provide details on how the existing configuration is in compliance with separation criteria between safety and non-safety related circuits.
EEEB-13:
Appendix H in Attachment 5 of the LAR states that the proposed EPU meets the reactive capability requirements of the grid. Provide the specific reactive power requirements pre-EPU and post EPU and explain how the licensee satisfies the requirements of the Standard Large Generator Interconnection Procedures in FPLs Open Access Transmission Tariff (OATT). Confirm that post trip voltages at the safety busses are adequate for plant shutdown in the event that Unit 1 and
Unit 2 were operating at the maximum required power factor during stressed grid conditions.
EEEB-14:
The results of grid stability analyses are provided in Appendix H. The voltages at the St Lucie 230 kV busses are assumed to be approximately 104% of nominal with the result that post contingency (i.e. post loss of line or generation) voltages are considered acceptable. Provide details on the allowable voltage range for the transmission system and the justification for selecting the 104% of nominal voltage as the starting point. Also include the reactive power support provided by St Lucie Units pre and post contingencies that were evaluated.
EEEB-15:
The seven case studies performed for grid stability analyses (Appendix H) concluded that the grid was stable for the specific cases. Case studies 3 and 4 indicate significant voltage and frequency variations for an extended duration (up to 8 seconds). Operating experience has indicated that reactor coolant pump (RCP) flow is changed when the RCP motor is subjected to voltage and frequency variations. Provide details on the effect of the voltage and frequency variations during the worst case grid transients and verify that the consequences of the grid transients will not lead to additional unit trips. In addition, explain how the models were validated with respect to operational events on the grid.
EEEB-16:
Page 2.3.3-5 in Attachment 5 of the LAR states, However, isolated phase bus (IPB) main transformer (MT), unit auxiliary transformer (UAT) and potential transformer (PT) tap buses short circuit design ratings are less than the anticipated worst-case fault current levels for both pre-EPU and EPU conditions.
This is a current plant design issue. The over duty condition on IPB tap buses will be further analyzed and corrective action, as appropriate, completed prior to EPU. Provide details on the final resolution and modifications on the above issue. Explain how the final modifications will resolve the above issue for EPU conditions.
EEEB-17:
Page 2.3.3-6 in Attachment 5 of the LAR states, The existing MT 1A will have its cooling unit upgraded. The existing MT 1B is to be swapped with existing spare transformer. Provide details on transformer impedances (MT 1A, MT 1B, and MT spare) and any evaluations performed for circulating currents in the event of unbalanced loading resulting in potential degradation of operating safety related equipment.
EEEB-18:
Section 2.3.3 of Attachment 5 of the LAR concludes that the emergency diesel generator (EDG) loading has increased but maximum load is within the rating of the EDGs. Provide a summary of calculation(s) detailing the EDG loading with EPU changes and the EDGs operating at the worst case allowable voltage and frequency.
EEEB-19:
The LAR indicates that EDG loading has increased. Provide a summary of the calculation validating the proposed 19,000 gallons of fuel oil requirement for each EDG (as shown on the marked-up pages of TS LCOs 3.8.1.1.b.2 and 3.8.1.2.b.2 of Attachment 3 of the LAR).
EEEB-20:
Page 2.3.5-1 in Attachment 5 of the LAR states, The SBO analysis credits the availability of an EDG from St. Lucie 2 as an alternate alternating current
source. The safety related loading on EDGs for Unit 1 has increased. Provide a summary of the calculation detailing the margin in Unit 2 EDGs when used as an AAC source for Unit 1 SBO conditions.
EEEB-21:
Page 2.3.5-3 in Attachment 5 of the LAR, states, One hour direct current (dc) coping is assumed to start at the actual time of the SBO. Attachment 8, 10 CFR 50.63 Station Blackout DC Coping, to this LAR provides an analysis of the stations ability to cope for up to one hour without alternate alternating current power available. Section 2.1 in Attachment 8 of the LAR states, The transition from 25-minute to one-hour dc coping does not compromise the Class 1E 125 V dc system function during the SBO event. The station batteries have sufficient capacity to power the necessary loads for one hour under SBO conditions with 100% margin. Confirm that one hour dc coping time supported by the safety related station batteries will be verified by periodic battery service tests for the SBO load profile for the one hour dc coping duration.
EEEB-22:
Page 26 in Attachment 8, Appendix A of LAR shows that time of the Motor Operated Valves (MOV) MV-08-03 (on bus 1AB) and MV-08-13/14 and MV 11/12 (on bus 1AB-1) as 0 - 60 seconds. However, Table 3.34 Station Blackout Sequence of Events in Attachment 8, Appendix B of LAR reflects beginning of Auxiliary Feedwater (FW) delivery to the steam generators at 336.6 seconds which would mean that all Auxiliary FW loads will start at approximately 336.6 seconds. Provide clarification for discrepancy on timing of actuation of Auxiliary Feedwater System motor operated valve loads between Page 26 in Attachment 8, Appendix A of LAR and Table 3.34 in Attachment 8, Appendix B of LAR.
EEEB-23:
Provide details on any load shedding that is required to extend the SBO coping time for the safety-related batteries to one hour due to proposed uprate.
EEEB-24:
As a result of the proposed uprate, discuss any change(s) in frequency of loss of offsite power and/or reliability of the EDGs as discussed in Regulatory Guidance 1.155 since the NRC staff approved the original SBO Coping analyses.