IR 05000335/2025403
| ML25111A116 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/22/2025 |
| From: | Daniel Bacon NRC/RGN-II/DORS/EB2 |
| To: | Coffey R Florida Power & Light Co |
| References | |
| IR 2025403 | |
| Download: ML25111A116 (1) | |
Text
SUBJECT:
ST. LUCIE NUCLEAR PLANT - CYBER SECURITY INSPECTION REPORT 05000335/2025403 AND 05000389/2025403
Dear Robert Coffey:
On March 13, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at St. Lucie Nuclear Plant. On March 13, 2025, the NRC inspectors discussed the results of this inspection with Christina Sheridan (Acting SITE VP) and other members of your staff. The results of this inspection are documented in the enclosed report.
Three findings of very low security significance (Green) are documented in this report. Three of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at St. Lucie Nuclear Plant.
The following cross cutting aspects were assigned to findings using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: one [H.10] - Bases for Decisions, one [H.12] - Avoid Complacency, and one [H.13] - Consistent Process.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at ST.
LUCIE NUCLEAR PLANT.
April 22, 2025 This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
Daniel M. Bacon, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000335 and 05000389 License Nos. DPR-67 and NPF-16 Enclosure:
As stated cc w/o encl: Distribution via LISTSERV Signed by Bacon, Daniel on 04/22/25
ML25111A124 (Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML25111A116 (Cover letter)
Entire Report:
X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter Only:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RII/DORS RII/DORS NAME L. JONES D. Bacon DATE 4/21/25 4/22/25