MONTHYEARL-MT-21-035, Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System2021-05-0707 May 2021 Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System ML19091A0502019-03-21021 March 2019 Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System ML19087A2522019-03-21021 March 2019 Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System ML19042A0802019-01-25025 January 2019 Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI L-MT-18-012, Interim Report of a Deviation or Failure to Comply2018-02-12012 February 2018 Interim Report of a Deviation or Failure to Comply L-MT-18-008, Initial and Final Part 21.21(d)(4) Report Notification of Failure to Comply or Existence of a Defect Regarding Westinghouse Breaker Cubicle2018-02-0101 February 2018 Initial and Final Part 21.21(d)(4) Report Notification of Failure to Comply or Existence of a Defect Regarding Westinghouse Breaker Cubicle ML17212A6282017-07-24024 July 2017 Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 L-MT-17-031, Interim Report of a Deviation or Failure to Comply Regarding New Relay Coil GE Part Number 6306774G12017-04-20020 April 2017 Interim Report of a Deviation or Failure to Comply Regarding New Relay Coil GE Part Number 6306774G1 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling L-MT-17-005, Interim Report of a Deviation or Failure to Comply2017-01-17017 January 2017 Interim Report of a Deviation or Failure to Comply ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML15265A4182015-09-21021 September 2015 Sor, Inc. - Part 21 Notification of Deviation - ML15251A212 Irradiation Certification with Insufficient Margin ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14212A4012014-07-18018 July 2014 Final Report - 10 CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars ML14134A1222014-05-0909 May 2014 Notification of Potential Part 21 Report - Cracking in KCR-13 Standby Battery Jars ML14139A0172014-04-28028 April 2014 Updated Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars ML14042A2022014-02-0505 February 2014 Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies ML14042A2012014-01-29029 January 2014 Part 21 Report Regarding Non-Destructive Testing Did Not Meet Procedural Requirements ML13358A3062013-12-20020 December 2013 Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars ML14006A0042013-12-13013 December 2013 Trivis, Inc., Part 21 Interim Report - Nonconforming Dry Shielded Calster Welds - Potential Substantial Safety Hazard ML13358A0462013-12-13013 December 2013 Report of Potential Substantial Safety Hazard in Accordance with Title 10 Code of Federal Regulation, Part 21 ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0842013-08-23023 August 2013 Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11341A0602011-12-0505 December 2011 Notification of Potential Part 21 Involving Defective Spring Clips Used as Seismic Restraints on Two Scientific Modules ML11340A1002011-12-0505 December 2011 Letter 10 CFR Part 21 Notification Report, CON2000 and RTD2100 Spring Clips 2021-05-07
[Table view] |
Text
0411512011 4/U.S. NuclearRegulator, Commission Operations Center Event Report PareI Part 21 (PAR) Event# 46760 Rep Org: ENGINE SYSTEMS, INC Notification Date I Time: 04/15/2011 17:29 (EDT)
Supplier: ENGINE SYSTEMS, INC Event Date / Time: 04/15/2011 (EDT)
Last Modification: 04/15/2011 Region: 1 Docket #:
City: ROCKY MOUNT Agreement State: Yes County: License #:
State: NC NRC Notified by: TOM HORNER Notifications: KATHLEEN O'DONOHUE R2DO
-'HQ Ops Officer: JOHN KNOKE STEVE ORTH R3DO Emergency Class: NON EMERGENCY PART 21 GROUP email 10 CFR Section:
21.21 UNSPECIFIED PARAGRAPH POTENTIAL DEFECT IN MAGNETROL LEVEL SWITCH FROM ENGINE SYSTEMS INCORPORATED "Engine Systems, Incorporated (ESI) began an evaluation of a level switch on February 16, 2011. Monticello Nuclear Plant returned a level switch for failure evaluation. The reported condition was that the switch mechanism would not actuate throughout the entire level range. ESI supplied the level switch in July, 2008. The switch was functionally tested prior to shipment and it worked properly at that time. It remained in customer inventory until recently when it was tested and the problem was identified.
"This level switch is used in the fuel oil day tank of some EMD 999 emergency diesel generators and controls the fuel transfer pump. Malfunctioning of this switch could prevent the fuel transfer pump from operating and therefore the diesel generator could shut down due to insufficient fuel supply; thus preventing the diesel generator from performing its safety related function. The EMD 999 fuel system also incorporates a backup fuel transfer pump that is controlled by the level alarm switch within the day tank. The backup transfer pump turns on when the low level alarm is actuated and turns off when the high level alarm actuates.
"ESI has been conducting tests and inspections of the returned level switch and will be coordinating with the manufacturer (Magnetrol) to complete our evaluation. To date, no other similar failures with this Magnetrol level switch have been reported to ESI."
Component: Magnetrol level switch, ESI P/N: 8277780-ESI, Magnetrol type A10 Report No: 10CFR21-0101-INT
~iWL~7Ic1
Received at: 04/15/2011.17:29 04-15-11;05:33PM; # 1/ 4 SZ3ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NO 27804 Telephone: 252/977-2720 Fax:
Nzýý 2S2/446-1134 TELEFAX Date: April 15, 2011 Company: NRC Operations Center Fax Number: 301/816-5151 Verification No.: 301/816-5100
Reference:
Report No. 10CFR21-0101-INT, Rev, 0 From: Tom Homer Page: 1 of 4 Dear Sir Following this cover is a copy of our Interim Report 10CFR21 -0101 -INT, Rev.0, for a 1QCFR21 deviation evaluation regarding a Magnetrol level switch, ESI P/N:
8277780-ESI, Magnetrol type Al 0.
A copy of the report will be mailed to the NRC Document Control Desk.
Should you have questions, please let us know.
Sincerely, ENGINE SYSTEMS, INC.
Tom Homer Quality Assurance Manager Quality Performance With Pride
04-15-11;05:33PM; # 2/ 4 n/
EB'd ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax. 252/446-1134 Report No. 10CFR21-0101-1NT Rev. 0: 04/15/11 INTERIM REPORT 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Magnetrol level switch ESI P/N: 8277780-ESI Magnetrol type A10 SYSTEM: Emergency Diesel Generator - fuel oil system CONCLUSION: Not yet completed Prepared By: Date: 4//C//
Engineering Manager Reviewed By: Date: .- 222L-//
Quality Assurance Manager Quality Performance With Pride
04-15-11;05:33PM; # 3/ 4 Report No. 10CFR21-101-INT Record of Revisions Page: I of 1 REV DATE PAGE DESCRIPTION 0 04/15/11 Initial issue.
04-15-11;05:33PM; # 4/ 4 Report NO, 100FR21-101-1NT Revision: 0 Date: 04/15/11 Page: 1 of 1 COMPONENT:
Magnetrol level switch ESI P/N: 8277780-ESI Magnetrol type A10 PURPOSE:
This interim report is being issued because Engine Systems, Inc. (ESI) is not able to complete an evaluation of an identified deviation within the 60 day requirement of 1 0CFR21.21. The evaluation is expected to be completed no later than May 15, 2011.
SUMMARY
ESI began an evaluation of a level switch on February 16, 2011. Monticello Nuclear Plant returned a level switch for failure evaluation. The reported condition was that the switch mechanism would not actuate throughout the entire level range. ESI supplied the level switch in July, 2008, The switch was functionally tested prior to shipment and it worked properly at that time. It remained in customer inventory until recently when it was tested and the problem was identified.
This level switch is used in the fuel oil day tank of some EMD 999 emergency diesel generators and controls the fuel transfer pump. Malfunctioning of this switch could prevent the fuel transfer pump from operating and therefore the diesel generator could shut down due to insufficient fuel supply; thus preventing the diesel generator from performing its safety related function. The EMD 999 fuel system also incorporates a backup fuel transfer pump that is controlled by the level alarm switch within the day tank, The backup transfer pump turns on when the low level alarm is actuated and turns off when the high level alarm actuates.
ES! has been conducting tests and inspections of the returned level switch and will be coordinating with the manufacturer (Magnetrol) to complete our evaluation.
To date, no other similar failures with this Magnetrol level switch have been reported to ESI.