Category:Letter type:L
MONTHYEARL-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-24-002, Submittal of Revision 41 to the Updated Safety Analysis Report2024-04-17017 April 2024 Submittal of Revision 41 to the Updated Safety Analysis Report L-MT-24-004, Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP)2024-04-17017 April 2024 Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP) L-MT-24-006, Subsequent License Renewal Application Annual Update 1 and Supplement 92024-02-29029 February 2024 Subsequent License Renewal Application Annual Update 1 and Supplement 9 L-MT-24-007, Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval2024-02-15015 February 2024 Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval L-MT-24-001, 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval2024-01-30030 January 2024 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-053, Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch2023-12-0404 December 2023 Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases 2024-09-26
[Table view] Category:License-Operator
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5762021-04-19019 April 2021 GFE Results, March 2021 ML21019A2172020-11-0303 November 2020 Initial License Exam Proposed Scenarios ML21019A4262020-11-0303 November 2020 Initial License Exam Forms ES-301-6 ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key ML21013A5452020-11-0303 November 2020 Initial License Exam Forms ES-D1 ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5432020-11-0303 November 2020 Initial License Exam Forms ES-401-1 and 401-3 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21019A5722020-11-0303 November 2020 Initial License Exam Administered JPMs ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21019A4332020-11-0303 November 2020 Initial License Exam Proposed Exam Submittal Letter ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21013A5072020-11-0303 November 2020 Initial License Exam Forms ES-301-5 ML21013A5052020-11-0303 November 2020 Initial License Exam Form ES-201-2 ML21020A1062020-11-0303 November 2020 Initial License Exam Form ES-403-1 ML21019A4232020-11-0303 November 2020 Initial License Exam Forms ES-301-3 and 301-4 L-MT-20-042, Initial License Exam Post Exam Letter2020-10-30030 October 2020 Initial License Exam Post Exam Letter ML20293A2562020-10-16016 October 2020 Operator Licensing Examination Approval L-MT-20-006, Plant'S Response to Regulatory Issue Summary 2020-012020-03-16016 March 2020 Plant'S Response to Regulatory Issue Summary 2020-01 ML19106A0172019-04-15015 April 2019 GFE Results, March 2019 ML19045A3722019-02-12012 February 2019 March 2019 GFE Cover Letter Riii ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III IR 05000263/20183012018-12-27027 December 2018 NRC Initial License Examination Report 05000263/2018301 2024-07-09
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
2010 MONTICELLO NUCLEAR GENERATING PLANT INlTlAL EXAMINATION 0UTLlNE SUBMITTAL
ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-I021 UNTIL AFTER THE EXAMINATION IS COMPLETE.
Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 August 30,2010 L-MT-10-050 10 CFR 55.40 NUREG-I021 Regional Administrator, Region Ill US Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Mont ice1lo Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 Examination Outlines For the Initial Licensing Examination to Be Conducted the Weeks of December 6 and December 13,2010 Reference 1: NUREG-I 021 , Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1 In accordance with the requirements of 10 CFR 55.40(b)(4), a power reactor facility licensee must receive NRC approval of their proposed written examination and operating tests. Further, 10 CFR 55.40(a), Implementation, requires that examinations meet the requirements of Reference 1. Therefore, enclosed for review are the proposed examination outlines for the initial license examinations for the Monticello Nuclear Generating Plant (MNGP) operator license applicants.
In accordance with 10 CFR 55.49, Integrity of Examinations and Tests, and NUREG-I 021 , Section ES-201, Attachment 1, Examination Security and Integrity Considerations, the Northern States Power Company - a Minnesota corporation (NSPM) requests that the enclosed materials be withheld from public disclosure until after the examinations are complete.
The proposed examination outlines were prepared per the guidelines of Reference 1, Sections ES-301, Preparing Initial Operating Tests, and ES-401, Preparing Initial Site-Specific Written Examinations. Proposed outlines have been prepared to support development, by the NSPM, of examinations for five (5) Reactor Operator (RO) license candidates and eleven (1 1) Senior Reactor Operator (SRO) - Instant license candidates.
Enclosed are the following specific items for your review.
Enclosure 1: Form ES-201-2, Examination Outline Quality Checklist Enclosure 2: Form ES-201-3, (Site Equivalent) Examination Security Agreements Enclosure 3: Form ES-301-1, Administrative Topics Outline - RO
USNRC Page 2 of 2 Enclosure 4: Form ES-301-1, Administrative Topics Outline - SRO Enclosure 5: Form ES-301-2, Control Room / In-Plant Systems Outline - RO Enclosure 6: Form ES-301-2, Control Room / In-Plant Systems Outline - SRO -
Instant Enclosure 7: Form ES-D-1, Scenario Outlines x 6 (ES-301-4 Data included)
Enclosure 8: Form ES-301-5, Transient and Event Checklist Enclosure 9: Form ES-401-1, BWR Examination Outline (Cover)
Enclosure IO: Form ES-401-1, BWR Examination Outline (RO)
Enclosure 11: Form ES-401-3, Generic Knowledge and Abilities Outline (RO)
Enclosure 12: Form ES-401-1, BWR Examination Outline (SRO)
Enclosure 13: Form ES-401-3, Generic Knowledge and Abilities Outline (SRO)
Enclosure 14: Form ES-401-4, Record of Rejected WAS Form Enclosure 15: MNGP 2010 ILT NRC Written Exam Outline Random and Systematic Process / Audit Exam Methodology Enclosure 16: MNGP 2010 ILT Audit Written, JPM, and Scenario Outlines Summarv of Commitments This letter makes no new commitments and no revisions to existing commitments.
F imothy J. OConnor L Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosures (16) cc: Mr. Dell McNeil, Region Ill, USNRC (with enclosures)
Project Manager, Monticello, USNRC (without enclosures)
Resident Inspector, Monticello, USNRC (without enclosures)
ES-201 Examination Out1ine Quality Checklist Form ES-201-2 Facility: Monticello Date of Examination: 12/6/10 Item Task Description I ,initial; 1.
W R
I T
T E
N 2.
S I
M U
L A
T 0
R
- 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form
/ (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test@) I (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
- b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
- c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. 49dh
- 4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the amrorxiate exam sections.
- 3. Author
- 3. Facility Reviewer (*)
- 3. NRC Chief Examiner (#)
A. NRC Supervisor Vote: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
- Not applicable for NRC-prepared examination outlines