OL - FW: 20110204 Open Item List Master TVA Update 02-08-11.docx
ML110420605
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/09/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML110420605 (44)


Text

WBN2Public Resource From: Poole, Justin Sent: Wednesday, February 09, 2011 4:47 PM To: Garg, Hukam; Singh, Gursharan; Darbali, Samir; Carte, Norbert Cc: WBN2HearingFile Resource

Subject:

FW: 20110204 Open Item List Master TVA Update 02-08-11.docx Attachments: 20110204 Open Item List Master TVA Update 02-08-11.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Clark, Mark Steven [1]

Sent: Wednesday, February 09, 2011 4:11 PM To: Crouch, William D; Hilmes, Steven A Cc: Poole, Justin

Subject:

20110204 Open Item List Master TVA Update 02-08-11.docx Bill:

Please forward the attached update to Justin Poole.

Regards, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 257 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7EFF544597)

Subject:

FW: 20110204 Open Item List Master TVA Update 02-08-11.docx Sent Date: 2/9/2011 4:47:02 PM Received Date: 2/9/2011 4:47:08 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>

Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>

Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>

Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 677 2/9/2011 4:47:08 PM 20110204 Open Item List Master TVA Update 02-08-11.docx 451198 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N B (

1. Y 001 All All A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (
2. Y 002 All All A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (
3. Y 003 All All A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains

( B 004 All All Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting 4. Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.1 By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb 5. Y Closed Closed EICB RAI TVA Letter dated D 6. Y

( ( ( (

006 Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2 Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1 a ( The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7. Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3 G G G G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8. Y Closed Closed EICB RAI TVA Letter dated r A 009 7.3.2 5.6, Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9. Y Closed Closed EICB RAI 3/12/10,

(

010 7.3 7.3 The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, D

a r

(

011 7.3.2 5.6, NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y Closed Closed EICB RAI ML101680598, D

a r

( 12. Y 012 7.4 7.4 ( D The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 Closed Closed EICB RAI TVA Letter dated G a r 13. Y 013 7.1.3.1 Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All ( B Provide the justification for any hardware and software changes Date: 4/27/10 14. Y Closed Closed NRC Meeting TVA Letter dated 015 D ( Verify that the refurbishment of the power range nuclear Date: 4/27/10 15. Y Closed Closed NRC Meeting TVA Letter dated

(

016 a C ( Identify the precedents in license amendment requests (LARs), if Date: 4/27/10 16. Y Closed Closed NRC Meeting TVA Letter dated G

r a A 17. Y 017 7.3.1 7.3.1, Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10 Closed Closed NRC Meeting TVA Letter dated

(

018 Identify any changes made to any instrumentation and control Date: 4/27/10 18. Y Closed Closed NRC Meeting TVA Letter dated 019 Verify that the containment purge isolation radiation monitor is the Date: 4/27/10 19. Y Closed Closed NRC Meeting TVA Letter dated

( D 020 Provide environmental qualification information pursuant to Section Date: 4/27/10 20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

021 7.3 ( ( ( ( ( For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10 21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be C a G G G G G 022 7.3.2 5.6, Verify the auxiliary feedwater control refurbishment results in a Date: 4/27/10 22. Y Closed Closed NRC Meeting TVA Letter dated a r 023 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

024 Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a 24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address

( ( ( ( ( (

025 7.5.2 7.5.1 For the containment radiation high radiation monitor, verify that the Date: 4/27/10 25. Y Closed Closed NRC Meeting ML101230248, 026 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

( ( ( (

027 7.7.1.4 For Foxboro I/A provide information regarding safety/non-safety- Date: 4/27/10 27. Y Closed Closed NRC Meeting TVA Letter dated 028 For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen 28. Y Closed Closed NRC Meeting TVA Letter dated C C C C C S 029 For the rod control system, verify that the refurbishment results in a Date: 4/27/10 29. Y Closed Closed NRC Meeting TVA Letter dated G G G G 030 Regarding the refurbishment of I&C equipment, identify any Responder: Clark 30. Y Closed Closed NRC Meeting TVA Letter dated 031 For the rod position indication system (CERPI), provide information Date: 4/27/10 31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

a a a a a i 032 For the process computer, need to consider cyber security issues Date: 4/27/10 32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033 For the loose parts monitoring system, provide information Date: 4/27/10 33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034 2/4/2010 Responder: TVA 34. Y Closed Closed N/A TVA Letter dated 034.1 ( Chapter 7.1 - Introduction 35. Y Closed Closed N/A N/A

( a 034.2 D Chapter 7.2 - Reactor Trip System 36. Y Closed Closed N/A N/A M ( r 034.3 7.3 7.3 a Chapter 7.3 - ESFAS 37. Y Closed Closed N/A N/A a G g r 38. Y 034.4 7.5.1.1 7.5.2 Chapter 7.5 - Instrumentation Systems Important to Safety Closed Closed N/A N/A Closed 034.5 7.5.1.1 7.5.2 Chapter 7.6 - All Other Systems Required for Safety 39. Y Closed Closed N/A N/A Closed r

c u

034.6 Chapter 7.7 Control Systems 40. Y Closed Closed N/A N/A n

g h

/

035 ( 2/18/2010 Responder: Clark 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design

( (

M 036 7.5.2 7.5.1 C S February 18, 2010 Date: 5/25/10 42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post a

a i 43. Y 037 7.5.1.1 7.5.2 2/18/2010 Responder: Clark Date: 5/25/10 Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 038 7.5.1.1 7.5.2 ( 2/18/2010 Responder: Clark Date: 5/25/10 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039 ( ( M January 13, 2010 Responder: Clark Date: 5/25/10 45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the G G a 46. Y 040 January 13, 2010 Responder: Clark Date: 5/25/10 Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the B

042 All All February 25, 2010: Telecom Date: 5/25/10 47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 044 7.5.2 7.5.1 February 25, 2010 Date: 5/25/10 48. Y Closed Closed EICB RAI TVA Letter dated 045 February 25, 2010 Date: 5/25/10 49. Y Closed Closed EICB RAI TVA Letter dated 046 ( ( ( ( ( ( ( February 25, 2010 Date: 5/25/10 50. Y Closed Closed N/A - Request for N/A

(

047 7.5.2 7.5.1 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 51. Y Closed Closed EICB RAI TVA Letter dated C C C C C C C (

048 7.5.2 7.5.1 April 8, 2010 Date: 5/25/10 52. Y Closed Closed EICB RAI TVA Letter dated G

049 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 53. Y Closed Closed EICB RAI TVA Letter dated a a a a a a a A 050 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051 April 15, 2010 Date: 5/25/10 55. Y Closed Closed N/A N/A Review addressed by another Open

(

052 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 56. Y Closed Closed RAI No. 12 S

i

(

053 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 57. Y Closed Closed RAI No. 13 S

i

(

054 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 58. Y Closed Closed RAI No. 14 TVA Letter dated S

i

(

055 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 59. Y Closed Closed RAI No. 15 TVA Letter dated S

i

(

056 April 19, 2010 Date: 5/25/10 60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring S

i

(

057 7.5.2 7.5.1 4/19/2010 Responder: TVA I&C Staff Date: 5/25/10 61. Y Closed Closed RAI No. 17 TVA Letter dated S

i

(

058 7.5.0 7.5 April 19, 2010 Date: 5/25/10 62. Y Closed Closed RAI No. 18 TVA Letter dated S

i

( ( ( ( ( ( ( ( ( ( ( ( ( ( (

059 7.5.2 7.5.1 April 19, 2010 Date: 63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 64. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 65. Y Closed Closed N/A N/A Addressed by Open Item No. 48

( (

062 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 66. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 67. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010 68. Y Closed Closed N/A - No question TVA Letter dated C C C C C C C C C C C C C C S 065 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 69. Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 70. Y Closed Closed N/A - No question TVA Letter dated 070 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 71. N Closed Closed N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this G G 071 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 72. N Closed Closed N/A - No question N/A NNC 11/23/10: The dues date in this 072 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 73. Y Closed Closed N/A - No question N/A a a a a a a a a a a a a a a i 073 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 74. N Closed Closed N/A - No question N/A 075 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 75. N Closed Closed N/A - No question N/A 076 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10 76. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 77. Y Closed Closed N/A - No question TVA Letter dated 078 4/26/2010 Responder: Clark Date: 5/25/10 78. Y Closed Closed EICB RAI TVA Letter dated 079 4/26/2010 Responder: Clark Date: 5/25/10 79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154

( ( ( (

080 4/26/2010 Responder: WEC 80. Y Closed Closed RAI No. 2 TVA Letter dated 083 7.5.2 7.5.1 May 6, 2010 Date: 6/18/10 81. Y Closed Closed EICB RAI TVA Letter dated C C C S 084 7.5.2 7.5.1 May 6, 2010 Date: 6/18/10 82. Y Closed Closed EICB RAI TVA Letter dated a a a i 085 7.5.2 7.5.1 5/6/2010 Responder: WEC 83. N Closed Closed EICB RAI

(

087 7.5.2 7.5.1 May 6, 2010 Date: 5/24/10 84. Y Closed Closed RAI No. 20 TVA Letter dated S

i 088 7.5.2 7.5.1 ( ( May 6, 2010 Date: 5/24/10 85. Y Closed Closed RAI No. 21 TVA Letter dated C S a i 86. Y 089 5/6/2010 Responder: Clark Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( 87. Y 090 D ( 5/6/2010 Responder: Clark Date: 5/25/10 Closed Closed EICB RAI TVA Letter dated a C r a 88. Y 091 7.4 7.4 May 20, 2010 Date: 5/25/10 Closed Closed EICB RAI No.1 TVA Letter dated 093 ( May 20, 2010 Date: 5/25/10 89. Y Closed Closed N/A N/A Will be reviewed under item 154 D ( (

094 a 5/20/2010 Responder: Clark Date: 5/25/10 90. Y Closed Closed N/A N/A Information was found in FSAR r G G 095 7.8.1, XX May 20, 2010 Date: 91. Y Closed Closed EICB RAI No. 2 TVA Letter dated

(

096 7.7.5 XX 5/20/2010 Responder: 92. Y Closed Closed EICB RAI No.3 TVA Letter dated D

a r

(

097 7.4.2 7.4 May 20, 2010 Date: 93. Y Closed Closed EICB RAI No.4 TVA Letter dated D

a r

(

098 7.4.2 7.4 May 25, 2010 Date: 94. Y Closed Closed EICB RAI No.5 TVA Letter dated D

a r

099 April 12, 2010 Date: 95. Y Closed Closed Closed to Item 129

(

(

100 D ( ( 5/20/2010 Responder: WEC 96. Y Closed Closed N/A - No question N/A B

102 a C C May 24, 2010 Date: 5/24/10 97. Y Closed Closed N/A TVA Letter dated Request for schedule not information.

a r a a 98. Y 103 7.4 7.4 5/27/2010 Responder: Ayala Date: 5/27/10 Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current

( 99. Y 104 7.4 7.4 ( D 5/27/2010 Responder: Merten Date: 5/27/10 Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current G a r 100. Y 105 April 29, 2010 Date: Closed Closed N/A N/A Will be reviewed under item 154.

106 May 6, 2010 Date: 5/25/10 101. Y Closed Closed RAI No. 9 TVA Letter dated

(

S i

107 May 6, 2010 Date: 5/28/10 102. Y Closed Closed RAI No. 22 TVA Letter dated

(

108 D ( ( May 6, 2010 Date: 5/25/10 103. Y Closed Closed N/A N/A Will be reviewed under OI#154

(

109.b a C S 5/6/2010 Responder: N/A 104. Y Closed Closed N/A N/A Duplicate of another open Item.

G r a i 105. Y 109.a 7.8 XX 5/6/2010 Responder: N/A Closed Closed N/A N/A

(

110 May 6, 2010 Date: 106. Y Closed Closed N/A N/A Information was found.

111 May 6, 2010 Date: 5/28/10 107. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112 June 1, 2010 Date: 108. Y Closed Closed N/A N/A Information was received 113 D ( (

6/1/2010 Responder: Clark 109. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2 ( ( ( ( ( (

6/1/2010 Responder: WEC 110. Y Close Closed EICB RAI TVA Letter dated a C C 115 2/25/2010 Responder: Clark 111. Y Closed Closed EICB RAI TVA Letter dated G G G G G G 116 6/3/2010 Responder: WEC 112. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting r a a 117 7.1 7.1 6/3/2010 Responder: Hilmes 113. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4 6/8/2010 Responder: Merten 114. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current

(

119 June 10, 2010 Date: 115. Y Closed Closed RAI No. 23 TVA Letter dated 120 5/6/2010 Responder: Hilmes/Merten/Costley 116. Y Closed Closed EICB RAI TVA Letter dated D ( ( ( (

121 5/6/2010 Responder: Webb/Webber 117. Y Closed Closed EICB RAI TVA Letter dated a C C C S 122 June 14, 2010 Date: 118. Y Closed Closed N/A - Request for N/A r a a a i 123 7.7.3 7.4.1, 6/14/2010 Responder: 119. Y Closed Closed ML101720589, TVA Letter dated

(

124 7.7.5 XX 6/14/2010 Responder: 120. Y Closed Closed ML101720589, Item TVA Letter dated D

a r

(

125 7.7.8 7.7.1.12 6/14/2010 Responder: 121. Y Closed Closed ML101720589, Item TVA Letter dated D

a r

126 7.8 7.8 ( June 14, 2010 Date: 122. Y Closed Closed ML101720589, Item TVA Letter dated

( ( D 127 7.2 7.2 a 6/16/2010 Responder: WEC/Clark 123. Y Closed Closed EICB RAI TVA Letter dated G G r 128 7.2 7.2 6/18/2010 Responder: WEC Drake /TVA Craig 124. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item

(

129 6/12/2010 Responder: WEC 125. Y Closed Closed N/A TVA Letter dated P

o

(

130 6/28/2010 Responder: Clark 126. Y Closed Closed N/A TVA Letter dated P

o

(

131 6/28/2010 Responder: Clark 127. Y Closed Closed N/A TVA Letter dated P

o

(

132 6/28/2010 Responder: Clark 128. Y Closed Closed N/A TVA Letter dated P

o

(

133 6/28/2010 Responder: Clark 129. Y Closed Closed TVA Letter dated P

o

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( (

134 6/28/2010 Responder: Clark 130. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 6/30/2010 Responder: Clark 131. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6, 6/30/2010 Responder: Clark 132. Y Closed Closed RAI not necessary TVA Letter dated 137 Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 133. Y Closed Closed ML101650255, Item TVA Letter dated 139 The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 134. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140 The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) Responder: Clark 135. N Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 141 Deleted by DORL Date: 136. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements

( ( ( ( ( ( ( D D (

146 6/17/2010 Responder: 137. Y Closed Closed ML101650255, Item PAMS System Requirements 147 6/17/2010 Responder: 138. Y Closed Closed ML101650255, Item PAMS System Requirements 148 6/17/2010 Responder: 139. Y Closed Closed ML101650255, Item PAMS System Requirements

( ( ( ( ( ( ( ( ( ( ( ( ( ( (

149 7.2 7.2 FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 140. Y Close Closed ML101720589, Item TVA Letter dated 150 7.2 7.2 Many of the changes were based on the Westinghouse document Responder: Clark 141. Y Close Closed ML101720589, Item TVA Letter dated 151 7.2 7.2 Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 142. Y Close Closed ML101720589, Item TVA Letter dated C C C C C C C a a P 152 7.2 7.2 Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 143. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2 FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 144. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2 FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 145. Y Closed Closed ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL G G G G G G G G G G G G G G G 155 7.2 7.2 Summary of FSAR change document section 7.2 states that Date: 146. Y Closed Closed ML101720589, Item 156 7.2 7.2 FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1- Responder: WEC 147. Y Closed Closed ML101720589, Item TVA Letter dated Response on hold pending 157 7.2 7.2 FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 148. Y Close Closed ML101720589, Item TVA Letter dated a a a a a a a r r o 158 7.2 7.2 FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 149. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2 FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 150. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2 FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 151. Y Close Closed ML101720589, Item TVA Letter dated 161 7.2 7.2 FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 152. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2 FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 153. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2 Deleted by DORL Date: 154. Y Closed Closed ML101720589, Item 164 7.2 7.2 FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 155. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a

165 7.2 7.2 FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 156. Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2 Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 157. Y Closed Closed ML101720589, Item TVA Letter dated

( (

167 7.2 7.2 FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 158. Y Close Closed ML101720589, Item TVA Letter dated 168 7.2 7.2 FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 159. Y Close Closed ML101720589, Item TVA Letter dated

( ( ( r 169 6/18/2010 Responder: Clark 160. Y Closed Closed 170 6/17/2010 Responder: Clark 161. Y Closed Closed M M ( ( ( ( ( ( ( ( ( ( ( (

171 7.2 7.2 6/17/2010 Responder: Craig 162. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172 6/17/2010 Responder: Craig 163. Y Closed Closed EICB RAI C C C g 173 7.1 7.1 6/17/2010 Responder: Craig/Webb/Powers 164. Y Closed Closed EICB RAI 174 6/28/2010 Responder: Hilmes/Craig 165. Y Closed Closed EICB RAI a a G G G G G G G G G G G G 175 June 28, 2010 Responder: 166. Y Closed Closed EICB RAI 176 7.1 7.1 6/28/2010 Responder: Craig/Webb 167. Y Closed Closed EICB RAI 177 7.5.2.1 7.5.1 7/15/2010 Responder: Clark 168. Y Closed Closed N/A TVA Letter dated RAI not required a a a l 178 7.5.2.1 7.5.1 7/15/2010 Responder: Clark 169. Y Closed Closed N/A TVA Letter dated RAI not required 179 An emphasis is placed on traceability in System Requirements Responder: WEC 170. Y Closed Closed N/A - Closed to NA 180 The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 171. Y Closed Closed N/A - Closed to NA 181 An emphasis is placed on traceability in System Requirements Responder: WEC 172. Y Closed Closed N/A - Closed to NA

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

(

182 Characteristics that the SRP states that a Software Requirements Responder: WEC 173. Y Closed Closed N/A - Closed to NA 184 7/15/2010 Responder: WEC 174. Y Closed Closed N/A - Closed to N/A

( ( D ( (

186 7.7.8 7.7.1.12 7/15/2010 Responder: Perkins/Clark 175. Y Closed Closed EICB RAI No.6 TVA Letter dated C C a C C 187 By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten 176. N Closed Closed ML101970033, Item TVA Letter dated Are these connections already a a r a a 188 By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark 177. Y Closed Closed ML101970033, Item TVA Letter dated

(

189 7.6.7 7/20/2010 Responder: Clark 178. Y Closed Closed RAI No. 3 TVA Letter dated S

i

( ( ( ( (

190 7.9 FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 179. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

( (

191 7.9 NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins 180. Y Closed Closed ML10197016, Item TVA Letter dated M M M M M 192 7.5.1.1 7.5.2 The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 181. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to C S 193 7.5.1.1 7.5.2 The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 182. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 194 7.5.1.1 7.5.2.1 The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 183. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to a i 195 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 184. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 185. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 ( ( Open Item 197 was never issued. 186. Y Closed Closed 198 7.5.1.1 7.5.2.2 M M X SRP Section 7.5, Subsection III, Review Procedures states: Responder: Costley/Norman 187. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a 188. Y 199 7.5.1.1 7.5.2.3 The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 189. Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

201 7.7.1.1 7.7.11 7/21/2010 Responder: Webb 190. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.1 7.5.2 7/26/2010 Responder: Clark 191. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( (

204 7.5.1.1 7.5.2 7/26/2010 Responder: Costley/Norman 192. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL M M M M ( M M 205 7/26/2010 Responder: Clark 193. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 7/27/2010 Responder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL C C C C 207 July 27, 2010 Date: 195. Y Closed Closed a a a a G a a 208 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 196. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 197. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a 210 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 198. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1 7/27/2010 Responder: Clark 199. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

214 7/27/2010 Responder: WEC 200. Y Closed Closed EICB RAI TVA Letter dated

( ( (

215 7/29/2010 Responder: WEC 201. Y Closed Closed 216 7.5.1.1 7.5.2 7/29/2010 Responder: Clark 202. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217 7/6/2010 Responder: Clark 203. Y Close Closed EICB RAI TVA Letter dated

( ( ( (

218 7/6/2010 Responder: Clark 204. Y Closed Closed EICB RAI TVA Letter dated 219 8/4/2010 Responder: TVA Licensing 205. Y Closed Closed EICB RAI

( ( M ( ( M ( ( ( ( M 220 8/4/2010 Responder: Ayala 206. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 8/4/2010 Responder: Trelease 207. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL C C C P 222 8/4/2010 Responder: Clark 208. Y Close Closed EICB RAI TVA Letter dated 223 8/4/2010 Responder: Clark 209. Y Closed Closed EICB RAI G G a G G a G G G G a 224 7.5.1.1 7.5.2 8/4/2010 Responder: Norman (TVA CEG) 210. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225 8/4/2010 Responder: Scansen 211. Y Close Closed EICB RAI TVA Letter dated a a a o 226 8/4/2010 Responder: TVA Licensing 212. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

227 8/4/2010 Responder: Clark 213. Y Close Closed EICB RAI TVA Letter dated 228 8/4/2010 Responder: Clark 214. Y Closed Closed EICB RAI TVA Letter dated 229 8/4/2010 Responder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 230 ( ( 8/4/2010 Responder: Webb 216. Y Closed Closed EICB RAI TVA Letter dated G C a 217. Y 231 8/4/2010 Responder: Clark Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

232 8/4/2010 Responder: Clark 218. Y Closed Closed RAI No. 5 TVA Letter dated 233 8/4/2010 Responder: Clark 219. Y Closed Closed EICB RAI TVA Letter dated

( ( (

234 8/4/2010 Responder: 220. Y Closed Closed N/A - Duplicate N/A C C C C C S 235 8/4/2010 Responder: TVA Licensing 221. Y Closed Closed N/A N/A 236 8/4/2010 Responder: Clark 222. Y Close Closed EICB RAI TVA Letter dated G G G 237 8/4/2010 Responder: Clark 223. Y Closed Closed EICB RAI TVA Letter dated a a a a a i 238 8/4/2010 Responder: Webb/Hilmes 224. Y Closed Closed N/A - Duplicate N/A 239 8/4/2010 Responder: Hilmes 225. Y Closed Closed N/A - Meeting N/A 240 8/4/2010 Responder: Clark 226. Y Close Closed Ml102910008 TVA Letter dated

( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (

241 8/4/2010 Responder: Davies 227. Y Closed Closed RAI No. 10 TVA Letter dated 242 8/4/2010 Responder: Hilmes 228. Y Close Closed EICB RAI TVA Letter dated 243 8/3/2010 Responder: WEC 229. Y Closed Closed N/A - Closed to N/A 247 8/8/2010 Responder: WEC 230. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4,

(

248 8/8/2010 Responder: WEC 231. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, 249 8/8/2010 Responder: WEC 232. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 253 8/8/2010 Responder: Clark 233. Y Closed Closed TVA Letter dated Related to Open Item no. 83.

254 8/10/2010 Responder: WEC 234. Y Closed Closed N/A - Request to TVA Letter dated C C C C C C C C C C C C C C C C C C C C S 255 8/10/2010 Responder: WEC 235. Y Closed Closed N/A - Request to TVA Letter dated 256 8/10/2010 Responder: WEC 236. Y Closed Closed N/A - Request to TVA Letter dated 257 8/10/2010 Responder: WEC 237. Y Closed Closed N/A - Request to N/A G

258 8/10/2010 Responder: WEC 238. Y Closed Closed N/A - Request to N/A 259 8/10/2010 Responder: WEC 239. Y Closed Closed N/A - Request to TVA Letter dated 260 8/10/2010 Responder: WEC 240. Y Closed Closed N/A - Request to N/A 261 8/10/2010 Responder: WEC 241. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

a a a a a a a a a a a a a a a a a a a a i 262 8/10/2010 Responder: WEC 242. Y Closed Closed N/A - Request to N/A 263 8/11/2010 Responder: WEC 243. Y Closed Closed ML101650255, Item 264 8/11/2010 Responder: WEC 244. Y Closed Closed ML101650255, Item 265 8/11/2010 Responder: WEC 245. Y Closed Closed ML101650255, Item 266 8/11/2010 Responder: Webb/Webber 246. Y Closed Closed TVA Letter dated 267 8/11/2010 Responder: WEC 247. Y Closed Closed 268 8/19/2010 Responder: WEC 248. N Closed Closed

( ( (

269 8/20/2010 Responder: NRC 249. Y Closed Closed N/A N/A

( ( (

270 8/23/2010 Responder: Clark 250. Y Closed Closed See also Open Item Nod. 41 & 245.

271 M M M 8/23/2010 Responder: WEC 251. Y Closed Closed N/A - Closed to NA 272 7.5.2.1 7.5.1 C C P 8/26/2010 Responder: Clark 252. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a a o 273 7.5.2.1 7.5.1 8/26/2010 Responder: Clark 253. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.a 7.5.2.1 7.5.1 8/26/2010 Responder: Clark 254. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

(

274.b 8/26/2010 Responder: Stockton 255. Y Closed Closed RAI No. 6 TVA Letter dated S

i 275 ( 8/27/2010 Responder: Clark 256. Y Closed Closed Not Required N/A

( (

276 7.6 7.6 S 8/27/2010 Responder: Webb 257. Y Closed Closed EICB RAI TVA Letter dated G G i 258. Y 277 7.6 7.6.3 8/27/2010 Responder: Clark Close Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

(

278 7.6 7.6.6 8/27/2010 Responder: Trelease 259. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 8/27/2010 Responder: Mather 260. Y Close Closed EICB RAI TVA Letter dated D

280 7.6 7.6.6 ( ( ( ( 8/27/2010 Responder: Trelease 261. Y Closed Closed EICB RAI TVA Letter dated a

282 7.6 7.6.9 G G G G 8/27/2010 Responder: Trelease 262. Y Close Closed EICB RAI TVA Letter dated r

283 7.7.5 XX 8/27/2010 Responder: Clark 263. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item

(

284 7.7.3 7.4.1 8/27/2010 Responder: Webber 264. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item D

a r

(

285 7.3.3 7.3 8/27/2010 Responder: McNeil 265. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item D

a r

(

286 7.7.3 9.3.4.2. 8/27/2010 Responder: Webber 266. Y Closed Closed EICB RAI No.16 TVA Letter dated D

a r

( 267. Y 287 7.3 7.3-1 ( D 8/27/2010 Responder: Elton Closed Closed ML102390538, Item Response G a r 268. Y 288 7.3 9/2/2010 Responder: McNeil Closed Closed EICB RAI

(

289 9/2/2010 Responder: Faulkner 269. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 ( 9/7/2010 Responder: Clark 270. Y Closed Closed N/A N/A This item is a duplicate of item 291.

D ( ( ( 271. Y M (

291 7.7 9/7/2010 Responder: Clark Closed Closed TVA Letter dated 292 7.2.5 7.2 a C C S 9/7/2010 Responder: Craig 272. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3. a G 9/8/2010 Responder: Craig 273. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL r a a i 294 7.3 7.3.1.1. 9/9/2010 Responder: Elton 274. Y Closed Closed ML102390538, Item Response

(

295 7.3 7.3.1.1. 9/9/2010 Responder: Elton 275. Y Closed Closed ML102390538, Item Response D

a r

(

296 7.3 7.3.1.2. 9/9/2010 Responder: Elton 276. Y Closed Closed ML102390538, Item Response D

a r

297 7.3 7.3.1.2. ( ( 9/9/2010 Responder: Elton 277. Y Closed Closed ML102390538, Item Response

( D D 298 7.3 XX C a a 9/9/2010 Responder: Clark 278. Y Closed Closed ML102390538, Item Response a r r 279. Y 299 Provide Common Q Software Requirements Specification Post Attachment 41 of the 10/5 letter contains the Common Q Closed Closed TVA Letter dated

(

300 Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 280. Y Closed Closed RAI No. 25 TVA Letter S

i

(

301 1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 281. Y Closed Closed RAI No. 11 TVA Letter dated Note 1:

302 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 282. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( (

303 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 283. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 284. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL D (

305 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 285. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( ( ( ( ( M M M M 306 7.1 7.1 FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 286. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1 (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 287. Y Closed Closed EICB RAI TVA Letter dated a S 308 7.1 7.1 (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 288. Y Closed Closed EICB RAI TVA Letter dated G G G G G G G a a a a 309 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 289. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 290. Y Closed Closed EICB RAI TVA Letter dated r i 311 7.1 7.1 Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 291. Y Closed Closed EICB RAI TVA Letter dated 312 7.0 By letter dated September 10,2010, TVA provided the summary Responder: Stockton 292. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 293. Y Closed Closed EICB RAI No.18 TVA Letter dated

( 294. Y 314 7.3 7.3 ( D The following 50.59 changes were listed in the March 12 RAI Responder: Stockton Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 G a r 295. Y 315 7.5.3 7.5.3 IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) Close Closed EICB RAI TVA Letter dated

(

316 7.5.2.3 7.5 TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 296. Y Closed Closed RAI No. 26 S

i

(

317 7.5.2.3 7.5 TVA has provided a proprietary and a non-proprietary version of Responder: Temples 297. Y Closed Closed RAI No. 27 TVA Letter dated S

i

(

319 7.5.2.3 7.5 TVA provided System Verification Test Results 04507007-1TR Responder: Temples 298. Y Closed Closed RAI No. 29 TVA Letter dated S

i E

320 I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 299. Y Closed Closed N/A N/A Duplicate of item 156 321 ( E For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 300. Y Closed Closed N/A N/A Duplicate of OI# 157 C I a 301. Y 322 7.7.1.11 Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark Closed Closed

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N B 302. Y 324 (

G

(

M Per the NRC reviewer, the BISI calculation is not required to be Closed Closed a a 325 The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson 303. Y Closed Closed Closed to open item ?

B 326 TVA uses double-sided methodology for as-found and as-left Responder: Webb 304. Y Closed Closed TVA Letter dated

(

G a

(

328 7.5.2.3 7.5 Provide the model number for the four containment high range Responder: Temples 305. Y Closed Closed RAI No. 30 TVA Letter dated S

i

( 306. Y 329 7.6.1 7.6.7 D ( Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark Closed Closed RAI No. 1 TVA Letter dated a S r i 307. Y 330 7.3 7.3 Related to Item 298 Responder: Hilmes/Faulkner Closed Closed EICB RAI No.20 Item 7, TVA letter 331 7.6.1 7.6.7 ( ( As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 308. Y Closed Closed RAI No. 8 TVA Letter dated Follow-up of OI-190.

(

M M 332 7.5.2.1 7.5.1 S 10/26/2010 309. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL a a i 310. Y 333 7.5.2.1 7.5.1 10/27/2010 Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL

(

336 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 311. Y Closed Closed S

i

(

337 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 312. Y Closed Closed S

i

(

342 7.5.2.3 7.5 Please confirm that RM-1000 monitors and the associated The RM-1000 containment high range radiation monitors are 313. Y Closed Closed S

i

(

343 7.5.2.3 7.5 Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 314. Y Closed Closed S

i 068 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 1. N Open Open-NRC Review N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688, was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was The following status is from the revised WB2 Common Q Response included in letter NNC 2/2/11: was opened to track September 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. Commercial grade comm8ittment Item 43: dedication will be made by applicant.

addressed at the next

a. AI687, AI688 - Scheduled for September 28, 2010 This item is addressed in Rev. 2 audit. Summary of the Licensing Technical reports for AI687 &
b. Upgraded PC node box - Per Westinghouse letter WBT- Report AI688 were docketed D-2024 (Reference 7), this item is available for audit at the one month late.

Westinghouse Rockville office.

c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:

(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information Requests, (Reference 5):

a. EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Requirements, dated September 10, 2010

b. EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &

AI688 Modules for use in Common Q PAMS, dated September 10, 2010

c. CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI- 4057, Revision 4, Commercial Dedication Instruction
b. EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
c. Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
d. EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter Assemblies 082 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 6/18/10 2. N Open Open-NRC Review EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

EICB (Carte)

ML102910002 7/30/10 41, Item No. 3.

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. These components can be found in the Summary Revised response included in NNC 2/2/11: Item No. 10 0, Dated April 2010), in Section 2.3, lists hardware/software Qualification Report Of Hardware Testing For Common Q letter dated 12/22/10 Qualification of changes to the Common Q PAMS previously reviewed by the Applications, 00000-ICE-37764, Rev 3 and changes will be NRC. However the Common Q ISG-6 Compliance Matrix does not TWICE Qualification Status Report, WNAQR-00011-SSP Regulations require that the addressed at the next contain activities that address qualification of all changes Per Westinghouse letter WBT-D-2024, (Reference __) dated NRC review be based on audit. The description

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N specifically: June 9, 2010, these documents are available for audit at the docketed material. Awaiting for of the commercial Westinghouse Rockville Office. document to be docketed by grade dedication 2.c - CI527 AF100 Peripheral Component Interconnect (PCI) TVA. process in the CQ interface card TVA provided information by letter dated July 30, 2010 PAMS LTR Rev. 2

3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary (ML102160349) - See Enclosure 1 Item No. 7. NNC 8/9/10: per telephone should be updated to Product Maintenance/Improvements) conversation on 8/5/10, it is not include a non-4.a - PM646A Processor Module Revision 1 of the Licensing Technical Report provides clear how Westinghouse proprietary description 4.b - CI631 AF100 Communication Interface Module additional detail on the platform specific to WBN2 and Commercial Grade Dedication and to include a 4.e - DO620 Digital Output Card references to the evaluation documentation. Plans and Reports for Digital software example.

I&C. Westinghouse agree to Please provide sufficient detail regarding the changes for the NRC TVA Response to Follow-up NRC Request: present to the NRC in a public to independently evaluate the acceptability of the changes. meeting on August 17, 2010, Please see the response to Request for Additional and explanation of how their Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix system addresses regulatory Item 067. criteria for both commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.

NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.

101 4/12/2010 Responder: Slifer 3. Y Open Open-NRC Review N/A TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000, The documents, and affidavits for withholding for the listed Documents provided in letter Due 10/14/10 potential this will slip to 7/14.

Containment High Range Post Accident Radiation Monitor documents were submitted to the NRC on TVA letter to the dated 07/15/10 documents will be provided by June 30, 2010. NRC dated July 15, 2010. Confirm receipt.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR 138 By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC 4. N Open Open-NRC Review ML101650255, Item EICB (Carte) certain PAMS documentation has been completed. No. 2 This item is used to track all Commercial Grade Revised response included in NNC 2/2/11:

(a) The draft ISG6 states that a commercial grade dedication plan Dedication issues. letter dated 12/22/10 Commercial grade should be provided with an application for a Tier 2 review. dedication will be

a. WNA-LI-00058-WT-P, Revision 2, Post-Accident TVA agreed to include a addressed at the next By letter dated February 5, 2010, TVA stated that the commercial Monitoring System (PAMS) Licensing Technical Report description of the generic audit.

grade dedication plan was included in the Common Q Topical submitted in TVA Letter to NRC dated December 3, Westinghouse hardware Report Section 11, Commercial Grade Dedication Program. 2010, (Reference 1) contains the following changes to commercial grade dedication Section 11 includes a description of the Common Q Commercial address the NRC request: process in the PAMS licensing Grade Dedication Program, and states: A detailed review plan is technical report. (see developed for each Common Q hardware or software component Section 7, Commercial Grade Dedication Process has ML102920031 Item No 1) that requires commercial grade dedication. been revised to describe the general commercial grade dedication process for both hardware and software and TVA agreed to include (in the Please provide the commercial grade dedication plans for each uses a description of the AI687 dedication process as PAMS licensing technical report)

Common Q hardware or software component that has not been an example of how the process is applied. an evaluation of WBN2 critical

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N previously reviewed and approved by the NRC. characteristics for commercial As listed in Table 6-3. Westinghouse Watts Bar 2 Westinghouse hardware (b) The draft ISG6 states that a commercial grade dedication Common Q PAMS Documents at Westinghouse components against the generic report should be provided within 12 months of requested approval Rockville Office, the following commercial grade critical characteristics. (see for a Tier 2 review. dedication documents are available for NRC audit at the ML102920031 Item No 2)

Westinghouse Rockville office: (list included in letter)

(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade TVA agreed to include a Dedication Report for the QNX Operating System for Common Q b. It is TVAs understanding that the submittal of the description of the generic Applications. documents listed in (b.i) and (b.ii) is no longer required. Westinghouse software Rather, it was agreed, that the inclusion of a description commercial grade dedication (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial of the commercial grade dedication process in revision process in the PAMS licensing Dedication Report for QNX 4.25G for Common Q Applications. 2 of the Post-Accident Monitoring System (PAMS) technical report. (see Licensing Technical Report, WNA-LI-00058-WT-P, ML102920031 Item No 3) would be sufficient to address this request.

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 185 7/15/2010 Responder: WEC 5. N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item An emphasis is placed on the traceability of requirements in Steve Clark to look at how to combine traceability items. Response included in letter Due (1) 12/3/10 No. 17 Software Requirements Specifications in the SRP, in the dated 12/22/10. (2) 12/22/10 unmodified IEEE std 830-1993, and even more so given the Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172, audit. NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say point behind this open Each identifiable requirement in an SRS must be traceable TVA Response to Follow-up NRC Request: item was that TVA must backwards to the system requirements and the design bases or (1) See NRC Matrix Item 144 demonstrate that the regulatory requirements that is satisfies Also the NRC considers (2) There is no RTM for development of the individual origin of each that the SRS is the complete set of requirements used for the reusable software elements. As listed in item 15 of requirement in the design of the software, whether it is contained within one Table 6-1 Document Requirements of WNA-LI-00058- WEC requirements document or many. In order to evaluate an SRS against the WT-P, Revision 2, Post-Accident Monitoring System specification is known guidance in the SRP the staff needs access to all the (PAMS) Licensing Technical Report submitted in TVA and documented. TVA requirements. Letter to NRC, dated December 3, 2010, a RTM for stated that this implementation of the RSEDs (WNA-VR-00280-WBT) information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring for the WBN Unit 2 Common Q PAMS has been CQ PAMS LTR Rev. 2.

Systems Software Requirements Specification are various types developed. This document is available for NRC audit at (2) TVA also said it of Reusable Software Element. the Westinghouse Rockville office. would provide a RTM for the RSED These references are used in the body of the SRS, for example:

NNC 2/3/11: To be R5.3.14-2 [The Addressable Constants CRC error signal shall be addressed during next TRUE when any CAL CRC's respective ERROR terminal = TRUE audit.

(WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 212 7.5.2 7/27/2010 Responder: WEC 6. N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Application specific requirements for testing. This cannot be Response included in letter Due 12/22/10 No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system addressed in a topical report. Evaluation of how the dated 12/22/10.

design specification and software requirements specification hardware meets the regulatory requirements. To be addressed by contain information to address the "Design Report on Computer WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these WEC to provide the information and determine where the documents, and it is not clear how this is the case. information will be located.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5. IEEE-603 1991:

(2) Please describe how the information provided demonstrates 5.5 System Integrity. The safety systems shall be conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57. designed to accomplish their safety functions under the full range of applicable conditions enumerated in the design basis.

TVA Response: The applicable conditions and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Section 11, Contract Compliance Matrix items:

87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI 300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.

The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:

(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),

(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.

TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.

This may be accomplished in various ways; for example:

(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.

6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:

(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.

(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.

TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:

Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.

If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.

TVA Response: Common Q PAMS system reliability and failure modes are described in:

WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.

5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).

V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.

V&V, configuration management, and QA shall be

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N required when the test and calibration function is inherent to the computer that is part of the safety system.

V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.

Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.

The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.

If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:

Memory functionality and integrity tests (e.g.,

PROM checksum and RAM tests)

Computer system instruction set (e.g., calculation tests)

Computer peripheral hardware tests (e.g.,

watchdog timers and keyboards)

Computer architecture support hardware (e.g.,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N address lines and shared memory interfaces)

Communication link diagnostics (e.g., CRC checks)

Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.

When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:

a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.

TVA Response: No response required.

Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 250 8/8/2010 Responder: WEC 7. N Open Open-NRC Review LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software and documents that will be Westinghouse develops Software Release Reports/Records Revised response included in Due 12/22/10 information relied upon in the SE must created and placed under configuration control. The SCMP (e.g., and a Configuration Management Release Report. Describe letter dated 12/22/10 be docketed correspondence."

SPM Section 6, Software Configuration Management Plan) the documents and when they will be produced. Summarize 10/25/10 is a partial describes the implementation tasks that are to be carried out. The guidance on how to produce these records, focus on project Response included in letter response. Still waiting LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the specific requirements in SPM etc. dated 10/25/10. on Software Test Plan analysis that supports the change tasks in the SCMP have been carried out in their entirety. and all other testing requested should include technical Documentation should exist that shows that the configuration TVA Response to Follow-up NRC Request: documentation. information in sufficient detail to enable management tasks for that activity group have been successfully the NRC staff to make an independent accomplished. Please provide information that shows that the CM The following documentation shows that the configuration NNC 2/2/11: To be assessment regarding the acceptability tasks have been successfully accomplished for each life cycle management tasks for that activity group have been addressed during the of the proposal in terms of regulatory activity group. successfully accomplished. next audit. requirements and the protection of public health and safety."

1. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N address the NRC requests:

a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
2. WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

327 Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber 8. Y Open Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is Response Included in letter Due 11/24/10 31, 2011. no proprietary information contained in the 08F802403-SC- dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

281 7.6 7.6.8 8/27/2010 Responder: Webb 1. Y Open Open-TVA/Bechtel EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/29/10 For FSAR Section 7.6.8 in amendment 96, redline version has Attachment 5 contains the WBN Unit 2 FSAR markup for Response provided in letter Due 11/24/10 Item#65 Enclosure 1 Item completely rewritten this section of the FSAR, however, the staff is Section 7.6.8, Interlocks for RCS Pressure Control During dated 10/29/10 No. 16 not able to determine any changes made to the section. Explain Low Temperature Operation, showing what was changed Provide the basis for what changes have been made to this FSAR Section. between Amendments 95 and 96. the changes. Look at FSAR Amendment 101 did not Foxboro I/A impact.

TVA Response to Follow-up NRC Request: reflect the changes in 7.6.8 associated with implementation The interlock for the RCS Pressure Control for Unit 2 is of the DCS. Provide the basis implemented differently than Unit 1 implementation. There for acceptance to use Foxboro are no differences between Unit 1 and Unit 2 interlocks, I/A DCS inplace of analog operation of interlocks and operator interface for operation of instrumentation and relays.

the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these Additional clarification provided devices are identical. For Unit 2, once signals are processed during 1/20 telecom. Question by the Eagle 21 system, interlock implementation is by is how does the system conform software modules in the Foxboro I/A Distributed Control to IEEE 279 as described in System (DCS). Hardware outputs, generated in the DCS, 7.6.8.1.

operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.

TVA Response to Second Follow-up NRC Request:

The underlined text from FSAR Amendment 101 Section 7.6.8 reflects the installation of the Foxboro DCS.

7.6.8 Text from FSAR Amendment 101 The wide range temperature signals, as inputs to the Protection Sets I and II, continuously monitor RCS temperature conditions. In Protection Set I, the existing RCS

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N wide range temperature channels on RCS loops 1 and 2 provide inputs to the Eagle 21 digital process protection system. Eagle 21 provides isolated analog signals to the digital process control system. An auctioneer function selects the lowest temperature signal which is then used to calculate an acceptable reference pressure limit (PORV setpoint) considering the plants allowable pressure and temperature Protection Set III. The calculated reference pressure is compared to the actual RCS pressure monitored by the wide range pressure channel. The auctioneered temperature signal will annunciate a main control room (MCR) alarm whenever the measured temperature approaches, within a predetermined amount, the reference temperature for arming the system. Similarly, whenever the measured pressure approaches within a predetermined amount of the programmed setpoint, another MCR alarm will be generated.

When the measured RCS pressure is equal to or above the programmed setpoint (nominal values), a PORV open signal is initiated and a MCR alarm is actuated. A manually armed permissive allows this actuation signal to control the Train A PORV (PCV-68-340A). The manually armed permissive also serves to block a spurious PORV opening due to potential instrument failure whenever the RCS temperature is above the arming reference temperature.

The monitored generating station variables that generate the actuation signal for the Train B PORV (PCV-68-334) are processed in a similar manner. The RCS loops 3 and 4 wide range temperature signals and the RCS pressure signal are provided from Protection Set II. Therefore, the generating station variables used for the Train B PORV are derived from a protection set that is independent of the sets from which generating station variables used for the Train A PORV are derived. The wide range temperature auctioneer function and the programmed pressure setpoint calculation for the Train B PORV are performed in a different group of the digital process control system than those for the Train A PORV. Each of these control groups has a fault tolerant, redundant processor pair and redundant power supplies with different power sources.

FSAR Section 7.6.8.1 Analysis of Interlock describes the system conformance to IEEE-279. The design of the COMS as implemented in the Foxboro I/A system fully complies with FSAR section 7.6.8.1. Items (1) and (2) are implemented as part of the Eagle 21 modification. Item (3) is addressed by each processor pair having redundant power supplies with both being battery backed and ultimately backed by an ESF diesel generator.

318 7.5.2.3 7.5 TVA has provided the following documents for RM-1000 Responder: Temples 2. N Open Open-TVA/Bechtel RAI No. 28 TVA Letter dated equipment qualification: ML102980005 10/29/10, Encl 1 Revised response is included in Due 2/25/11 10/26/2010 Item 34, and TVA EICB (Singh)

(i) Qualification Test Report for RM-1000 Processor Module letter dated 12/22/10. letter 11/24/10, and Current-To-Frequency Converter 04508905-QR (i) Applicable to WBN Unit 2. 04508905-1QR is Response update Att. 2.

(January 2001) applicable only in regards to the RM-1000, with the Note check 04508905-1QR or required. It is clear that (ii) Qualification Test Report Supplement, RM-1000 Upgrades exception of re-qualification of certain RM-1000 QR. Staff version is QR only. 04508903-2SP and -

04508905-1SP (June 2006) equipment differences covered in the -1SP report. 3SP are not applicable.

(iii) Qualification Test Report Supplement, RM-1000 Upgrades The Current-to-Frequency (I-F) converter module Response is included in letter The response for

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 04508905-2SP (June 2008) qualifications in the base report and the -1SP report dated 10/29/10 applicability of (iv) Qualification Test Report Supplement, RM-1000 Upgrades are not applicable to the RM-1000s, and will be used 04508905-QR and -

04508905-3SP (May 2008) later as references in the WBN Unit 2 specific 1SP to RM-1000 and IF qualification reports. converter is not clear.

Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then (ii) Applicable to WBN Unit 2. Check page numbers of please clarify what those are. Appendix F (iii) Not applicable to WBN Unit 2 (missing/duplicate Supplement 3 was issued one month prior to supplement 2. pages).

Please explain the reason for the same. (iv) Not applicable to WBN Unit 2 Check applicability of Appendix C to RM1000 The 04508905-3SP report was prepared for another TVA instead of RM2300?

plant, as a monitor system-level report, where the system See items 336 and 337.

included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement All equipment reports were essentially worked concurrently, but the -2SP qualification reports document review/release process resulted in the release including supplements time difference.

2SP and 3SP have TVA Response to Follow-up NRC Request: been reviewed as vendor drawings for NOTE: The response for the current to frequency (I to F) WBN-2. Please explain converter in item 1 below is a reversal of the the reason for response previously provided in TVA to NRC letter applicability of one dated October 29, 2010 (Reference 22). General report and not the Atomics Electronic Systems Inc. (GA-ESI) notified other.

TVA of this change on December 8, 2010 (Reference 20). Further all TVA/Bechtel reviews seems to be (1) The applicability of the qualification reports from GA- dispositioned as Code ESI e-mail dated December 10, 2010 (Reference 19) is 4, Review not required.

as follows: Work may proceed.

The applicable reports

a. 04508905-QR Qualification Test Report for RM- should have been 1000 Processor Module and Current-to- reviewed prior to Frequency Converter is applicable to the WBN dispositioning them.

Unit 2 RM-1000 and I to F converter modules. Please explain the apparent lack of review

b. 04508905-1SP Supplement to Qualification Test of WBN-2 applicable Report for RM-1000 Processor Module and documents. Was Current-to-Frequency Converter is applicable to appropriate review the WBN Unit 2 RM-1000 module. guidance used?
c. 04508905-1SP is not applicable to the WBN Unit Further update required 2 I to F converter module.

Provide model

d. 04508905-2SP Qualification Test Report number/part number for Supplement, I-F Converter Upgrades is the RM-1000 and I/F applicable to the WBN Unit 2 I to F converter converter used for module. WBN-2. This information is needed GA-ESI provided two other reports required to support to verify that the model qualification of the containment high range radiation or part number used is monitors. The report descriptions are from GA-ESI e-the equipment that has mail on December 8, 2010 (Reference 20). The been qualified for WBN-reports are:

2.

e. GA-ESI report 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit Provide qualification 2 Replacement Radiation Monitors: The report is reports 04038903-QSR and 04038903-7SP by

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N the principle report and the starting point for all the dues date of the radiation monitors provided as part of the 1/22/11.

replacement contract. The report describes each monitor; referenced to the technical manual for Submit a copy of any the physical and functional description and lists other relevant reviewed the major components of the monitor system. versions of the Report section 3 identifies the TVA Watts Bar Unit qualification reports.

2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements Submit copies of the for each monitor. In section 4 a brief description reviewed reports for of GA-ESI generic qualification programs for all 04508905-QR, radiation monitoring equipment in each of the four 04508905-1SP, above areas is provided. The qualification basis 04508905-2SP.

for each monitor is provided in a separate supplement to the principle report and is identified Clarification of in section 5. applicability of existing reports is acceptable.

f. GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -

273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.

(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).

Please see Item 1, above, for applicability of the other reports.

(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.

04508905-QR report has been reviewed by TVA. The

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N review of the remaining reports is ongoing.

(6) See item 5.

338 7.5.2.3 7.5 In page 3-15 and appendix B of Qualification Test Report Responder: Civil EQB 3. N Open Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown Due: 2/25/11 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that EICB (Singh) are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).

Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.

339 7.5.2.3 7.5 In the Qualification Test Report 04508905-QR, the licensee Responder: Bob Brown 4. N Open Open-TVA/Bechtel provided only eight Safe Shutdown Earthquake (SSE) Test EICB Response Spectra (TRS) as mentioned in the previous open item Due: 2/25/11 (Singh) (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.

340 7.5.2.3 7.5 Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA 5. Y Open Open-TVA/Bechtel (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents The following responses are based on e-mail: GA-ESI to Response included in letter Provide the qual reports used as the source for ENV 50140, ENV 55011 Class A, and EN Bechtel, dated December 8, 2010 (Reference 20), dated 12/22/10. by 1/28/11 per TVA 55022 Class B. letter of 12/22/10.

(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA- Due: 2/25/11 ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.

Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC EICB (Singh) qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.

(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:

a. ENV 50140 - Electromagnetic Compatibility -

Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test

b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

c. EN 55022 - Information technology equipment -

Radio disturbance characteristics - Limits and methods of measurement 341 7.5.2.3 7.5 FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters 6. Y Open Open-TVA/Bechtel these tables do not list the containment high range radiation 3.10, 11 and 12 was performed. The reviewer was unable to monitors. Please add them to the appropriate FSAR table(s) or locate seismic qualification information for the radiation Will be closed on justify why they should not be included in the FSAR 3.10 series of monitoring system in those chapters. A review of chapter update of FSAR 3.10 EICB (Singh) tables. 3.11 confirmed that radiation monitoring is included in the series tables.

environmentally qualified systems.

It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.

344 7.6.6  ? Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout. The requested information is contained in FSAR Amendment 7. N Open Open-TVA/Bechtel There is no section in FSAR which provides discussion on this 102 as follows:

subject. SE section discusses compliance with PSB-18. Provide a ICSB-18 provides guidance on discussion which can be used by the staff to determine similar 7.6.2.1 Description application of the single failure conclusion as Unit 1 and if the design is similar to Unit 1 then make criterion to manually controlled a statement to that effect. Also provide the list of the valves where 5th paragraph: The motor-operated bypass valves are electrically operated valves..

power lockout during normal reactor operation is utilized for valves located in bypass lines paralleling the normal RHR suction According to this BTP, whose inadvertent operation could affect plant safety. isolation valves FCV 74-1 and FCV 74-2 which are in series electrically operated valves in the flowpath. Valves FCV 74-8 and FCV 74-9 are normally includes MOV, SOV and those closed and remain closed with power locked out unless one valves operated indirectly by an of the two main isolation valves (FCV 74-1 or FCV 74-2) electrical device, e.g.an air Eicg(Garg) cannot be opened and the plant must be cooled down. operatd valves whose air supply is controlled by an electrical And: solenoid valves. FSAR Section 7.6.6 addresses only MOVs. If 7.6.6 Spurious Actuation Protection for Motor Operated TVA has done an analysis to Valves demonstrate compliance with the guidance of this BTP for Unit To the best of TVAs knowledge, the information contained in 1 and this analysis does not the FSAR is complete and accurate as of February, 2, 2011. change for Unit 2 for other valves than TVA shouls make a statement to that effect. If there are changes to the analysis then justify those changes based on this BTP.

345 7.5.2.3 7.5 Provide the normal temperatures and expected periods of high/low RM-1000 in a NIM Bin was Tested at 39°F for 72 Hrs and 8. N Open Open-TVA/Bechtel temperature excursions to assess aging requirements. TVA to Tested at 131°F for 72 Hrs per Section 4.2.6 of 04508905-further clarify if 86ºF for 40 years was used as the qualification QR. This is stated in document 04038903-7SP, Section 2.1. Due: 2/25/11 EICB (Singh) requirement for aging tests. This has been stated in some of the The ambient temperature used for aging was 86°F(30°C).

subsections under section 4.2 of the 04508905-QR report but the The NIM Bin has perforated holes in top and bottom covers rationale for using 86ºF (includes an internal temperature rise of and has an average internal temperate rise of approximately 18ºF) for 40 years has not been justified in the 04508905-QR 18 °F due to natural air convection. So the average internal report or the supplement reports. TVA to provide the rationale for temperature used for aging was 104°F (40°C).

this acceptance criteria for WBN-2.

Response is incomplete. Awaiting further input from GA.

346 7.5.2.3 7.5 TVA has previously stated in response to open item 319 that RM- Document 04507007-1TR is only the RM-1000 System 9. N Open Open-TVA/Bechtel 1000 System Verification Test Results report, 04507007-1TR is not Verification Test Results. Additional test results are EICB (Singh) applicable to WBN-2. However, TVA has not provided a WBN-2 summarized in the following documents: 04508905-QR, Due: 2/25/11 specific test results report. Please identify and provide the 04508905-1SP, and 04508905-2SP.

appropriate test results reports to complete the review. The proposed response Response is incomplete. Awaiting further input from GA. appears to be conflicting with the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N proposed response for OI-351 regarding not submitting the 04508905-QR report.

TVA to re-assess proposed response for both OIs.

347 7.5.2.3 7.5 Qualification report 04508905-1SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 10. N Open Open-TVA/Bechtel EICB (Singh) qualification for the new RM-1000 modules. TVA to provide the 04034101-001 (2-RE-90-271, -272, -273, & -274), addresses updated qualification or explain the basis for not addressing the the EMI/RFI qualifications for the entire loop including the Due: 2/25/11 EMI/RFI qualification. RM-1000 & I/F converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in 04038903-7SP.

348 7.5.2.3 7.5 Qualification report 04508905-2SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 11. N Open Open-TVA/Bechtel EICB (Singh) qualification for the new I/F converters. TVA to provide the 04034101-001 (2-RE-90-271, -272, -273, & -274), addresses updated qualification or explain the basis for not addressing the the EMI/RFI qualifications for the entire loop including the Due: 2/25/11 EMI/RFI qualification. RM-1000 & I/F converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in 04038903-7SP.

349 7.5.2.3 7.5 Radiation testing was not considered in any of the test reports as In response to a question about Common Q PAMS 12. N Open Open-TVA/Bechtel all the equipment has been assumed to be located in nuclear equipment qualification, TVA re-evaluated the Control and power plant areas with mild environments and radiation dosages Aux Instrument Room TID and concluded it to be less than Due: 2/25/11 less than 1 x 103 rads for total integrated dose (TID). However, 1x103 RAD.

the radiation monitors and the I/F converters are located in the TVA to provide the main control room which is defined as mild environment. For assessment document WBN-2 mild environment is defined as room or building zone or a suumary of the EICB (Singh) where (1) the temperature, pressure, or relative humidity resulting document with the from the direct effects of a design basis event (DBE) (e.g., reference to the temperature rise due to steam release) are no more severe than appropriate those which would occur during an abnormal plant operational document/documents.

condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 104 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2.

350 7.5.2.3 7.5 The seismic required response spectra (RRS) is shown in Figures RM-1000 in a NIM Bin was Seismically Tested and the 13. N Open Open-TVA/Bechtel 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra fully envelopes the RRS of actual test response spectra are shown in Figures 4-5 and 4-6 of CEB-SS-5.10 Rev. 3, Figure 3-1 as shown in Figures 3-4 Due: 2/25/11 EICB (Singh) 04508905-QR report. The actual test response spectra does not and 3-5 of 04038903-7SP.

seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the Response is incomplete. Awaiting further input from GA.

RRS and the actual test response spectra. The seismic qualification issue is open till further clarification is received from TVA.

351 7.5.2.3 7.5 The replacement schedule for the components that have a After further review, it was determined that 04508905-QR is 14. N Open Open-TVA/Bechtel qualified life of less than 40 years is noted in Table 6-1 of the a historical document and should not have been submitted supplemental qualification report 04508905-1SP. It is not clear if as part of the WBN Unit 2 licensing documents. Due: 2/25/11 EICB (Singh) the components identified for replacement in this report are the only components or if the components which are in addition to the The replacement schedules stated in 04508905-1SP and Reports 04508905-1SP components previously identified in qualification report 04508905-04508905-2SP should be used. 04508905-2SP states in and -2SP both refer to QR. Section 6: None of the Current-to-Frequency converter 04508905-QR as the modules qualified by this supplement contain parts that have parent document in Are there any age sensitive components for the I/F converter used significant age related failure mechanisms. section 4.1. Also see for WBN-2? (Note: Report 04508905-2SP does not state any age staff comment on OI-

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N sensitive components that require replacement during the qualified 346.

life).

352 7.5.2.3 7.5 Please calrify how many RM-1000 radaition monitors are being The total number of RM-1000 units procured under MR 15. Y Open Open-TVA/Bechtel procured for WBN-2, is the quantity 2 or four. MR 25402-011- 25402-011-MRA-HARA-00002 is four. The MR on line item EICB (Singh)

MRA-HARA-00002, R4 under Item 1.6 indicates that the quantity is 1.6 is stating the purchase of 2 sets of 2 RM-1000s & I/F Due: 2/25/11

2. If so, is WBN-2 using dual channel indication on each RM-1000 Converters making a total of 4 for each type of component.

unit. TVA to clarify. Will close on receipt of Each monitor utilizes a single channel display for the 2-RM- formal response.90-271 - 274 monitors.

334 7 7 FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 1. Y Open Open-TVA/Licensing RAI not required. N/A RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves. not part of any SE section.

EICB (Darbali)

Please correct this in a future FSAR amendment. Figure will be corrected in FSAR Amendment 103.

Update:

Please fix symbols for Gate Valve, Globe Valve and Float operated valve.

092 5/20/2010 Responder: Hilmes 1. Y Open Open-TVA/Oversight Continuous review as items are added DORL (Poole) TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this Due: SER Issue are proprietary. document as a communications tool.

323 WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1 2. Y Open Open-TVA/Oversight TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An 10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to Response is included in letter Due: 2/25/11 Enclosure 1 Item to the NRC by November 15, 2010 Revision 2 Change Analysis. dated 10/29/10 No. 36 EICB(Garg)

Steve Hilmes took The staff is confused with the action to resolve with response since both units have Unit 1.

reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 041 7.5.2 7.5.1 2/19/2010 Responder: WEC 1. N Open Open-TVA/WEC NRC Meeting TVA Letter dated See also Open Item Nos. 226 & 270.

EICB (Carte)

Summary NRC 6/18/10 Please provide the following Westinghouse documents: Items (1) and (2) were docketed by TVA letter dated April 8, Final Response included in NNC 1/27/11: Issues Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements 2010. letter dated 12/3/10 with the STP were ML093560019, Item TVA Letter dated Specification" discussed in the weekly No. 11 10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Item (3) will be addressed by Revision 2 of the Licensing Partial Response is included in public meetings.

Specification" Technical Report. Due 12/3/10 letter dated 10/5/10. Westinghouse to:

(3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" The SysRS and SRS (1) perfrom STP self Please provide the following Westinghouse documents or pointers Item (4) will be addressed by Westinghouse developing a incorporate requirements from assessment., and to where the material was reviewed and approved in the CQ TR or WBN2 Specific Test Plan to compensate for the fact that the many other documents by (2) Augment Test SPM: NRC disapproved WNA-PT-00058-GEN during the original reference. Summary report to (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Common Q review. Due 12/7/10 provide missing test Safety systems" NNC 8/25/10: (3) An earlier plan information (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Item (5) Procedures that are listed in the SPM compliance version of this report was Procedure" table in the Licensing Technical Report revision 1 supersede docketed for the Common Q NNC 2/3/11: At next that test procedure WNA-TP-00357-GEN.Due 10/22/10 topical report; therefore, there audit compare &

should be no problem to docket discuss:

For Item 3, Attachment 19 contains the Westinghouse this version. (4) Per (1) WNA-PT-00058-document Post-Accident Monitoring System (PAMS) ML091560352, the testing GEN Rev. 0 Licensing Technical Report, WNA-LI-00058-WBT, Revision process document does not (2) WNA-PT-00138-2, dated December 2010. Attachment 20 contains the address the test plan WBT Rev. 0 Westinghouse Application for Withholding for the Post- requirements of the SPM. (3) AP1000 STP Accident Monitoring System (PAMS) Licensing Technical Please provide a test plan that Report, WNA-LI-00058-WBT, Revision 2, dated December implements the requirements of 2010. the SPM.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

043 7.5.2 7.5.1 2/19/2010 Responder: WEC Date: 5/25/10 2. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)

ML102910002 2/5/10 compliance matrix was docketed on: (1)

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to The PAMS ISG6 compliance matrix supplied as Enclosure 1 Revised response included in NNC 2/2/11: Issues Item No. 2 February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the letter dated 12/22/10. with Common Q TR & TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed. SPM compliance were 5/12/10 expressed issued with all of these Response is included in letter discussed in the weekly compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a By letter dated April 8, 2010 TVA provided the PAMS dated 10/5/10. public meetings. TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not Licensing Technical Report provided additional information. Westinghouse to 6/18/10 evaluation.

approved in the associated SE. Westinghouse stated that this was Revised compliance matrix is perform Common Q TR the program and it could now be reviewed. The NRC stated that Attachment 3 contains the revised Common Q PAMS ISG-6 unacceptable. & SPM compliance self TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed Compliance Matrix, dated June 11, 2010, that addresses assessment; his will be 10/5/10 Rev. 1 Section 7 does not include the and approved. these items (Reference 13). NNC 8/12/10: It is not quite discussed in detail on RSED documents, and it should. Table enough to provide all of the the next audit. 6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA documents requested. There RSED RTMs.

but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 are two possible routes to SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as Compliance Matrix." review that the NRC can being SRP acceptance criteria for PAMS. undertake: (1) follow ISG6, and It is TVAs understanding that this comment is focused on (2) follow the CQ SPM. The Line 3: TVA identified that the Design report for computer integrity the fact that there are documents that NRC has requested TVA response that was was completed as part of the common Q topical report. The NRC that are currently listed as being available for audit at the originally pursued was to follow noted that this report is applicable for a system in a plant, and the Westinghouse offices. For those Common Q PAMS ISG6, but some of the CQ topical report did no specifically address this PAMS system at documents that are TVA deliverable documents from compliance items for ISG6 were Watts Bar Unit 2. Westinghouse, TVA has agreed to provide those to NRC. addressed by referencing the Westinghouse documents that are not deliverable to TVA will SPM. The NRC approved the NRC then concluded that TVA should go through and provide a be available for audit as stated above. Requirements CQ TR and associated SPM; it more complete and thorough compliance matrix. Traceability Matrix issues will be tracked under NRC RAI may be more appropriate to Matrix Items 142 (Software Requirements Specification) and review the WBN2 PAMS 145 (System Design Specification). Commercial Item application to for adherence to Dedication issues will be tracked under NRC RAI Matrix the SPM that to ISG6. In either Item 138. This item is considered closed. path chosen, the applicant should provide documents and a TVA Response to Follow-up NRC Request: justification for the acceptability of any deviation from the path WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring chosen. For example, it System (PAMS) Licensing Technical Report submitted in appears that the TVA Letter to NRC dated December 3, 2010, (Reference 1) Westinghouse's CDIs are contains the following changes to address the NRC commercial grade dedication requests: plans, but Westinghouse maintains that they are (1) While RSEDs are not specifically mentioned, Section 7 commercial grade dedication has been revised to be applicable to both hardware and reports; this apparent deviation software which includes the RSEDs. should be justified or explained.

(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD) 067 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 3. N Open Open-TVA/WEC N/A - No question TVA Letter dated EICB (Carte date for the "Commercial Grade Dedication Instructions for AI687, was asked. Item 6/18/10

)

AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q Response included in letter Due: 2/25/11 was opened to track

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. comm8ittment Item 43: made by applicant.

This item is addressed in Rev. 2 NNC 2/2/11: Section 7

a. AI687, AI688 - Scheduled for September 28, 2010 of the Licensing Technical of the WBN2 PAMS Report LTR should be updated
b. Upgraded PC node box and flat panel displays - Per to include:

Westinghouse letter WBT-D-2024 (Reference 7), these items (1) non-proprietary are available for audit at the Westinghouse Rockville office. description of commercial grade

c. Power supplies - Per Westinghouse letter WBT-D-2035 dedication, and (Reference 12), these items are available for audit at the (2) Software example Westinghouse Rockville office.

Commercial grade To be addressed during 9/20-9/21 audit dedication will also be addressed at the next TVA Response to Follow-up NRC Request: audit.

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

069 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 4. N Open Open-TVA/WEC N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Report" was October was asked. Item 2010. Awaiting for document to be Due 3/31/11 was opened to track docketed by TVA. comm8ittment As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be NNC 2/3/11: The made by applicant.

submitted. Instead a non-proprietary PAMS Test Summary Report current due dated will be submitted. above is 4 months later than planned.

074 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 5. N Open Open-TVA/WEC N/A - No question N/A Rev. 4 will be available for the NRC EICB (Carte) date for the Post FAT IV&V Phase Summary Report was was asked. Item audit on 2/28/11. This document will not November 30, 2010. TVA to provide due date. Due 4/15/11 was opened to track be submitted. Rev. 5 will be submitted commitment made after resolution of the datastorm display NNC 2/3/11: The by applicant. issue.

current due date above is 3 months later than planned.

081 7.5.2 7.5.1 5/6/2010 Responder: Merten/WEC 6. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 1/5/11: See Also Open Item No.

EICB (Carte)

ML102910002 6/18/10 86 and 202.

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The codes and standards documents listed in Section 7 of ML101600092 Item No.1: There Due 2/25/11 Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards the Common Q PAMS Licensing Technical Report are the are three sets of regulatory applicable to the Common Q PAMS. This list contains references documents that the Common Q platform was licensed to criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example: when the NRC approved the original topical report and Q application (e.g. WBN2 requested information.

(1) RG 1.29 - September 1978 vs. March 2007 issued the approved SER. The WBN Unit 2 Common Q PAMS):

(2) RG 1.53 - June 1973 vs. November 2003 PAMS is designed in accordance with the approved (a) Common Q platform NNC 2/3/11: The (a) IEEE 379-1994 vs. -2000 Common Q topical report and approved SER and the codes components - Common Q TR above due date has (3) RG 1.75 - September 1975 vs. February 2005 and standards on which the SER was based. Since the (b) Application Development been missed by at (a) IEEE 384-1992 vs. -1992 current versions referenced are not applicable to WBN Unit Processes - Common Q SPM least 2 months.

(4) RG 1.100 - June 1988 vs. September 2009 2, there is no basis for a comparison review. (c) Application Specific - current Please provide new (a) IEEE 344-1987 vs. -2004 regulatory criteria due date.

(5) RG 1.152 - January 1996 vs. January 2006 Bechtel to develop a matrix and work with Westinghouse to The Common Q Topical Report

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (a) IEEE 7-4.33.2-1993 vs. -2003 provide justification. and associated appendices (6) RG 1.168 - September 1997 vs. February 2004 primarily addressed (a) and (b).

(a) IEEE 1012-1986 vs. -1998 The Common Q SER states:

(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 Monitoring Systems, provides endorses 323-1974) the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review," conceptual design approach for states: "Design features and administrative programs that are upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the based on Common Q current staff positions." Please identify all differences between the components (page 58, Section versions referenced and the current staff positions. Please provide 4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these basis of the above review, the differences. staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.

603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

086 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 5/24/10 7. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 1/6/11: See Also Open Item No.81 EICB (Carte)

ML102910002 6/18/10 & 202 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The regulatory documents listed in the Common Q PAMS TVA to address with item OI Due 2/25/11 Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the Licensing Technical Report are the documents that the 81.

Common Q PAMS. This list contains references to old revisions of Common Q platform was licensed to when the NRC NNC 2/3/11: The several regulatory documents, for example: approved the original topical report and issued the approved above due date has (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 SER. The WBN Unit 2 Common Q PAMS is designed in been missed by at (ML083310185) accordance with the approved Common Q topical report and least 2 months.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N However, LIC-110, "Watts Bar Unit 2 License Application Review," approved SER and the regulatory documents on which the Please provide new states: "Design features and administrative programs that are SER was based. Since the current versions referenced are due date.

unique to Unit 2 should then be reviewed in accordance with the not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the comparison review.

versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these Rev 0 of the Licensing Technical Report references Rev. 1 of differences. ISG4 142 The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC 8. N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

SysRS would be IEEE 830 as endorsed by Regulatory Guide No. 6 Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - This item is used to track all traceability issues with the Response included in letter Due 2/25/11 (document Software Requirements Specifications. IEEE 830-1994 Section Software Requirements Specification (SRS). dated 12/22/10 submittals) TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear TVA/Westinghouse agreed to NNC 2/2/11: Updated Completion Program I&C Projects Post include the V&V evaluation of Specifications and Accident Monitoring System- System

1. How did TVA ensure the traceability of each requirement in TVA Response to 1: their reusable software element RTMs to be provided by Requirements Specification, dated the WBN2 PAMS SysRS. Traceability of requirements for the WBN Unit 2 Common Q development process in the TVA December 2009.

PAMS is ensured by: V&V design phase summary report. This evaluation would Tracability to be

a. Preparation of the TVA Contract Compliance Matrix include an evaluation against addressed during the contained in WNA-LI-00058-WBT-P, Revision 2, Post-the development process next audit.

Accident Monitoring System (PAMS) Licensing requirements. This evaluation Technical Report submitted in TVA Letter to NRC would also include an evaluation dated December 3, 2010 (Reference 1).

of how the WBN2 specific

b. Engineering review/comment/status of each revision requirements were addressed of:

by the reusable software

i. WNA-DS-01617-WBT, Post Accident elements. (see ML102920031 Monitoring System - System Requirements Item No 5)

Specification ii. WNA-DS-01667-WBT, Post Accident Monitoring System - System Design Specification (hardware) iii. WNA-SD-00239-WBT, Software Requirements Specification for the Post Accident Monitoring System (software)

TVA Response to 2:

2. Explain the source(s) of the requirements present in the Post As documented in the RTM, some software requirements Accident Monitoring Systems Software Requirements are taken from generic documents. The decision to include Specification. To clarify, many documents have generic software requirements was to reduce the overall requirements that are incorporated by reference into the scope for Common Q features that are unchanged across SRS, but what served to direct the author to include those projects. Westinghouse reviewed the generic PAMS various documents in the SRS or, if the requirement is based requirements and included those requirements that were on the System Requirements Specification, what directed the applicable to WBN Unit 2 PAMS.

author to include the requirement there?

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

3. Clarify whether the unnumbered paragraphs in the Post TVA Response to 3:

Accident Monitoring Systems Software Requirements Unnumbered paragraphs in the Post Accident Monitoring Specification, such as in the section headings, or are all such Systems Software Requirements Specification, such as in sections simply considered to be informative?

the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly Does the same apply to documents referenced by the SRS?

numbered.

Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by It depends on the document type. The statement would be reference in requirement R2.3-2 in the SRS.

true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for R2.3-2 [The PAMS software shall comply with the the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N requirements and guidelines defined in WCAP-16096-NP-A, not contain numbered requirements. The requirements Software Program Manual for Common Q Systems contained in this document are contained within the text of (reference 5).] the various sections.

If any requirements are expressed in such unnumbered Source: E-mail from Westinghouse (Matthew A. Shakun) to paragraph form instead of individually identified requirements, Bechtel (Mark S. Clark), RE: December 22 letter review, please list them, describe why they satisfy the fundamental dated December 17, 2010 (Reference 13) requirement of unambiguity, and describe how they were verified.

4. Are there any sources of requirements in parallel with the TVA Response to 4:

Post Accident Monitoring Systems Software Requirements The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 Specification? Meaning does the SRS contain, explicitly or contains references to other Westinghouse software by reference, all the requirements that were used in the requirements documents. Specifically, design phase for the application specific software, or do software design phase activities use requirements found in 00000-ICE-3238, Revision 5, Software Requirements any other source or document? If so, what are these Specification Post Accident Monitoring System sources or documents?

00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

5. References 12, 27, 29, and 31-44 in the Post Accident TVA Response to 5:

Monitoring Systems Software Requirements Specification Requirements for the reusable software elements (RSEDs) are various types of Reusable Software Element. are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, These references are used in the body of the SRS, for dated December 2010 (Attachment 10).

example:

RSED traceability is contained in WNA-VR-00280-WBT, R5.3.14-2 [The Addressable Constants CRC error signal Revision 2, Watts Bar 2 NSSS Completion Program I&C shall be TRUE when any CAL CRC's respective ERROR Projects Requirements Traceability Matrix for the Reactor terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Vessel Level Indication System (RVLIS) Custom PC Element Document CRC for Calibration Data" [Reference Elements. This document can be made available for audit 12]).] at the Westinghouse Rockville office.

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.

1. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.

TVA Response:

A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

4. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.

TVA Response:

Westinghouse has confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.

TVA Response:

Westinghouse confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.

Guide 1.172 and justify any deviations.

TVA Response:

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):

Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Standard 830-1998 And Regulatory Guide 1.172 has been added.

7. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

TVA Response:

The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.

TVA Response:

The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)

9. RTM item R4.2-2 protection class software set to 0.

Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.

TVA Response:

Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the ENABLE position.

TVA Response:

The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:

6.2 Manually Initiated Testing, 7.2.23 Annunciator Test Display, 7.2.25 Saturation Margin Test Display, and 7.2.26 Analog Output Test Display.

11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N TVA Response:

Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:

a. Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
b. SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
c. Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
i. Tables 7.2-1 Train A PAMS Data Transmitted to the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.

All other items in the SRS refer to the FE keyswitch.

ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE

d. WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
12) is not consistent in use of the term FE keyswitch as noted below:
i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.

ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch

e. Revision 2 of the Licensing Technical Report is not consistent in use of the term FE keyswitch as noted below:
i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)

The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.

12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N documents are used. Describe in 1.1 of the SysRS.

Need a good write up of how the process works.

TVA Response:

See response to letter item 13 (NRC Matrix Item 145).

13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:

The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).

14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

TVA Response:

The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.

15. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:

The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.

TVA Response:

When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.

TVA Response:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).

18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

TVA Response:

a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
b. The SDDs developed for this project are:
i. WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii. WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii. WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv. Other generic SDDs referenced by the PAMS project are:

(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5, Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions

c. Refer to WNA-VR-00279-WBT, Revision 3.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

19. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

TVA Response:

Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.

Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.

WCAP-15927 is on the AP1000 docket.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 143 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 9. N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

PAMS SRS - ML101050202) contains a table (see page iii) titled, No. 7 Specification Document Traceability & Compliance, which states that the Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. Response included in letter Due 2/25/11 (document WBN2 PAMS SRS was created to support the three documents A detailed explanation will be provided. dated 12/22/10 submittals) TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document TVA Response: To be addressed by Completion Program I&C Projects Post describes requirements for the major software components Revision of the RTM, Accident Monitoring System- System (a) and (b) The requested information is provided in the SRS, SysRS, and Requirements Specification, dated (a) Please list and describe each of the major software following documents: SysDS. December 2009.

components. Please include a description of any NRC review for i. WNA-LI-00058-WBT-P, Revision 2, Post-each of these components. Accident Monitoring System (PAMS) Licensing NNC 2/2/11: Updated Technical Report, Table 6-1, Document Specifications and (b) Please list and describe each of the other software Requirements which lists the software RTMs to be provided by components. Please include a description of any NRC review for documentation requirements for the Common Q TVA each of these components. PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to NNC 2/3/11: The (c) What other documents contain the requirements for the other NRC, dated December 3, 2010 (Reference 1). above due date has software components? ii. WNA-DS-01617-WBT-P, Revision 3, Post been missed by at Accident Monitoring System- System least 2 months.

The WBN2 PAMS System Design Specification (WBN2 PAMS Requirements Specification, dated December Please provide new SDS) contains a table (see page iii) titled, Document Traceability 2010 (Attachment 1) due date.

& Compliance, which states that the WBN2 PAMS SysRS was iii. WNA-SD-00239-WBT-P, Revision 3, Software created to support the WBN2 PAMS SysRS. Section 1.1, Requirements Specification for the Post Accident Purpose, of the WBN2 PAMS SDS states: The purpose of this Monitoring System, dated December 2010 document is to define the hardware design requirements (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, Watts Bar 2 (c) Do the WBN2 PAMS SRS and SDS, together, implement all of NSSS Completion Program I&C Projects the requirements in the WBN2 PAMS SysRS? Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC (e) Please briefly describe all of the documents that implement audit at the Westinghouse Rockville office) the WBN2 PAMS SysRS. To the best of TVAs knowledge, no prior NRC review of the software components has been performed.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

(d) No. Please see Item (e) below.

(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:

i. WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 144 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 10. N Open Open-TVA/WEC ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)

PAMS SRS) contains a table (see page iii) titled, Document No. 8 10/5/10 Specification Traceability & Compliance, which states that the WBN2 PAMS (a) The purpose of NABU-DP-00014-GEN document is to Revised response included in Due TBD - TVA to SRS was created to support the three documents identified (two of define the process for system level design, software design letter dated 12/22/10 provide a date By letter dated April 8, 2010 these documents have been provided on the docket). and implementation, and hardware design and (ML10101050203), TVA docketed implementation for Common Q safety system development. Response provided in letter Responses to items a WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014- This document supplements the Common Q SPM, WCAP- dated 10/5/10 and e provided. "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety 16096-NP-A. The scope of NABU-DP-00014-GEN includes Program I&C Projects, Software Systems). the design and implementation processes for the application NRC Review and WEC to NNC 11/18/10: Requirements Specification for the Post development. For a fuller description of the design process complete response. (1) Items b-d closed to Accident Monitoring System, dated (b) Please describe the flow of information between these three described in NABU-DP-00014-GEN please refer to the other Open Item nos. February 2010 (ML101050202).

documents. Design Process for AP1000 Common Q Safety Systems, b-d to be addressed at public (2) The point of these WCAP-15927 on the AP1000 docket. Since this is a meeting and audit. Will require questions was to (c) Does the PAMS SRS implement the requirements in these Westinghouse process document that is not specifically information to be docketed. understand how the three documents? referenced in the SRS, it will be removed in the next revision origin of the of the document. requirements in the (d) Please describe if and how these three documents are used in requirements the development of the PAMS Software Design Description. (b) - Closed to items 142 and 145 specifications were documented. TVA (e) Do the WBN2 V&V activities include verification that the (c) - Closed 142 stated that the origin of requirements of these three documents have been incorporated the requirements would into the WBN2 PAMS SRS. (d) - Closed to Item 142 be demonstrated in Rev. 2 of the CQ PAMS (e) WBN2 PAMS Software Requirements Specification LTR.

(WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has NNC 2/3/11: CQ three entries; Design Process for Common Q Safety PAMS LTR Rev. 2 Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar Section 11 & 12 do not 2 NSSS Completion Program I&C Projects Post Accident adequately Monitoring System - System Requirements Specification demonstrate the origin (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 of requirements in NSSS Completion Program I&C Projects Post Accident SysRS. TVA to Monitoring System - System Design Specification (WNA- describe how to DS-01667-WBT, Rev. 1). address concern.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems, is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.

145 The WBN2 PAMS System Design Specification (WBN2 PAMS Responder: WEC 11. N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Design EICB (Carte)

SDS) contains a table (see page iii) titled, Document Traceability No. 9 Specification

& Compliance, which states that the WBN2 PAMS SDS was (1) The review and update of the RTM is complete. The Response included in letter Due 2/22/11 created to support the WBN2 PAMS SysRS. revised RTM can be made available for NRC audit at dated 12/22/10 TVA docketed WNA-DS-01667-WBT the Westinghouse office in Rockville. To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware During the September 20-21, Revision of the RTM, Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS? (2) Please see letter Item 10 (NRC Matrix Item 142, sub 2010 audit at Westinghouse, it SRS, SysRS, and Accident Monitoring System- System item 13). was acknowledged that SysDS. Design Specification, dated December (b) Please briefly describe all of the documents that implement the TVA/Westinghouse had 2009.

hardware requirements of the WBN2 PAMS SysRS. (3) Please see letter Item 10 (NRC Matrix Item 142, sub previously (in September 15, item 12). 2010 public meeting) stated:

This item is used to track all traceability issues with the System Design Specification (SDS). (4) Section 11 TVA Contract Compliance Matrix was TVA would provide the RSED added to WNA-LI-00058-WBT-P, Revision 2, Post- RTM. (see ML102920031 Item At the September 15 public meeting in Rockville, the following Accident Monitoring System (PAMS) Licensing No 6) actions were agreed to. These items partially address the Technical Report submitted in TVA Letter to NRC traceability concerns with the System Design Specification. dated December 3, 2010, (Reference 1). TVA would revise and resubmit This item will be updated with the results of the September 20 the PAMS RTM to address all and 21 Commercial Grade Dedication and SDS RTM audit. (5) WNA-VR-00283-WBT, Revision 1, IV&V Summary types of issues identified in the Report for the Post Accident Monitoring System, public meeting. (see

1. Westinghouse will perform completed a review of the submitted in TVA to NRC letter dated December 3, ML102920031 Item No 7)

Requirements Traceability Matrix(RT), using the issues 2010 (Reference 1) includes the Requirements and identified at the 9/15 public meeting as a guide (documented Design phase reviews. TVA would revise and resubmit below) and update the RTM as required. the Software Verification and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (6) Per Westinghouse letter WBT-D-2268 NRC Access to Validation phase summary

2. Some hardware requirements are contained in the SRS Common Q Documents at the Westinghouse Rockville report for the requirements instead of the System Design Specification (SDS). These will Office dated August 16, 2010 (Reference 9) System phase to document the be removed from the SRS and incorporated into the next Requirements Specification for the Common Q Generic completion of the requirements revision of the SDS. Flat Panel Display, 00000-ICE-30155, Revision 9 is phase review. (see available for audit at the Westinghouse Rockville office. ML102920031 Item No 8)
3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the The generic AC160 specifications are contained in the revisions reviewed by V&V. Have these been addressed? documents listed below. The documents are available Yes. The next revisions of the SDS and SRS address these for NRC audit at the Westinghouse Rockville office in issues. accordance with the letter number referenced. List is contained in letter.
4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS (7) A schedule was developed and is reviewed weekly by design meets the contract requirements. Westinghouse and TVA project management.
5. The next issue of the IV&V report will include the (8) The revised document submittal schedule was Requirements phase review of the RTM and a partial review included as item 3 NRC Request (Matrix Item Number for the Design phase. 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.
6. Westinghouse to provide the generic AC160 and flat panel specifications. (9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team. Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated
8. The flow of information is from the SysRS to the SDS December 8, 2010 (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

183 7/15/2010 Responder: WEC 12. Y Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements The generic Software Requirements Specification applies Revised response included in Due TBD - TVA to No. 9 Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements letter dated 12/22/10. provide a date No. 4 and even more so given the modifications to the standard listed in Specification.

Regulatory Guide 1.172, which breaks with typical NRC use of the NNC 11/18/10: The word should to say Each identifiable requirement in an SRS TVA Response to Follow-up NRC Request: Response provided in letter point behind this open must be traceable backwards to the system requirements and the dated 10/21/10 item was that TVA must design bases or regulatory requirements that is satisfies Please see the response to RAI item 12 in letter dated demonstrate that the 12/222/10, NRC Matrix Item 144. origin of each On page 1-2 of the Post Accident Monitoring Systems Software requirement in the Requirements Specification in the background section, is the WEC requirements sentence Those sections of the above references that require specification is known modification from the generic PAMS are defined in the document and documented. TVA referring purely to the changes from WNA-DS-01617-WBT Post stated that this Accident Monitoring System-System Requirements Specification information would be in or is it saying that there are additional changes beyond those and CQ PAMS LTR Rev. 2.

that the SRS defines them?

NNC 2/3/11: CQ PMS If there are additional changes, what is their origin? LTR Rev. 2 Sections 11

& 12 do not prove this information. TVA to proive a plan to address requested information.

202 7.5.2 7/22/2010 Responder: WEC 13. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 1/5/11: See Also Open Item No.

EICB (Carte Response included in letter ML102980066 Item 10/5/10 81 and 86.

)

The letter (ML0003740165) which transmitted the Safety Revision 1 of the Licensing Technical Report will provide dated 12/22/10 to provide information No. 4

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Evaluation for the Common Q topical report to Westinghouse more detailed information on the changes to the platform. requested.

stated: "Should our criteria or regulations change so that our Partial Response provided in conclusions as to the acceptability of the report are invalidated, CE Rev. 2 of the Licensing Technical Report will include the letter dated 10/5/10 Due TBD Nuclear Power and/or the applicant referencing the topical report applicability of guidance.

will be expected to revise and resubmit their respective NNC 1/5/11: Summary provided documentation, or submit justification for continued applicability of TVA Response to Follow-up NRC Request: in Licensing Technical Report the topical report without revision of the respective WNA-LI-00058-WBT-P, Revision 2, Post-Accident R2 has been reviewed and documentation." Question No 81 identified many criteria changes; Monitoring System (PAMS) Licensing Technical Report found to be unacceptable.

please revise the respective documentation or submit justification (LTR) submitted in TVA Letter to NRC dated December 3, for continued applicability of the topical report. 2010, contains the following change to address the NRC LTR Section 9 evaluates the request: compliance of the SRS to IEEE 830-1998. There are two issues Section 9, Compliance Evaluation of the Watts Bar 2 PAMS with this evaluiation:

Software Requirements Specification to IEEE Standard 830- (1) IEEE 830-1998 is not the 1998 and Regulatory Guide 1.172 to show the origin of the current SRP acceptance criteria.

requirements has been added. IEEE 830-1998 has not been formally endorsed by a The descriptions and commitments in the Topical Report regulatory guide.

(TR) still apply. The LTR provides compliance evidence to (2) Westinghouse committed to the new ISG-04 criteria. The statement in the SE means that evaluate the SRS against 830 the TR can be evaluated against later NRC criteria when it when the NRC identified several appears. inconsistencies.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Yes ISG-4 is one new criteria, Bechtel (Mark S. Clark), RE: December 22 letter review, and an evaluation against it has dated December 17, 2010 been provided.

In addition, LTR Rev. 2 Section 13 states: The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1.

Reference 1 is the common Q topical report.

213 7.5.2 7/27/2010 Responder: WEC 14. N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Conformance with IEEE 603 is documented in the revised Response is included in letter Due TBD - TVA to No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system Common Q PAMS Licensing Technical Report and the dated 10/25/10 provide a date design specification and software requirements specification Common Q PAMS System Design Specification.

contain information to address the "Theory of Operation NNC to review and revise this NNC 2/3/11: The Description." The staff has reviewed these documents, and it is Attachment 1 contains the proprietary version of question after LTR R2 is identified not clear how this is the case. The docketed material does not Westinghouse document Tennessee Valley Authority received. documentation does appear to contain the design basis information that is required to (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring not include the design evaluate compliance with the Clause of IEEE 603. System (PAMS), Licensing Technical Report, Revision 1, bases. Please provide (1) Please provide the design basis (as described in IEEE 604 WNA-LI-00058-WBT-P, Dated October 2010 schedule for providing Clause 4) of the Common Q PAMS. the requested (2) Please provide a regulatory evaluation of how the PAMs Attachment 8 contains the proprietary version of information.

complies with the applicable regulatory requirements for the theory Westinghouse document Nuclear Automation Watts Bar 2 of operation. NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents DS-01667-WBT, Rev. 2 dated September 2010.

identified demonstrate compliance with this clause?

244 8/3/2010 Responder: WEC 15. N Open Open-TVA/WEC EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte ML102980066 Item provided in letter "Safety Evaluation" states: "the

)

Section 8.2.2 of the Common Q SPM (ML050350234) states that The process related requirements have been removed from Revised response is included in NNC 2/2/11: Issues No. 14 dated 10/25/10. information relied upon in the SE must

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N the Software Requirements Specification (SRS) shall be developed revision 2 of the Software Requirements Specification (SRS). letter dated 12/22/10 with Common Q TR & be docketed correspondence."

using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project SPM compliance were requirements in the SRS," of the IEEE 830 states that an SRS Attachment 3 of letter dated 10/25/10 contains the Response is provided in letter discussed in the weekly LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing proprietary version of Westinghouse document Nuclear dated 10/25/10. public meetings. analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any Automation, Watts Bar 2 NSSS Completion Program, I&C Westinghouse to requested should include technical alternatives to the SPM processes or additional project specific Projects, Software Requirements Specification for the Post NNC 11/18/10: SysRS Rev. 2 perform Common Q TR information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP. Accident Monitoring System, WNA-SD-00239-WBT, also contains process & SPM compliance self the NRC staff to make an independent Revision 2, Dated September 2010. requirements that are more assessment; this will be assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS appropriately incorporated into discussed in detail on of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, TVA Response to Follow-up NRC Request: process documentation. the next audit. requirements and the protection of for example all seventeen requirements in Section 2.3.2, As shown is the listed documents, process related public health and safety."

"Configuration Control," address process requirements for requirements have been deleted from the SRS and SysRS in configuration control. Revision 3:

Please explain how the above meets the intent of the approved Attachment 1 contains proprietary version of WNA-DS-SPM. 01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.

Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17) 245 8/3/2010 Responder: WEC 16. N Open Open-TVA/WEC EICB RAI LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the Response included in letter NNC 2/2/11: Issues No. 119 information relied upon in the SE must required test documentation for systems developed using the SPM compliance matrix dated 12/3/10 with the Common Q TR be docketed correspondence."

Common Q SPM. Please provide sufficient information for the & SPM were discussed NRC staff to independently assess whether the test plan for WBN2 Attachment 9 contains the Westinghouse document Post Common Q PAMS Test in the weekly public LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1). Accident Monitoring System Test Plan, WNA-PT-00138- Summary Report scheduled to meetings. analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10 be submitted March 29, 2011. Westinghouse to requested should include technical contains the Westinghouse Application for Withholding for perform Common Q TR information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT- & SPM compliance self the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010. assessment assessment regarding the acceptability of the proposal in terms of regulatory TVA Revised Response: requirements and the protection of public health and safety."

This is to be addressed in the non-proprietary Common Q PAMS Test Summary Report scheduled to be submitted March 29, 2011.

246 8/3/2010 Responder: WEC 17. N Open Open-TVA/WEC EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM As agreed ISG6 does not apply to the Common Q PAMS Response is provided in letter NNC 2/2/11: Issues No. 15 dated 10/25/10 information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be platform. The information required to address this question dated 10/25/10 with the Common Q TR be docketed correspondence."

developed. Many other section of the SPM identify that this PQP concerning the PQP and SPM has been added to & SPM were discussed should contain information required by ISG6. Please provide the compliance matrix in revision 1 of the Licensing Technical NNC 11/18/10: PQP has not in the weekly public LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced, Report. been provided and CQ PAMS meetings. analysis that supports the change please describe the documentation produced and provide the LTR Rev. 1 does not contain Westinghouse to requested should include technical information that the SPM states should be in the PQP. Attachment 1 of letter dated 10/25/10 contains the comparable information. perform Common Q TR information in sufficient detail to enable proprietary version of Westinghouse document Tennessee & SPM compliance self the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post- assessment assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October requirements and the protection of 2010 public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 251 8/8/2010 Responder: WEC 18. N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software testing and documents that will The software testing performed and documents created are Revised response included in NNC 2/2/11: Issues information relied upon in the SE must be created. The SPM also describes the testing tasks that are to addressed by the SPM Compliance matrix contained in letter dated 12/22/10 with the Common Q TR be docketed correspondence."

be carried out. The acceptance criterion for software test Revision 1 of the Licensing Technical Report. & SPM were discussed implementation is that the tasks in the SPM have been carried out Partial response is provided in in the weekly public LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that Attachment 1 of the letter dated 10/25/10 contains the letter dated 10/25/10 meetings. analysis that supports the change testing been successfully accomplished. Proprietary version of Westinghouses document titled: Westinghouse to requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2 perform Common Q TR information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS), & SPM compliance self the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058- assessment assessment regarding the acceptability WBT-P, Dated October 2010 of the proposal in terms of regulatory requirements and the protection of TVA Response to Follow-up NRC Request: public health and safety."

Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.

252 8/8/2010 Responder: WEC 19. N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM contain requirements for software requirements Explain response to AP1000 audit report. Response included in letter Due 2/25/11 (document information relied upon in the SE must traceability analysis and associated documentation (see Section RTM docketed NRC awaiting V&V evaluation of RTM. dated 12/22/10 submittals) be docketed correspondence."

5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability The following responses are based on WBN Unit 2 Common Read ML091560352 NNC 2/2/11: Updated LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished. Q PAMS traceability: RTMs and analysis that supports the change specifications to be requested should include technical Software requirements traceability analysis is described in provided. information in sufficient detail to enable the following documents: the NRC staff to make an independent Requirements assessment regarding the acceptability

1. WNA-LI-00058-WBT-P, Revision 2, Post-Accident traceability to be of the proposal in terms of regulatory Monitoring System (PAMS) Licensing Technical addressed during he requirements and the protection of Report submitted in TVA Letter to NRC dated next audit. public health and safety."

December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix

2. WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
3. WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.

The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:

1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF78F8.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N dated December 3, 2010 (Reference 1).

2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
3. The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010.

Attachment 11 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.

335 7.6.1 7.6.7 LPMS: Reference to OI-331, sub item 2. Responder: WEC 20. Y Open Open-TVA/WEC Provide analysis, test, or combined analysis and test for normal TVA has reviewed the information provided by Partial Response included in Submit qual report by operating radiation, temperature, and humidity environment per Westinghouse describing how the Loose Part Monitoring letter dated 12/22/10 3/11/11 as stated in EICB (Singh) regulatory position C.1.g of RG 1.133. As an alternate TVA may System (LPMS) sensor is qualified for normal operating TVA letter of 12/22/10, confirm that the required equipment has been qualified for the conditions provided in Westinghouse letter WBT-D-2782, Encl 1, Item 28.

environments stated in RG 1.133, position C.1.g and that TVA has dated December 17, 2010 (Reference 11) as addressed in reviewed the test report and found it acceptable. regulatory position C.1.g of Reg. Guide 1.133 and found it Due 12/22/10 acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011.