Information for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspections
ML100740678
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/15/2010
From: Robert Daley
Engineering Branch 3
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
IR-10-007
Download: ML100740678 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 15, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTIONS

Dear Mr. Pardee:

On April 26, 2010, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection will be performed in accordance with the NRC baseline Inspection Procedure IP 71111.17. The on-site portion of the inspection will take place on April 26 - 30, 2010, and May 10 - 14, 2010.

Experience has shown that these baseline inspections are resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. The first group is necessary to ensure that the inspection team is adequately prepared for the inspection.

This information should be made available via compact disc to the Regional Office no later than April 5, 2010. The inspection team will review this information and, by April 8, 2010, will request specific items that should be available for review by April 16, 2010. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents in Group II will be requested for review in the Regional Office prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, April 26, 2010. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our regulatory contact for this inspection is Mr. T. Petersen of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9717 or via e-mail at zelig.falevits@nrc.gov.

M. Pardee This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

Enclosure:

Modification and 50.59 Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: Distribution via ListServ

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Report: 05000254/2010007; and 05000265/2010007(DRS)

Inspection Dates: April 26 - 30, 2010 and May 10 - 14, 2010 Inspection Procedures: IP 71111- 17, Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications Lead Inspector: Zelig Falevits (630) 829-9717 I. Information Requested for In-Office Preparation Week The following information is requested by April 5, 2010, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by April 8, 2010. We will request that certain items be made available to the regional office prior to the inspection by April 16, 2010. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information for the last Permanent Modification inspection on November 15, 2007, to the present. If you have any questions regarding this information, please call the lead inspector as soon as possible.

(1) List of permanent plant modifications to systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set-point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.

(2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following:

1 Enclosure

INITIAL DOCUMENT REQUEST

a. Changes that have been made under the previsions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since November 22, 2007;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been issued.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4) List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.

(5) List of calculation changes that have been issued for use.

(6) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes.

These documents should also include corrective action documents associated with modification and MOD 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance, (7) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.

(8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

2 Enclosure

INITIAL DOCUMENT REQUEST (9) Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.

(10) Name(s) and phone numbers for the regulatory and technical contacts.

(11) Current management and engineering organizational chart.

II. Information Requested to be Available Prior to Inspection. Request will be made by April 8, 2010 for availability of documents by April 16, 2010 (Item (1) below) or on the first day of on-site inspection (April 26, 2010 for remaining Items).

(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations, or screenings, and any corrective action documents (need in Regional Office by April 16, 2010).

(2) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications;
g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The Latest 10 CFR 50.59 FSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:

a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

3 Enclosure

INITIAL DOCUMENT REQUEST (4) Assessment and Corrective Actions:

a. The most recent modification (MOD)/50.59 Quality Assurance (QA) audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.

III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

4 Enclosure

M. Pardee In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

Enclosure:

Modification and 50.59 Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMQuad Cities RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: Ltr 031210 QUAD CITIES MOD 50.59 2010 007 RFI ZXF.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME ZFalevits:ls RDaley DATE 03/15/10 03/15/10 OFFICIAL RECORD COPY