Category:E-Mail
MONTHYEARML24254A2082024-09-10010 September 2024 NRR E-mail Capture - Quad Cities, Unit Nos. 1 and 2 - Alternative to RV-08, Rev 1, SRV Testing Interval - Acceptance of Requested Licensing Action Re Relief Request Associated with Safety Relief Valve Testing Interval ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24197A0482024-07-12012 July 2024 Information Request for the Quad Cities Nuclear Station Biennial Problem Identification and Resolution Inspection ML24135A0182024-05-13013 May 2024 NRR E-mail Capture - Draft Request for Additional Information Quad Cities TSTF-505 Amendment ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24086A5182024-04-30030 April 2024 E-mail to Christian Williams Decision on the Exemption Request for Quad Cities ML24086A4782024-04-24024 April 2024 Email to Christian Williams Availability of Environmental Assessment for the Quad Cities Exemption ML24114A1702024-04-15015 April 2024 Request for State Review of the Quad Cities HI-STORM Exemption Request Environmental Assessment ML24102A2422024-04-10010 April 2024 NRR E-mail Capture - Draft Request for Additional Information Quad Cities TSTF-505 and 50.69 Amendments ML24089A0102024-03-29029 March 2024 NRR E-mail Capture - Quad Cities Unit Nos. 1 and 2 - Alternative to Core Spray Pump Testing - Acceptance of Requested Licensing Action Relief Request Associated with the Sixth Inservice Testing Interval ML24066A1532024-03-0606 March 2024 NRR E-mail Capture - Request for Additional Information TSTF-505, R2, Provide Risk-Informed Extended Completion Times, RITSTF (Risk-Informed Technical Specification Task Force) Initiative 4b and 10 CFR 50.69 License Amendments ML23349A0362023-12-14014 December 2023 NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability ML23338A1192023-11-21021 November 2023 NRR E-mail Capture - Draft Request for Additional Information Quad Cities Relief Request I5R-26 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23262A7432023-09-19019 September 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 – Acceptance of Relief Request I5R-26 ML23186A1412023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-505 ML23186A1482023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt 10 CFR 50.69 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23118A1652023-04-28028 April 2023 NRR E-mail Capture - Request for Additional Information Quad Cities, Unit 2, Alternative Request I6R-11 ML23083B9572023-03-24024 March 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-564 ML23055A0392023-02-24024 February 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Amendment to Adopt TSTF-416 ML23052A0772023-02-21021 February 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance Timely Renewal Exemption Request ML22357A0392022-12-23023 December 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of I6R-10 Related to Repair of Penetration N-11B ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23004A0262022-12-16016 December 2022 NRR E-mail Capture - Draft Request for Additional Information - Quad Cities Alternative RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves (EPD L-2022-LLR-0070) ML22348A0452022-12-14014 December 2022 NRR E-mail Capture - Draft Request for Additional Information Regarding Quad Cities Alternative I6R-09 ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22290A0662022-10-17017 October 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-04 Related to HPCI Drain Pot Solenoid Valve Testing ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22256A0112022-09-12012 September 2022 NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage ML22224A0222022-08-12012 August 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative I6R-09 Related to Use of Certain 2013 Edition ASME Code Requirements ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22206A0352022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Quad Cities Alternative Related to Sblc Nozzle Inspection ML22193A0412022-07-11011 July 2022 NRR E-mail Capture - RAI Quad Cities License Amendment to Expand the Use of Prime Methods ML22187A1832022-07-0606 July 2022 NRR E-mail Capture - Completion of Activities Related to EPID L-2022-LLD-003, Quad Cities Potential NOED ML22182A1992022-07-0101 July 2022 NRR E-mail Capture - RAI Alternative RV-11, Code Case OMN-28 ML22164A8582022-06-13013 June 2022 NRR E-mail Capture - RAI Alternative RV-09, MSSVs ML22164A8562022-06-13013 June 2022 NRR E-mail Capture - RAI Quad Cities Alternative RV-08, Safety Relief Valves ML22164A7852022-06-13013 June 2022 NRR E-mail Capture - RAI Quad Cities Amendment for Spent Fuel Pool Storage Analysis ML22101A0932022-04-11011 April 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Relief I6R-01 Related to SLC Nozzle Inner Radius Inspection ML22077A4122022-03-18018 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-06 Related to MSSV Setpoint Testing ML22076A0322022-03-17017 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-03 Related to PIV Leak Test Frequency ML22075A0752022-03-16016 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-07 Related to MSIV Stroke Testing ML22068A1512022-03-0909 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-10 Related to Code Case OMN-28, MOV Testing ML22068A0552022-03-0909 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-09 Related to MSSV Testing ML22068A0062022-03-0909 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-11 Related to OMN-28, Valve Position Verification ML22067A2172022-03-0808 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative Related to MSRV Testing ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0482024-07-12012 July 2024 Information Request for the Quad Cities Nuclear Station Biennial Problem Identification and Resolution Inspection ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24135A0182024-05-13013 May 2024 NRR E-mail Capture - Draft Request for Additional Information Quad Cities TSTF-505 Amendment ML24102A2422024-04-10010 April 2024 NRR E-mail Capture - Draft Request for Additional Information Quad Cities TSTF-505 and 50.69 Amendments ML24066A1532024-03-0606 March 2024 NRR E-mail Capture - Request for Additional Information TSTF-505, R2, Provide Risk-Informed Extended Completion Times, RITSTF (Risk-Informed Technical Specification Task Force) Initiative 4b and 10 CFR 50.69 License Amendments ML24053A1192024-02-22022 February 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000265/2024010 and 05000254/2024010 ML23349A0362023-12-14014 December 2023 NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability ML23338A1192023-11-21021 November 2023 NRR E-mail Capture - Draft Request for Additional Information Quad Cities Relief Request I5R-26 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23118A1652023-04-28028 April 2023 NRR E-mail Capture - Request for Additional Information Quad Cities, Unit 2, Alternative Request I6R-11 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23065A2832023-03-0707 March 2023 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000254/2023010 and 05000265/2023010 ML23013A1502023-01-17017 January 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2023002 ML23004A0262022-12-16016 December 2022 NRR E-mail Capture - Draft Request for Additional Information - Quad Cities Alternative RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves (EPD L-2022-LLR-0070) ML22348A0452022-12-14014 December 2022 NRR E-mail Capture - Draft Request for Additional Information Regarding Quad Cities Alternative I6R-09 ML22227A1152022-09-27027 September 2022 Request for Withholding Information from Public Disclosure ML22256A0112022-09-12012 September 2022 NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage ML22249A2332022-09-0606 September 2022 Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report 05000254/2022011 05000265/2022011 ML22206A0352022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Quad Cities Alternative Related to Sblc Nozzle Inspection ML22193A0412022-07-11011 July 2022 NRR E-mail Capture - RAI Quad Cities License Amendment to Expand the Use of Prime Methods ML22182A1992022-07-0101 July 2022 NRR E-mail Capture - RAI Alternative RV-11, Code Case OMN-28 ML22178A1362022-06-28028 June 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Quad Cities Station ML22164A8582022-06-13013 June 2022 NRR E-mail Capture - RAI Alternative RV-09, MSSVs ML22164A8562022-06-13013 June 2022 NRR E-mail Capture - RAI Quad Cities Alternative RV-08, Safety Relief Valves ML22164A7852022-06-13013 June 2022 NRR E-mail Capture - RAI Quad Cities Amendment for Spent Fuel Pool Storage Analysis ML22076A1122022-03-15015 March 2022 Request for Additional Information Related to the Amendment Request to Transition to GNF3 Fuels (EPID L-2021-LLA-0159) (Redacted) ML22059A9902022-03-0101 March 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Implement Prime Methodologies for Evaluating Thermal Overpower and Mechanical Overpower Limits for Non-Global Nuclear Fuels Fuel ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22039A1912022-02-0808 February 2022 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21342A3842021-12-0808 December 2021 NRR E-mail Capture - Request for Additional Information: Quad Cities 1 & 2 License Amendment Request Transition to GNF3 Fuel ML21294A0032021-10-26026 October 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Regarding Transition to GNF3 Fuel ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21238A3142021-08-26026 August 2021 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000254/2021004; 05000265/2021004 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20183A2852020-07-0101 July 2020 Request for Information for an NRC Triennial Baseline Bases Assurance Inspection (Team): Inspection Report 05000254/2020011 and 05000265/2020011 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20031C8332020-01-31031 January 2020 NRR E-mail Capture - Request for Additional Information for Quad Cities Request to Revise Technical Specifications to Increase the MSIV Leakage Rate (L-2019-LLA-0045) ML20021A0342020-01-17017 January 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2020002; 05000265/2020002 ML19134A2792019-05-15015 May 2019 Supplemental Information Needed for Acceptance of License Amendment Request to Increase Main Steam Isolation Valve Allowable Leakage Rates ML18346A4032018-12-0707 December 2018 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Inspection Supplemental Request for Information (DRS-A.Shaikh) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17353A9492018-01-0909 January 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment ML17355A0112017-12-20020 December 2017 NRR E-mail Capture - Request for Additional Information Regarding Relief Request I5R-11, Revision 2 ML17333A0822017-11-28028 November 2017 17 Quad Cities Nuclear Plant, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000265/2018001 (DRS-M.Domke) ML17262A0892017-09-19019 September 2017 Request for Additional Information Concerning Permanent Extension of Type a and Type C Leak Rate Test Frequencies (RS-17-051) 2024-07-12
[Table view] |
Text
From:
Kuntz, Robert Sent:
Monday, June 13, 2022 10:32 AM To:
Steinman, Rebecca L:(Constellation Nuclear)
Subject:
RAI RE: Quad Cities amendment for spent fuel pool storage analysis (EPID L-2021-LLA-0196)
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 25, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21298A168, Exelon Generation Company, LLC submitted a request for amendments to Renewed Facility Operating License Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station, (QCNPS), Units 1 and 2, respectively. On February 1, 2022 (ADAMS Accession No. ML22032A333), Exelon Generation Company, LLC was renamed Constellation Energy Generation, LLC (Constellation, or the licensee). Specifically, the amendment request is proposing a new criticality safety analysis (CSA) methodology for performing the criticality safety evaluation for legacy fuel types in addition to the GNF3 reload fuel in the spent fuel pool (SFP).
The amendment is also proposing a change to the new fuel vault (NFV) CSA to utilize the GESTAR II methodology for validating the NFV criticality safety for GNF3 fuel in the General Electric (GE) designed NFV racks.
The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing your application and has identified areas where additional information is needed to complete its review. The NRC staff expects a response to this RAI within 30 days of this message which is July 13, 2022. If Constellation can not provide a response as requested contact me to discuss.
Robert Kuntz Senior Project Manager NRC/NRR/DORL/LPL3 (301) 415-3733 REQUEST FOR ADDITIONAL INFORMATION QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 LICENSE AMENDMENT RELATED TO SPENT FUEL STORAGE ANALYSIS Regulatory Requirements Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, Criterion 5 requires, Structures, systems, and components important to safety shall not be shared among nuclear power units unless it can be shown that such sharing will not significantly impair their ability to perform their safety functions, including, in the event of an accident in one unit, an orderly shutdown and cooldown.
10 CFR Part 50, Appendix A, Criterion 62 requires, Criticality in the fuel storage and handling system shall be prevented by physical systems or processes, preferably by use of geometrically safe configurations.
Paragraph 50.68(a) of 10 CFR requires, Each holder of a construction permit or operating license for a nuclear power reactor issued under this part or a combined license for a nuclear power reactor issued under Part 52 of this chapter, shall comply with either 10 CFR 70.24 of this
chapter or the requirements in paragraph (b) of this section. The licensee has chosen to comply with Paragraph 50.68(b) of 10 CFR.
Paragraph 50.68(b)(1) of 10 CFR requires, Plant procedures shall prohibit the handling and storage at any one time of more fuel assemblies than have been determined to be safely subcritical under the most adverse moderation conditions feasible by unborated water.
Paragraph 50.68(b)(2) of 10 CFR requires, The estimated ratio of neutron production to neutron absorption and leakage (k-effective) of the fresh fuel in the fresh fuel storage racks shall be calculated assuming the racks are loaded with fuel of the maximum fuel assembly reactivity and flooded with unborated water and must not exceed 0.95, at a 95 percent probability, 95 percent confidence level. This evaluation need not be performed if administrative controls and/or design features prevent such flooding or if fresh fuel storage racks are not used.
Paragraph 50.68(b)(3) of 10 CFR requires, If optimum moderation of fresh fuel in the fresh fuel storage racks occurs when the racks are assumed to be loaded with fuel of the maximum fuel assembly reactivity and filled with low-density hydrogenous fluid, the k-effective corresponding to this optimum moderation must not exceed 0.98, at a 95 percent probability, 95 percent confidence level. This evaluation need not be performed if administrative controls and/or design features prevent such moderation or if fresh fuel storage racks are not used.
Paragraph 50.68(b)(4) of 10 CFR requires, in part, If no credit for soluble boron is taken, the k-effective of the spent fuel storage racks loaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95-percent probability, 95-percent confidence level, if flooded with unborated water.
The QCNPS SFP NCS analysis does not contain soluble boron, so the 10 CFR 50.68(b)(4) requirements regarding soluble boron do not apply.
In addition, paragraph 50.36(c)(4) of 10 CFR requires, Design features. Design features to be included are those features of the facility such as materials of construction and geometric arrangements, which, if altered or modified, would have a significant effect on safety and are not covered in categories described in paragraphs (c) (1), (2), and (3) of this section.
RAI-SFNB-1:
In Section 2.2 New Fuel Vault Criticality Safety Analysis of Attachment 1 to the October 25, 2021, letter it states, The QCNPS NFV racks are GE designed low density racks with an interrack spacing of 11 inches (Reference 6.3, Section 9.1.1.2). The NFV rack CSA coverage for the new GNF3 fuel will be the GESTAR II (Reference 6.4) analysis for GE designed low density NFV racks upon approval of this proposed license amendment. The applicability of GESTAR II to the GNF3 fuel type is documented in the GNF3 GESTAR II validation report (Reference 6.6). The QCNPS NFV interrack pitch is 10.5 inches (the criteria listed in GESTAR II) and thus the racks may be utilized to store new GNF fuel with in-core SCCG [Standard Cold Core Geometry] kinf 1.31 (Reference 6.4, Section 3.5). Past NFV CSA will no longer be applicable to QCNPS upon implementation of this license amendment because the only fuel to be delivered to the site for core reloads will be GNF3.
However, neither Reference 6.4, GE Licensing Topical Report NEDE-24011-P-A, General Electric Standard Application for Reactor Fuel (GESTAR II, Main)," Revision 31, dated
November 2020 (ML20330A199) nor Reference 6.6 NEDC-33879P, Revision 4, GNF3 Generic Compliance with NEDE-24011-P-A (GESTAR II)," dated August 2020 (ML20244A110) contain a nuclear criticality safety methodology or nuclear criticality safety analysis. To evaluate compliance with 10 CFR 50.68(b)(2) submit the following:
NFV criticality safety analysis methodology used in the analysis.
Criticality safety analysis that sets the limits for the QCNPS NFV.
Criticality safety analysis that demonstrates GNF3 meets the limits for the QCNPS NFV.
RAI-SFNB-2:
QCNPS Updated Final Safety Analysis Report (UFSAR) section 9.1.1.2 states, The minimum center-to-center spacing of bundles in the racks is 6.625 inches longitudinally by 11 inches between rows. This is not a pitch 10.5 inches. To evaluate compliance with 10 CFR 50.68(b)(2) explain and clarify this apparent discrepancy.
RAI-SFNB-3:
The QCNPS NFV center to center pitch is critical to maintaining the geometric spacing of fuel assemblies to ensure 10 CFR 50.68(b)(2) is met. Describe the controls QCNPS has in place to ensure the QCNPS NFV center to center spacing is maintained.
RAI-SFNB-4:
In Section 4.1 Applicable Regulatory Requirements/Criteria of Attachment 1 to the October 25, 2021, letter states, in part The regulation also states that for the optimum moderation case the keff must not exceed 0.98 at a 95 percent probability, 95 percent confidence level. The optimum moderation case is not applicable to the QCNPS NFV as it is a moderation controlled area (see Reference 6.3, Section 9.1.1.3). 10 CFR 50.68(b)(3) requires optimum moderation be prevented to forgo complying with the k-effective portion of the paragraph. Section 9.1.1.3 of the QCNPS UFSAR does not list any means by which an optimum moderation condition is prevented. To evaluate compliance with 10 CFR 50.68(b)(3) explain/justify how an optimum moderation condition is precluded at all times.
RAI-SFNB-5:
The measures QCNPS has to ensure NFV optimum moderation condition is precluded at all times are essential to forgoing the NFV optimum moderation k-effective analysis otherwise stipulated in 10 CFR 50.68(b)(3). Describe the controls QCNPS has in place to ensure those measures are not compromised.
RAI-SFNB-6:
In Section 1.0 INTRODUCITON of NEDC-33932P Revision 1 (Attachment 3 to the October 25, 2021, letter) it states, A maximum SCCG, uncontrolled peak in-core k [eiqenvalue] of 1.29 as defined by the lattice physics code TGBLA06 (Reference 1) is set as the limit for this analysis. However, NEDC-33932P Revision 1 Reference 1 does not have a clear nexus to how TGBLA06 calculates a SCCG. Additionally, NEDC-33932P Revision 1 Reference 1 is dated November 10, 1999, which predates GNF3 fuel by at least a decade. To evaluate compliance with 10 CFR 50.68(b)(4) provide the methodology or appropriate reference for how
TGBLA06 calculates SCCG and the analysis or appropriate reference for how TGBLA06 is an appropriate code for modeling GNF3.
RAI-SFNB-7:
The description of the analysis in NEDC-33932P Revision 1 Section 5.5.2 Normal Bias Cases provides a brief description of the analysis performed to evaluate No inserts on the rack periphery. The analysis considers perturbed scenarios referenced to a non-perturbed scenario.
NEDC-33932P Revision 1 Section 5.5.3 Abnormal/Accident Bias Cases provides a brief description of the analysis performed to evaluate Abnormal positioning of fuel assembly outside the fuel storage rack. This analysis also considers perturbed scenarios referenced to a non-perturbed scenario. The descriptions provided indicates the non-perturbed scenario values in both the No inserts on the rack periphery and the Abnormal positioning of fuel assembly outside the fuel storage rack evaluations should be identical. However comparison of the information listed in Table 11 to Table 12 indicates they are not identical. To evaluate compliance with 10 CFR 50.68(b)(4) explain the differences between the non-perturbed scenario values in these tables.
Hearing Identifier:
NRR_DRMA Email Number:
1665 Mail Envelope Properties (SA9PR09MB4640CE03532523F563C9C18899AB9)
Subject:
RAI RE: Quad Cities amendment for spent fuel pool storage analysis (EPID L-2021-LLA-0196)
Sent Date:
6/13/2022 10:32:22 AM Received Date:
6/13/2022 10:32:00 AM From:
Kuntz, Robert Created By:
Robert.Kuntz@nrc.gov Recipients:
"Steinman, Rebecca L:(Constellation Nuclear)" <Rebecca.Steinman@constellation.com>
Tracking Status: None Post Office:
SA9PR09MB4640.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 10292 6/13/2022 10:32:00 AM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: