ML092090314

From kanterella
Jump to navigation Jump to search
License Renewal Application First Annual Update Required by 10 CFR 54.21(b)
ML092090314
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/27/2009
From: Price J
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML092090314 (3)


Text

f )ofllinion Energy Kewaunee, Inc.

i :0(' i )(Hllinion Boulevard, Clen Allen, VA 2.)0/1; July 27, 2009 United States Nuclear Regulatory Commission Serial No.: 09-405 Attention: Document Control Desk LR/DEA R1 Washington, DC 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.

KEWAUNEE POWER STATION LICENSE RENEWAL APPLICATION FIRST ANNUAL UPDATE REQUIRED BY 10 CFR 54.21 (b)

By letter dated August 12, 2008 (Reference 1), Dominion Energy Kewaunee (DEK) submitted an application for renewal of the operating license for Kewaunee Power Station (KPS). DEK is required by 10 CFR 54.21 (b) to report any changes to the current licensing basis (CLB) of the facility under review that materially affect the contents of the license renewal application (LRA), including the Updated Safety Analysis Report (USAR) Supplement. These changes are required to be submitted each year, and at least 3 months prior to the scheduled completion of the LRA review by the NRC.

Dominion Energy Kewaunee has completed a review of KPS CLB changes since the August 12, 2009 submittal of the KPS LRA. No changes were identified that materially affect the information in the KPS LRA, including the USAR supplement.

Should you have any questions regarding this submittal, please contact Mr. Paul C. Aitken at (804) 273-2818.

Very truly yours, STATE OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and State aforesaid, today by J. Alan Price, who is Vice President - Nuclear Engineering of Dominion Energy Kewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ~ f'J4- h day of "J Ij I 'I ,2009.

~ d~

~PUbliC

Serial No.09-405 Docket No. 50-305 Page 2 of 3

References:

1. Letter from David A. Christian (DEK) to Document Control Desk (NRC), "Kewaunee Power Station Application for Renewed Operating License," dated August 12, 2008.

[ADAMS Accession No. ML082341020]

Commitments made in this letter:

None.

Serial No.09-405 Docket No. 50-305 Page 3 of 3 cc:

U.S. Nuclear Regulatory Commission Regional Administrator, Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4532 Mr. P. S. Tam, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, Mail Stop 08-H4A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. S. L. Lopas Environmental Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0-11 F1 Washington, DC 20555-0001 Mr. Q. S. Hernandez License Renewal Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0-11 F1 Washington, DC 20555-0001 NRC Senior Resident Inspector Kewaunee Power Station N490 Highway 42 Kewaunee, WI 54216 Public Service Commission of Wisconsin Electric Division P.O. Box 7854 Madison, WI 53707 David Hardtke Chairman - Town of Carlton E2334 Lakeshore Road Kewaunee, WI 54216