ML090840440

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Exelon Generation Co., LLC, Peach Bottom, Units 2 & 3, to Discuss Result of Nrc'S Assessment of Safety Performance
ML090840440
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/25/2009
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Exelon Generation Co
KROHN P, RI/DRP/PB4/610-337-5120
References
MN 09-011
Download: ML090840440 (5)


Text

MN No.09-011 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 25, 2009 Licensee: Exelon Generation Company, LLC Facilities: Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos: 50-277; 50-278 Date/ Time: April 14, 2009 at 3:00 p.m.

Location: Peach Bottom Inn 6805 Delta Road Delta, PA 17314

Purpose:

The NRC requested an Annual Assessment Meeting with Exelon to review the results of the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2008. The NRCs assessment is documented in a letter dated March 4, 2009.

Attendees:

NRC: J. Clifford, Deputy Director, Division of Reactor Projects P. Krohn, Chief, Division of Reactor Projects, Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom M. Brown, Resident Inspector, Peach Bottom Licensee: W. McGuire, Site Vice President, Peach Bottom G. Stathes, Plant Manager, Peach Bottom B. Franssen, Director of Operations, Peach Bottom J. Armstrong, Regulatory Assurance Manager, Peach Bottom Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Meeting

Contact:

Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: paul.krohn@nrc.gov The NRCs annual assessment letter regarding Peach Bottom performance during 2008 can be found in ADAMS with Accession Number ML090620792. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090840440. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.

2 Regulatory actions regarding Peach Bottom related to 2008 can be located in ADAMS with Accession Numbers ML080440012 (Final Significance Determination); ML081970338 (Confirmatory Action Letter (CAL) Status Inspection); ML082410183 (CAL Closure Letter); and ML083530084 (Final Enforcement Action).

Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made know by April 10, 2009, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: ______/RA/___________

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear W. Maguire, Site Vice President, Peach Bottom J. Grimes, Acting Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight G. Stathes, Plant Manager, Peach Bottom J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs R. Franssen, Director, Operations P. Cowan, Director, Licensing D. Helker, Licensing K. Jury, Vice President, Licensing and Regulatory Affairs J. Bradley Fewell, Associate General Counsel, Exelon T. Wasong, Director, Training Correspondence Control Desk D. Allard, Director, Bureau of Radiation Protection, PA Department of Environmental Protection S. Gray, Power Plant and Environmental Review Division (MD)

S. Pattison, Secretary, MD Department of the Environment M. Griffen, Maryland Department of Environment A. Lauland, Director, Homeland Security Advisor Public Service Commission of Maryland, Engineering Division

3 Board of Supervisors, Peach Bottom Township B. OConnor, Council Administrator of Harford County Council R. Ayers, Deputy Mgr, Harford County Div of Emergency Operations E. Crist, Harford County Div of Emergency Operations S. Ayers, Emergency Planner, Harford County Div of Emergency Operations R. Brooks, Cecil County Dept of Emergency Services Mr & Mrs Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Dir, MD Environmental Program Manager, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency Director, Nuclear Safety Project, Union of Concerned Scientists

4 Agenda NRCs Annual Assessment Meeting Peach Bottom Atomic Power Station April 14, 2009 Introduction ..NRC (3 minutes)

Review of Reactor Oversight Process .NRC (5 minutes)

National Summary of Plant Performance NRC (7 minutes)

Discussion of Peach Bottom Performance..NRC (15 minutes)

Exelons Response and Remarks .Exelon (20 minutes)

Closing Remarks .. NRC (5 minutes)

Short Break (5 minutes)

NRC to address public questions . NRC/Members of the Public (as needed)

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made know by April 10, 2009, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1-2), NRR (RIDSNRRDORILpl 1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA R. Fuhrmeister, DRP J. Thompson, NRR M. Dapas, DRA S. Barr, DRS G. Matakas, ORA D. Lew, DRP F. Bower, DRP, SRI DRS Division Secretary, RI J. Clifford, DRP M. Brown, DRP, RI DRP Division Secretary, RI P. Krohn, DRP S. Schmitt, DRP, OA RI Receptionist T. Setzer, DRP D. Roberts, DRS PMNS E. Torres, DRP E. Cobey, DRS ROPreportsResource@nrc.gov S. Campbell, RI OEDO D. Screnci, PAO Region I Docket Room R. Nelson, NRR N. Sheehan, PAO J. Hughey, NRR L. Scholl, DRS R. Barkley, ORA P. Bamford, NRR H. Chernoff, NRR N. McNamara, SLO SUNSI Review Complete: PGK (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT(EOC, MC)\ROP 9 EOC\PBAPS 2008 AAMEETING NOTICE.DOC After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ML090840440 OFFICE RI/DRP RI/DRP NAME FBower/via telephone PKrohn./PGK DATE 03/25 /09 03/25 /09 OFFICIAL RECORD COPY