|
---|
Category:Meeting Agenda
MONTHYEARPMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023 Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19298C0222019-11-0505 November 2019 Agenda - Peach Bottom APS 2 and 3 Sc Draft Meeting Agenda - Sc - November 5, 2019 ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14055A0042014-03-11011 March 2014 Meeting Notice with Exelon Generation Company, LLC (Exelon) Regarding Emergency Response Organization Annual Training ML14063A3862014-03-0606 March 2014 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Unit Nos. 2 and 3 ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12159A2662012-06-11011 June 2012 County Generating Station Pre-Application Meeting Extended Power Uprate: Replacement Steam Dryers. June 11, 2012 ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1109101082011-04-0101 April 2011 Annual Assessment Meeting Notice-REVISED-LOCATION Change ML1105407242011-02-23023 February 2011 2/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11 ML1019000152010-07-0909 July 2010 Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Revisions to the Cyber Security Plan Submittal for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island ML1007605232010-03-17017 March 2010 Notice of Licensee Meeting 4/19/2010 ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet ML0914901422009-06-0909 June 2009 Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes ML0908404402009-03-25025 March 2009 Notice of Meeting with Exelon Generation Co., LLC, Peach Bottom, Units 2 & 3, to Discuss Result of Nrc'S Assessment of Safety Performance ML0810600322008-04-15015 April 2008 Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island ML0808605822008-04-0808 April 2008 Notice of Meeting with Exelon Generation Company, LLC (Exelon), to Discuss Licensing Activities ML0809406822008-04-0303 April 2008 Notice of Public Meeting with Exelon Generation Co., LLC, Peach Bottom SCWE ML0802501172008-01-15015 January 2008 1/15/2008 Slides from Drop-in Visit Exelon/Amergen ML0732006962007-11-16016 November 2007 Notice of Meeting with Exelon Generating Company, NRC Staff Will Inform Exelon Management of Results of NRC Follow-Up Inspection (November 5-9, 2007), That Continued Review Security Events at Peach Bottom Atomic Power Station ML0707804282007-03-19019 March 2007 Notice of Meeting with Exelon Generating Company, LLC to Discuss the Nrc'S Assessment of the Safety Performance of the Peach Bottom for Calendar Year 2006 ML0705700372007-03-13013 March 2007 Summary of Meeting with Exelon Generation Co. on Pre-Submittal of Licensing Amendment for an Alternate Source Term for Peach Bottom, Units 2 & 3 ML0706003912007-02-27027 February 2007 Revised Notice of Meeting with Exelon Generation Co., LLC to Discuss Licensing Issues and Schedule of Upcoming Licensing Activities with the Exelon Fleet of Nuclear Power Plants (Braidwood, Units 1 and 2, Byron, Unit Nos. 1 and 2; Clinton.. ML0703605402007-02-15015 February 2007 Forthcoming Meeting with Exelon Generation Company to Discuss Licensing Activities ML0702405702007-01-26026 January 2007 Notice of Meeting with Exelon Generation Co. to Discuss Technical Aspects of the Licensee'S Presubmittal for an Alternate Source Term for the Peach Bottom Atomic, Units. 2 and 3 ML0608702712006-03-29029 March 2006 Notice of NRC Annual Assessment Meeting with Exelon Generating Company, LLC to Discuss the Safety Performance of the Peach Bottom Atomic Power Station for Calendar Year 2005 ML0513701522005-05-23023 May 2005 Attachment 2 - Agenda -Public Meeting Summary on FAQ Appeal Meeting May 12, 2005 ML0506805222005-03-11011 March 2005 Meeting with Exelon Generation Co. to Discuss NRC Assessment of Safety Performance at Peach Bottom Units 2 & 3 for Cy 2004 ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) ML17252A1551977-09-19019 September 1977 Summary of Meeting with Representatives of the Mark I Owner'S Group and GE to Discuss the Structural Acceptance Criteria for the Mark I Containment Ltp ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2024-01-29
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 ML23124A1072023-05-0404 May 2023 Notice of Public Meeting (Webinar) - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023 Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules ML22131A2212022-05-11011 May 2022 Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards ML21140A3142021-05-20020 May 2021 Notice of Public Meeting - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sq) PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20168A2782020-06-16016 June 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) Corrected Registration Link ML20139A1532020-05-18018 May 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19136A0962019-05-15015 May 2019 Notice of Category 3 Public Meeting (Webinar) - Joint Annual Assessment Meeting for Beaver Valley, Limerick, Peach Bottom, Susquehanna, and Three Mile Island ML19109A0362019-04-23023 April 2019 License Amendment Request to Revise Technical Specifications for a Temporary One-Time Extension of Completion Time ML18100A2112018-04-26026 April 2018 Notice of Public Meeting May 24, 2018 ML17090A1282017-04-0505 April 2017 Notice of Public Meeting with Exelon Generation Company, LLC to Discuss Nrc'S Assessment of Safety Performance at Peach Bottom Atomic Power Station for 2016 ML16081A3492016-03-21021 March 2016 Notice of Annual Assessment Meeting - Peach Bottom Atomic Power Station, Units 2 & 3, on April 6, 2016 ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML15070A5272015-03-11011 March 2015 April 16, 2015 Notice of Public Meeting on Peach Bottom Atomic Power Station, Units 2 & 3, with Exelon Generation Company, LLC ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14071A5892014-03-12012 March 2014 Notice of Category 3 Meeting with Exelon to Discuss Peach Bottom Performance During Calendar Year 2013 ML14055A0042014-03-11011 March 2014 Meeting Notice with Exelon Generation Company, LLC (Exelon) Regarding Emergency Response Organization Annual Training ML14063A3862014-03-0606 March 2014 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Unit Nos. 2 and 3 ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13077A4392013-03-18018 March 2013 Notice of Public Meeting - Peach Bottom Atomic Power Station, Units 2 and 3, to Discuss the Nrc'S Assessment of Safety Performance for 2012 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML12116A0812012-04-25025 April 2012 Update - Peach Bottom Atomic Power Station - Notice of Public Meeting with Exelon Generation Company, LLC, on April 25, 2012 ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML12080A0332012-03-20020 March 2012 Notice of Public Meeting with Exelon to Discuss Performance at Peach Bottom During Calendar Year 2011 ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1109101082011-04-0101 April 2011 Annual Assessment Meeting Notice-REVISED-LOCATION Change ML1106911972011-03-10010 March 2011 Notice of Licensee Meeting - Peach Bottom Atomic Power Station, Units 2 and 3, to Review Results of Nrc'S Assessment of Safety Performance of Peach Bottom Atomic Power Station for Calendar Year 2010 ML1019000152010-07-0909 July 2010 Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Revisions to the Cyber Security Plan Submittal for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island ML1007605232010-03-17017 March 2010 Notice of Licensee Meeting 4/19/2010 ML0928704322009-10-14014 October 2009 Revised Meeting Notice for Exelon Re Pre-application Meeting to Discuss Exelon Plans to Submit Power Uprate Requests ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet ML0914901422009-06-0909 June 2009 Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes ML0908404402009-03-25025 March 2009 Notice of Meeting with Exelon Generation Co., LLC, Peach Bottom, Units 2 & 3, to Discuss Result of Nrc'S Assessment of Safety Performance ML0831202242008-11-26026 November 2008 Nuclear Regulatory Commission Public Meeting with Exelon Generation Company, LLC, to Discuss Peach Bottom Request for Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R, Section Iii. G ML0831105932008-11-0707 November 2008 Notice of Closed Meeting to Exelon Generation Company for SCWE Survey Review ML0810600322008-04-15015 April 2008 Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island ML0808605822008-04-0808 April 2008 Notice of Meeting with Exelon Generation Company, LLC (Exelon), to Discuss Licensing Activities ML0809406822008-04-0303 April 2008 Notice of Public Meeting with Exelon Generation Co., LLC, Peach Bottom SCWE 2024-01-29
[Table view] |
Text
MN No.09-011 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 25, 2009 Licensee: Exelon Generation Company, LLC Facilities: Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos: 50-277; 50-278 Date/ Time: April 14, 2009 at 3:00 p.m.
Location: Peach Bottom Inn 6805 Delta Road Delta, PA 17314
Purpose:
The NRC requested an Annual Assessment Meeting with Exelon to review the results of the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2008. The NRCs assessment is documented in a letter dated March 4, 2009.
Attendees:
NRC: J. Clifford, Deputy Director, Division of Reactor Projects P. Krohn, Chief, Division of Reactor Projects, Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom M. Brown, Resident Inspector, Peach Bottom Licensee: W. McGuire, Site Vice President, Peach Bottom G. Stathes, Plant Manager, Peach Bottom B. Franssen, Director of Operations, Peach Bottom J. Armstrong, Regulatory Assurance Manager, Peach Bottom Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Meeting
Contact:
Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: paul.krohn@nrc.gov The NRCs annual assessment letter regarding Peach Bottom performance during 2008 can be found in ADAMS with Accession Number ML090620792. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090840440. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.
2 Regulatory actions regarding Peach Bottom related to 2008 can be located in ADAMS with Accession Numbers ML080440012 (Final Significance Determination); ML081970338 (Confirmatory Action Letter (CAL) Status Inspection); ML082410183 (CAL Closure Letter); and ML083530084 (Final Enforcement Action).
Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRCs website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by NRC personnel at this meeting should be made know by April 10, 2009, via telephone to the NRC meeting contact.
Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.
Approved by: ______/RA/___________
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:
C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear W. Maguire, Site Vice President, Peach Bottom J. Grimes, Acting Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight G. Stathes, Plant Manager, Peach Bottom J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs R. Franssen, Director, Operations P. Cowan, Director, Licensing D. Helker, Licensing K. Jury, Vice President, Licensing and Regulatory Affairs J. Bradley Fewell, Associate General Counsel, Exelon T. Wasong, Director, Training Correspondence Control Desk D. Allard, Director, Bureau of Radiation Protection, PA Department of Environmental Protection S. Gray, Power Plant and Environmental Review Division (MD)
S. Pattison, Secretary, MD Department of the Environment M. Griffen, Maryland Department of Environment A. Lauland, Director, Homeland Security Advisor Public Service Commission of Maryland, Engineering Division
3 Board of Supervisors, Peach Bottom Township B. OConnor, Council Administrator of Harford County Council R. Ayers, Deputy Mgr, Harford County Div of Emergency Operations E. Crist, Harford County Div of Emergency Operations S. Ayers, Emergency Planner, Harford County Div of Emergency Operations R. Brooks, Cecil County Dept of Emergency Services Mr & Mrs Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Dir, MD Environmental Program Manager, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency Director, Nuclear Safety Project, Union of Concerned Scientists
4 Agenda NRCs Annual Assessment Meeting Peach Bottom Atomic Power Station April 14, 2009 Introduction ..NRC (3 minutes)
Review of Reactor Oversight Process .NRC (5 minutes)
National Summary of Plant Performance NRC (7 minutes)
Discussion of Peach Bottom Performance..NRC (15 minutes)
Exelons Response and Remarks .Exelon (20 minutes)
Closing Remarks .. NRC (5 minutes)
Short Break (5 minutes)
NRC to address public questions . NRC/Members of the Public (as needed)
2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRCs website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by NRC personnel at this meeting should be made know by April 10, 2009, via telephone to the NRC meeting contact.
Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.
Distribution: (Via E-Mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)
Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)
Project Directorate I-1 (PD1-2), NRR (RIDSNRRDORILpl 1-2)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, RA R. Fuhrmeister, DRP J. Thompson, NRR M. Dapas, DRA S. Barr, DRS G. Matakas, ORA D. Lew, DRP F. Bower, DRP, SRI DRS Division Secretary, RI J. Clifford, DRP M. Brown, DRP, RI DRP Division Secretary, RI P. Krohn, DRP S. Schmitt, DRP, OA RI Receptionist T. Setzer, DRP D. Roberts, DRS PMNS E. Torres, DRP E. Cobey, DRS ROPreportsResource@nrc.gov S. Campbell, RI OEDO D. Screnci, PAO Region I Docket Room R. Nelson, NRR N. Sheehan, PAO J. Hughey, NRR L. Scholl, DRS R. Barkley, ORA P. Bamford, NRR H. Chernoff, NRR N. McNamara, SLO SUNSI Review Complete: PGK (Reviewers Initials)
DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT(EOC, MC)\ROP 9 EOC\PBAPS 2008 AAMEETING NOTICE.DOC After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ML090840440 OFFICE RI/DRP RI/DRP NAME FBower/via telephone PKrohn./PGK DATE 03/25 /09 03/25 /09 OFFICIAL RECORD COPY