ML100760523

From kanterella
Jump to navigation Jump to search
Notice of Licensee Meeting 4/19/2010
ML100760523
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/17/2010
From: Paul Krohn
Reactor Projects Branch 1
To:
References
MN 10-007
Download: ML100760523 (4)


Text

MN No.10-007 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 17,2010 Licensee: Exelon Generation Company, LLC Facilities: Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos: 50-277: 50-278 Date/Time: April 19, 2010 at 6:00 p.m.

Location: Mt. Nebo Methodist Church 962 Flintville Road Delta, PA 17314 (meeting room located in lower level)

Purpose:

The NRC requested an Annual Assessment Meeting with Exelon to review the results of the NRC's assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2009. The NRC's assessment is documented in a letter dated March 3, 2010.

Attendees:

NRC: P. Krohn, Chief, Division of Reactor Projects, Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom A. Ziedonis, Resident Inspector. Peach Bottom A. Rosebrook, Senior Project Engineer, Branch 4 Licensee: W. McGuire, Site Vice President, Peach Bottom G. Stathes, Plant Manager, Peach Bottom J. Kovalchick, Site Security Manager, Peach Bottom J. Armstrong, Regulatory Assurance Manager, Peach Bottom Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjoumed.

Meeting

Contact:

Paul G. Krohn, Chief, Projects Branch 4 610~337-5120 E-mail: paul.krohn@nrc.gov The NRC's annual assessment letter regarding Peach Bottom performance during 2009 can be found in ADAMS with Accession Number ML100621009. ADAMS is accessible from the NRC website at: httpJlnrc.gov/reading-rrnladams.html.

2 Regulatory actions regarding Peach Bottom during 2009 can be located in ADAMS with Accession Numbers ML093350150 (Confirmatory Order); and ML083530084 (SL III Notice of Violation and Civil Penalty),

Additional information relative to the NRC's Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRC's website at:

http://www.nrc.gov/NRRlOVERSIGHT/ASSESSlindex.html.

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings, effective H

May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made know by April 15, 2010, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topiCS of interest that you would like to discuss at the meeting.

Approved by: ,!(J?J?~. ~

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ

3 Agenda NRC's Annual Assessment Meeting Peach Bottom Atomic Power Station April 19, 2010

. Introduction ......................................................................................NRC (3 minutes)

Review of Reactor Oversight Process .....................................................NRC (5 minutes)

National Summary of Plant Performance .............. , ................................. NRC (2 minutes)

Discussion of Peach Bottom Performance................................................NRC (15 minutes)

Exelon's Response and Remarks .......................................................Exelon (20 minutes)

Closing Remarks ............ '" .............................................................. NRC (5 minutes)

Short Break .............................................................................................(5 minutes)

NRC to address public questions ............................ NRC/Members of the Public (as needed)

2 Regulatory actions regarding Peach Bottom during 2009 can be located in ADAMS with Accession Numbers ML093350150 (Confirmatory Order); and ML083530084 (SL III Notice of Vielation and Civil Penalty).

Additional information relative to the NRC's Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRC's website at:

http://www.nrc.gov/NRRfOVERSIGHTfASSESS/index.html.

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings,n effective May 28,2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrC.gov, and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made know by April 15, 2010, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: IRA!

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (VIS E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RI DSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Director, Division of Inspection and Regional Supprt, NRR/DlRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRRIDORL (RIDSNRRDORL)

Asst. General Counsel Materials Utigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA A, Ziedonis, DRP RI K. Heater, DR?

M. Oapas, ORA S. Schmltt, DRP, OA D. Beards, DRS O. Lew, ORr' D. Roberts, DRS T. Haverkamp, DNMS J. Clifford, DRP P. Wllson,DRS V. Lewis, RI Receptionist P. Krohn, DRP D. Serena, PAO PMNS A. Rosebrook, DRP N. Sheehan, PAO RidsNrrPMPeachBottomResource E. Torres, DR? R. Barkley, ORA RidsNrrDirslpab@nrc.gov H. Chernoff, NRR N. McNamara, SLO ROPreportsResoUrce@nrC.gov F. Bower, DRP, SRI J. Thompson, NRR G. Matakas, ORA SUNS! Review Complete:_~P:....;G;::;;K=-_ (Reviewer's InItials) ML100760523 DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 10\2009 EOC\PBAPS 2009 AAMeeting Notice.doc After declaring this document "An Official Agency Record" it mn be released to the Public.

To receive acopy of this document, Indicate In tile box: *c* = Copy without altachrnentlencJosure "E" =Copy with a\tachmenVendosure "N":: No copy OFFICE RI/DRP I RIIDRP I I NAME ARosebrooklAAR PKrohnfPJK 03114110 03/17110 OFFICIAL RECORD COpy