Notice of NRC Annual Assessment Meeting with Exelon Generating Company, LLC to Discuss the Safety Performance of the Peach Bottom Atomic Power Station for Calendar Year 2005
ML060870271
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/29/2006
From: James Trapp
Reactor Projects Region 1 Branch 4
To:
Exelon Generation Co
References
MN-06-018
Download: ML060870271 (4)


Text

MN No.06-018 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 29, 2006 Licensee: Exelon Generating Company, LLC Facility: Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos.: 50-277; 50-278 Date/ Time: April 26, 2006 at 2:00 pm Location: Peach Bottom Inn 6085 Delta Road Delta, PA 17314

Purpose:

The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2005. The NRCs assessment is documented in a letter dated March 2, 2006.

Attendees*:

NRC: J. Trapp, Chief, Projects Branch 4, Region I F. Bower, Senior Resident Inspector, Peach Bottom D. Schroeder, Resident Inspector, Peach Bottom Licensee: B. Braun, Peach Bottom Site Vice President J. Grimes, Plant Manager D. Lewis - Director of Operations J. Armstrong - Manager of Regulatory Assurance G. Stathes, Maintenance Director C. Behrend, Engineering Director L. Bunner, Director of Outage Management C. Perino, Nuclear Oversight Manager C. Jordan, Chemistry, Environmental and Radwaste Manager Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter can be found in ADAMS with Accession Number: ML060620475. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML060870271. The NRC slides for the meeting can be accessed with the Accession Number ML060970018. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html .

Meeting

Contact:

James Trapp, Chief, Projects Branch 4 610-337-5186 E-mail: JMT1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting. Attendance by other NRC personnel should be made known by April 24, 2006.

/RA/

Approved By:

James Trapp, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Nuclear Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA)

R. McLean, Power Plant and Environmental Review Division (MD)

R. Fletcher, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)

Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)

J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams Vice-President, Licensing and Regulatory Affairs Vice-President, Operations Mid-Atlantic Senior Vice-President, Nuclear Services Director, Licensing and Regulatory Affairs J. Fewell, Assistant General Counsel

Agenda NRCs Annual Assessment Meeting Peach Bottom Atomic Power Station April 26, 2006 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Peach Bottom Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Exelons Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Exelon (30 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

ML060870271 DOCUMENT NAME: C:\MyFiles\Copies\PB 2006 AAM Meeting Notice1.wpd SISP Review Complete: CBK (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME CKhan JTrapp DATE 03/29/06 03/29/06