ML050680522

From kanterella
Jump to navigation Jump to search
Meeting with Exelon Generation Co. to Discuss NRC Assessment of Safety Performance at Peach Bottom Units 2 & 3 for Cy 2004
ML050680522
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/11/2005
From: Shanbaky M
Reactor Projects Region 1 Branch 4
To:
Shared Package
ML050680527 List:
References
MN 05-008
Download: ML050680522 (6)


Text

March 11, 2005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING MN No.: 05-008 Licensee: Exelon Generation Company Facility: Peach Bottom Atomic Power Station Docket Nos.: 50-277; 50-278 Time and Date: March 29, 2005 at 7:00 p.m.

Location: Peach Bottom Inn 6085 Delta Road, Delta, PA 17314

Purpose:

The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2004. The NRCs assessment is documented in a letter dated March 2, 2005.

Attendees*:

NRC: Mohamed Shanbaky, Chief, Projects Branch 4 Fred Bower, Senior Resident Inspector, Peach Bottom Daniel Schroeder, Resident Inspector, Peach Bottom George Wunder, Project Manager, NRR Licensee: Robert Braun, Vice President, Peach Bottom Joseph Grimes, Plant Manager Ken Langdon, Director, Work Management Dave Lewis, Director, Operations Jamie Mallon, Manager, Regulatory Assurance Garey Stathes, Director, Maintenance Tony Wasong, Director, Training Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the safety assessment presentation.

NRCs assessment letter can be found in ADAMS with an accession number of ML050610708.

This meeting notice with the attached meeting agenda can be located in ADAMS with an accession number of ML050680522. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Dr. Mohamed Shanbaky, Chief Projects Branch 4 610-337-5209 E-mail: mms1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting. Attendance by other NRC personnel should be made known by March 22, 2005.

/RA/

Approved By:

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

3 cc w/encl:

President &CNO, Exelon Nuclear-Exelon Generation Company, LLC Chief Operating Officer, Exelon Generation Company, LLC Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Senior Vice President, Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director, Licensing and Regulatory Affairs, Exelon Generation Company, LLC Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear D. Quinlan, Manager, Financial Control, PSEG R. McLean, Power Plant and Environmental Review Division Director, Nuclear Training Correspondence Control Desk D. Allard, Director, Pennsylvania Bureau of Radiation Protection R. Fletcher, Maryland Department of Environment Commonwealth of Pennsylvania (c/o R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection)

Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)

J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO)

4 Distribution:

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist

5 Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Lee, RI OEDO T. Madden, OCA J. Clifford, NRR G. Wunder, PM, NRR T. Tate, PM, NRR (Backup)

S. Collins, RA J. Wiggins, DRA M. Shanbaky, DRP A. Burritt, DRP F. Bower, DRP - NRC Senior Resident Inspector D. Schroeder, DRP - NRC Resident Inspector S. Schmitt, DRP - NRC Resident OA D. Screnci, PAO N. Sheehan, PAO R. Bores, SLO G. Matakas, ORA PMNS DOCUMENT NAME: E:\Filenet\ML050680522.wpd SISP Review Complete: Cja (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME DJohnson/mms MShanbaky for DATE 03/10/05 03/10/05 03/ /05 03/ /05 03/ /05

OFFICIAL RECORD COPY Agenda NRCs Annual Assessment Meeting Peach Bottom Atomic Power Station March 29, 2005 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Peach Bottom Station Performance . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Exelons Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Exelon (30 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

Statements from Public Officials and Members of the Public . . . . . . . . . . . . . (5 minutes each)

NRC to address public questions . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)