Letter Sequence Request |
---|
TAC:MD4839, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0708001982007-03-13013 March 2007 9100-00003-NP, Rev. 1, Wolf Creek Generating Station Main Steam and Feedwater Isolation System (Msfis) Controls Summary. Project stage: Request ET 07-0004, Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement2007-03-14014 March 2007 Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement Project stage: Request ET 07-0008, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-04-18018 April 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0712204892007-05-0303 May 2007 Meeting Notice - LAR to Upgrade the Main Steam and Feedwater Isolation System (Msfis) Project stage: Meeting ET 07-0013, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls2007-05-0909 May 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls Project stage: Response to RAI ML0713703642007-05-17017 May 2007 Handout for Meeting with Wolf Creek Nuclear Operating Corporation on the Licensee'S Application for the Main Steam and Feedwater Isolation System (Msfis) Modification Project stage: Meeting ML0713805112007-05-29029 May 2007 Acceptance Review of Licensee'S Application for Main Steam and Feedwater Isolation System Controls Modification Project stage: Acceptance Review ML0713805102007-06-0404 June 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station on License Application Request to Update Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0022, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-06-15015 June 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0717900072007-07-18018 July 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Licensee'S License Amendment Request Dated March 14, 2006, to Modify the Main Steam and Feedwater Isolation System Project stage: Meeting ML0721501532007-08-0202 August 2007 NRC Staff Handout for August 2, 2007, Meeting with Wolf Creek Nuclear Operating Corporation Project stage: Meeting ML0717900062007-08-0808 August 2007 Completion of Acceptance Review of Request to Modify the Main Stream and Feedwater Isolation System Project stage: Acceptance Review ML0722109412007-08-14014 August 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation Discussed on Description and Justification of Its Proposed Modification of the Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0039, Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-08-31031 August 2007 Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0724200172007-09-11011 September 2007 Request for Withholding Information from Public Disclosure in CS Innovations Topical Report 9100-00003-P for the Wolf Creek Generating Station Project stage: Withholding Request Acceptance ET 07-0041, Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-09-20020 September 2007 Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0725503102007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Report Submitted August 31, 2007 Project stage: Withholding Request Acceptance ML0724201352007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in Three CS Innovations Topical Reports Submitted April 18, 2007 for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502832007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Documents Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502682007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502012007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted April 18, 2007, for Wolf Creek Generating Station (Tac No. MD4839) Project stage: Withholding Request Acceptance ML0732001042007-11-16016 November 2007 Notice of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation to Discuss Main Steam and Feedwater Isolation System (Tac No. MD4839) Project stage: Meeting ML0733103642007-11-27027 November 2007 Revised Notice of Meeting with Wolf Creek Nuclear Operating Corp, to Discuss NRC Staff'S Request for Information on Licensee'S Supplemental Letter Dated September 27, 2007, to the Application Dated February 21, 2006, to Revise TS 5.5.9 Project stage: RAI ML0733101982007-11-27027 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation, to Discuss NRC Staff'S Request for Additional Information on Licensee'S Proposed Main Steam and Feedwater Isolation System Modification in Its Application Dated March 14, 2007 Project stage: RAI ML0731000102007-12-0707 December 2007 Request for Additional Information for the Main Stream and Feedwater Isolation System Modification (Tac No. MD4839) Project stage: RAI ML0729700242008-03-0303 March 2008 Issuance of License Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Approval ML0729700282008-03-0303 March 2008 Tech Spec Pages for Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Other ML0809801342008-04-16016 April 2008 Withholding from Public Disclosure, CS Innovations, 6101-00007, Msfis Instruction, Operation, and Maintenance Manual, Revision 1, Submitted March 14, 2008 Project stage: Other ML0809802612008-06-23023 June 2008 Wolf Creek,Request for Withholding Information from Public Disclosure in Als Architecture Evaluation and Sfis D3 Assessment Submitted February 28, 2008 Project stage: Withholding Request Acceptance ML0822703012008-07-29029 July 2008 CS Innovations Report 6002-00026, Rev. 1, Als Platform Overview, Non-Proprietary, Enclosure Viii Project stage: Request ML0822702982008-07-30030 July 2008 CS Innovations Report 6002-00002, Rev. 2, Als Configuration Management Plan, Non-Proprietary, Enclosure II Project stage: Request ML0822702962008-07-31031 July 2008 Transmitted of Resubmittal of Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0809802352008-08-18018 August 2008 Request for Withholding Information from Public Disclosure, Three Proprietary Documents, Affidavit Dated July 29, 2008, Executed by S. Sorenson, CS Innovations, LLC Project stage: Withholding Request Acceptance ML0902708252009-01-0909 January 2009 Enclosure II to Wm 09-0001, Msfis D3 Assessment, Rev 2 Project stage: Request ML0902708232009-01-14014 January 2009 Wolf Creek, Enclosure Iii to Wm 09-0001, Operation Plan, Rev 2 Project stage: Request WM 09-0001, Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-16016 January 2009 Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Response to RAI ML0902704262009-01-16016 January 2009 Wolf Creek, Enclosures Viii & Xxviii to Wm 09-0001 - CS Innovations Report 6002-00026, Als Platform Overview, Rev 2 Project stage: Request ET 09-0005, Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-29029 January 2009 Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0903406802009-02-0909 February 2009 Request for Withholding Information from Public Disclosure, Affidavit Executed by Steen Sorenson, CS Innovations LLC Project stage: Withholding Request Acceptance ET 09-0008, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-17017 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ET 09-0011, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-27027 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ML0906505542009-03-0606 March 2009 Decontrolled Letter, Draft Safety Evaluation for Modifications to the Main Steam and Feedwater Isolation Control System for Review of Proprietary Information Project stage: Draft Approval ML0906202032009-03-27027 March 2009 Request for Withholding Information from Public Disclosure, WCGS Letter Dated 2/17/2009 Project stage: Withholding Request Acceptance ML0906103172009-03-31031 March 2009 Issuance of Amendment No. 181, Revise Licensing Basis, Modification of the Main Steam and Feedwater Isolation System Controls Project stage: Approval 2007-08-08
[Table View] |
|
---|
Category:Letter type:ET
MONTHYEARET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen2023-03-16016 March 2023 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0011, Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface2022-05-31031 May 2022 Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0003, CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads2022-04-0606 April 2022 CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads ET 22-0002, Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .2022-04-0404 April 2022 Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ET 21-0015, Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-20020 October 2021 Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0011, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-10-0101 October 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0008, Operating Corporation Update for Full Implementation of Open Phase Detection System2020-05-20020 May 2020 Operating Corporation Update for Full Implementation of Open Phase Detection System ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0018, Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-08-22022 August 2019 Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0014, lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 12019-08-15015 August 2019 lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ET 18-0032, Operating Corporation Change of Date for Full Implementation of Open Phase Detection System2018-12-0707 December 2018 Operating Corporation Change of Date for Full Implementation of Open Phase Detection System ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0013, Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld2018-05-0202 May 2018 Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0010, Financial Protection Levels2018-03-29029 March 2018 Financial Protection Levels ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0005, Withdrawal of License Amendment Request for Revision to the Emergency Plan2018-02-0505 February 2018 Withdrawal of License Amendment Request for Revision to the Emergency Plan ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term 2023-05-17
[Table view] |
Text
WeLF CREEKrNUCLEAR OPERATING CORPORATION Terry J. Garrett August 31, 2007 Vice President, Engineering ET 07-0039 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter ET 07-0004, dated March 14, 2007, from T. J. Garrett, WCNOC, to USNRC
- 2) Letter ET 07-0008, dated April 18, 2007, from T. J. Garrett, WCNOC, to USNRC
- 3) Letter ET 07-0013, dated May 9, 2007, from T. J. Garrett, WCNOC, to USNRC
- 4) Letter dated May 29, 2007, from J. W. Lubinski, USNRC, to R. A. Muench, WCNOC
- 5) Letter ET 07-0022, dated June 15, 2007, from T. J. Garrett, WCNOC, to USNRC
- 6) Letter dated August 8, 2007, from J. W. Lubinski, USNRC, to R. A. Muench, WCNOC
Subject:
Docket No. 50-482: Response to NRC Letter dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Gentlemen:
Reference 1 provided a license amendment request that proposed revisions to Technical Specification (TS) 3.3.2, "Engineered Safety Feature Actuation System (ESFAS)
Instrumentation," TS 3.7.2, "Main Steam Isolation Valves (MSIVs)," and TS 3.7.3, "Main Feedwater Isolation Valves (MFIVs)." Reference 1 proposed changes to these specifications based on a planned modification to replace the MSIVs and associated actuators, MFIVs and associated actuators, and replacement of the Main Steam and Feedwater Isolation System (MSFIS) controls. References 2 and 3 provided supplemental information requested by the NRC.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNEF A0o0
ET 07-0039 Page 2 of 4 On May 17, 2007, WCNOC personnel met with the NRC staff to discuss the information needed for the staff review of the MSFIS controls modification. Subsequently, Reference 4 provided the results of the May 17, 2007 meeting and the supplemental information needed for the staff to begin its review of the MSFIS controls portion of Reference 1. Reference 5 provided responses to the request for supplemental information in Reference 4 and available supporting documentation. On August 2, 2007, WCNOC personnel met with the NRC to discuss five issues identified by the NRC staff associated with the review of the MSFIS controls modification. Subsequently, Reference 6 provided the results of the meeting and requested WCNOC to respond to the five issues. Attachment I provides WCNOC's response to these items.
During the August 2, 2007, meeting, the NRC staff stated that the review of the MSFIS controls portion of the license amendment request would be completed in Fall 2008 at the earliest.
WCNOC continues to pursue this change for implementation during the Spring 2008 refueling outage and will continue to be responsive to requests for information to support this refueling outage.
Enclosure III provides the proprietary CS Innovations LLC Report 6000-00010, "ALS Design Tools," Revision 0.95. As Enclosure III contains information proprietary to CS Innovations LLC, it is supported by an affidavit signed by CS Innovations LLC, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390 of the Commission's regulations. Accordingly, it is respectfully requested that the information, which is proprietary to CS Innovations, be withheld from public disclosure in accordance with 10 CFR 2.390 of the Commission's regulations. This affidavit, along with a CS Innovations LLC authorization letter, 9100-00012, "Application for Withholding Proprietary Information from Public Disclosure," is contained in Enclosure IV.
WCNOC is only providing a proprietary version of Enclosure III as a non-proprietary version would be of no value to the public due to the extent of the proprietary information.
The supplemental information provided in Attachment I and the Enclosures do not impact the conclusions of the No Significant Hazards Consideration provided in the Reference. In accordance with 10 CFR 50.91, a copy of the submittal (without Enclosures) is being provided to the designated Kansas State official.
ET 07-0039 Page 3 of 4 Attachment II provides a list of commitments made in this letter. If you have any questions concerning this matter, please contact me at (620) 364-4084, or Mr. Kevin Moles at (620) 364-4126.
Terry J. Garrett TJG/rlt Attachments: I Response to NRC Letter Regarding the Main Steam and Feedwater Isolation System (MSFIS) Controls Modification II List of Commitments
Enclosures:
Nutherm International Dedication Plan WCN-9715DP, Revision 2 IIl MSFIS Controls Replacement Project Plan, Revision 2 IV III CS Innovations LLC Report 6000-00010, "ALS Design Tools," Revision 0.95 CS Innovations LLC Letter 9100-00012, "Application for Withholding Proprietary Information from Public Disclosure" cc: T. A. Conley (KDHE), w/a, wo/e J. N. Donohew (NRC), w/a, w/e V. G. Gaddy (NRC), w/a, w/e B. S. Mallett (NRC), w/a, w/e Senior Resident Inspector (NRC), w/a, w/e
ET 07-0039 Page 4 of 4 STATE OF KANSAS )
COUNTY OF COFFEY )
Terry J. Garrett, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
~y-(
Terry J. arrett Vice Pre'ident Engineering SUBSCRIBED and sworn to before me this 31'day of /dagLtF20o7.
RRJNALTHONDA L.TIEM EVER
-OFFICIALs M I
- SEAL :, MY COMMISSION EXPIRES Notary Public January 11, 2010 Expiration Date 212/6*
Attachment I to ET 07-0039 Page 1 of 6 Response to NRC Letter Regarding the Main Steam and Feedwater Isolation System (MSFIS) Controls Modification On August 2, 2007, Wolf Creek Nuclear Operating Corporation (WCNOC) personnel met with the Nuclear Regulatory Commission (NRC) staff to discuss five issues identified by the NRC associated with the review of the MSFIS controls modification. Subsequently, the NRC issued a letter dated August 8, 2007, in which the NRC staff accepted the MSFIS controls modification license amendment request for review. The NRC staff indicated that the acceptance of review and the schedule to complete the review is conditional on WCNOC providing timely and acceptable responses to the first two items below. The five NRC issues are italicized.
- 1. The standard which the licensee chose to use to develop this system, RTCA DO-254/EUROCAE ED-80, "Design Assurance Guidance for Airborne Electronic Hardware," has not been reviewed or approved for nuclear safety-related use at nuclearpower plants by the NRC staff At this point, the licensee should provide a detailed mapping of this standard to an NRC-approved standard such as the Institute of Electrical and Electronic Engineers (IEEE)
Standard 7-4.3.2, and show on a paragraph-by-paragraphbasis what portion of standardRTCA DO-2541EUROCAE ED-80 has similar requirements, and why meeting that portion of RTCA DO-2541EUROCAE ED-80 will satisfy the corresponding section of the approved IEEE standard. There may be sections of the approved standard which are not applicable to an FPGA design, and these should be pointed out and justified. The NRC staff should receive the results of this task by September 20, 2007, as the licensee agreed to in the August 2, 2007, meeting. If this date is not met or the quality of the information is not sufficient, our acceptance of the review of the proposedreplacement MSFIS will be retracted.
Response: A more detailed comparison of RTCA DO-254/EUROCAE ED-80, "Design Assurance Guidance for Airborne Electronic Hardware," to IEEE 7-4.3.2-2003, "IEEE Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Generating Stations," is being performed. As discussed at the August 2, 2007 meeting, WCNOC will provide this comparison by September 20, 2007.
- 2. The licensee appears not to understand what the NRC staff requires in its review of the proposed application of FPGAs in a safety-related system. In its application, in "Nutherm Dedication Plan for Replacement MSFIS System," Nutherm document number WCN-9715DP, the statement is made that "the MSFIS system is not a digital system in the strictest definition as it is not software based,....". Advanced Logic System (ALS) Level-I System Specification,"
CS Innovation document 6000-00000, states "The ALS does not utilize a microprocessorand therefore has no software component for the operation of the system. The concern for software common mode failures is eliminated by incorporatinga full hardware system which only uses proven design practicesand methodologies for implementation of the hardware."
The NRC staff has reviewed the licensee's discussion in its May 9, 2007, letter, which presents the licensee's position stated above that the replacement MSFIS with FPGAs is not a digital software-based system. As is stated in IEEE Standard 100-2000, "The Authoritative Dictionary of IEEE Standards Terms," the term "digital"is defined as "pertainingto quantities in the form of discrete, integral values," and a "digital device" is defined as "A device that operates on the basis of discrete numerical techniques in which the variables are representedby coded pulses or states." Because the proposed FPGA system uses digital values, the NRC staff concludes that it is, therefore, a digital system.
Attachment I to ET 07-0039 Page 2 of 6 Furthermore, the replacement MSFIS is a software-based system. One of the definitions of "software"in the same IEEE standardis "The programs, procedures, rules, and any associated documentation pertainingto the operation of an information processing system." The nature of an FPGA is also that the device is programmed to perform its intended functions, and that programmingis done using a variety of software tools. While it is true that the output of these tools is used to flash the FPGA into its intended configuration rather than being used as a program to tell a microprocessorwhat to do, in either case the device is subject to programming and uses software tools to achieve its design objectives. Based on this, the NRC staff concludes that the proposed FPGA system is a software-based digital system and must be reviewed on that basis.
Based on the definitions in the IEEE standards and the NRC staff's understanding of FPGA devices discussed above, the NRC staff concludes that the FPGA system proposed by the licensee is a software-based digital system, which must rely on high-quality software to meet its design objectives. Acknowledgment by the license that the proposed FPGA system is a software-based digital system, which must meet the requirements discussed during meetings with the NRC, should be received by September 4, 2007, as agreed to in the August 2, 2007, meeting. If this date is not met or the quality of the information is not sufficient, our acceptance of the review of the proposed replacement MSFIS will be retracted.
Response: WCNOC letter ET 07-0013 concluded that the Advanced Logic System (ALS) that is utilized for the MSFIS controls is a digital system as described in IEEE 100-2000, "Authoritative Dictionary of IEEE Standards Terms." Letter ET 07-0013 further stated that the ALS is not considered to be a digital computer-based instrumentation and control system.
Further clarification of this statement is that there are no microprocessors utilized in the ALS or MSFIS controls and there is no software installed in or on the equipment and therefore, the system is not software-driven. WCNOC agrees that there is high quality software utilized in the FPGA logic development process, as well as in the circuit design, board design, and build process. As such, WCNOC acknowledges that this FPGA-based system is a software-based digital system only from the standpoint that there is high quality software utilized in the FPGA logic development process. The MSFIS equipment to be installed at WCGS is a hardware-driven system. The hardware-driven system is hardwired logic that consists of a group of logic circuits permanently interconnected to perform a specified function. WCNOC is interpreting the statement "which must meet the requirements discussed during meeting with the NRC" to mean that agreement was reached that the system is software-based digital system and that the FPGA-based system would be required to meet the appropriate criteria of IEEE 7-4.3.2-2003. As discussed in the response to Question #1 above, WCNOC is developing a detailed comparison of IEEE 7-4.3.2-2003 to RCTA DO-254 to identify the appropriate criteria of IEEE 7-4.3.2-2003 that is applicable to an FPGA-based safety related system.
Additionally, as discussed in letter ET 07-0013, WCNOC does not intend to maintain the capability onsite to modify the logic design in the FPGA and any change to the logic design would be contracted to a qualified vendor following the established design change process.
However, as discussed with the NRC staff in a teleconference on August 23, 2007, WCNOC does intend to maintain the capability to utilize spare boards that could be built onsite using the approved logic design.
Attachment I to ET 07-0039 Page 3 of 6
- 3. Nutherm International, the commercial grade dedication contractor, chose to use Electric Power Research Institute (EPRI )topical report NP-5652, "Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications," as its guideline for commercial grade dedication for the FPGA system, ratherthan EPRI TR-106439, "Guideline on Evaluation and Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Applications" or EPRI TR-107330, "Generic Requirements Specification for Qualifying a Commercially Available PLC for Safety-Related Applications in Nuclear Power Plants." As a result, the dedication was by test and inspection only, and no evaluation of the quality of the design effort was made. The commercial dedication process will need to be redone, with an emphases on high-quality design and lifecycle process is required in addition to the V&V and testing already done. The following documentation needs to be revised:
- a. MSFIS Controls Replacement ProjectPlan, Revision I
- b. Nutherm InternationalDedication Plan WCN-9715DP, Revision 1
- c. Nutherm InternationalQuality Assurance Plan (WCN-9175QAP), Revision 0
- d. Nutherm Internationaldedication procedures and reports.
Response: Nutherm International developed the Dedication Plan WCN-9715DP, Revision 0 and Revision 1, based on the guidelines in EPRI TR-106439, "Guideline on Evaluation and Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Applications," which supplements EPRI NP-5652, "Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications." The Critical Characteristic Matrix (starting on page 8 of WCN-9715DP, Revision 1) was based, in part, on Table 4.1, "Critical Characteristics Matrix for Digital Equipment," and Table 6-4, "ESFAS Programmable Logic Controller Characteristics") in EPRI TR-106439. However, the Critical Characteristic Matrix in WCN-9715DP, Revision 1, does not comprehensively explain some of the processes being undertaken by Nutherm International to complete the dedication process.
The Nutherm International Dedication Plan WCN-9715DP, Revision 1, page 6, states:
The critical characteristics are divided into three general categories: Product Information, Physical Attributes, and Performance. EPRI TR-106439 incorporated Product Information in the Physical Attributes categories and added Dependability. Though the MSFIS system is not software based, many of the critical characteristics and dedication activities described in EPRI TR-106439 are applicable and have been incorporated into the Dedication Plan.
EPRI TR-106439, Section 1.2, states:
The guidance in this document is intended for use by utilities or by other organizations who perform dedication of commercial grade equipment which ultimately is supplied to utilities.
The approach taken in developing this guidance is based on the conclusions reached by the working group that: (1) the existing process for commercial grade dedication can, with appropriate supplemental guidance, be applied to digital equipment, and (2) supplemental guidance provided for digital-specific issues should be consistent with the existing framework established for design and
Attachment I to ET 07-0039 Page 4 of 6 licensing of digital upgrades. Accordingly, this document supplements and is consistent with existing industry guidance contained in:
- EPRI NP-5652, "Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications,"
- EPRI TR-102348, "Guideline on Licensing Digital Upgrades," and
- IEEE 7-4.3.2-1993, "Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Generating Stations."
The Dedication Plan specifies that all four acceptance methods will be used during the dedication process. Special Tests and Inspections (Method 1) include a detailed Final Acceptance Test and component and parts verification inspections. Commercial Grade Surveys of Supplier (Method 2) are ongoing as Nutherm works with CS Innovations and Wolf Creek through the fabrication process. Source Verification (Method 3) will occur during witnessed system acceptance testing of the finished product at CS Innovations. Acceptable Supplier/Item Performance Record (Method 4) was utilized during the review of the field programmable gate array (FPGA) device and associated software tools chosen for the modification to the MSFIS controls. It is recognized that the Dedication Plan contains a large number of tests and inspections. The test regime was developed through a line-by-line review of the WCNOC Specification J-105(Q) for Replacement MSFIS System, Rev. 2, with requirements translated into tests or inspections. The quantity of tests could lead one to misunderstand the emphasis being placed on other activities. Nutherm International has revised the Dedication Plan to "unpack" some of the Critical Characteristics listed in the matrix and more comprehensively explain some of the processes being undertaken. Nutherm International Dedication Plan WCN-9715DP, Revision 2, is provided in Enclosure I to this letter.
EPRI TR-106439 recognizes that built-in quality is best assured through close interaction between the manufacturer and the utility/dedicating entity. During the design and fabrication process, there has been frequent interaction between CS Innovations, WCNOC, Nutherm International, and Baseline Engineering through periodic teleconference calls (typically weekly) and site visits. WCNOC letter ET 07-0013 indicated that Nutherm International has reviewed design documentation and activities of CS Innovations' level of design and build quality in the initial design. Nutherm at the CS Innovations offices has conducted various activities, including commercial grade surveys and surveillances, during the following time periods:
5/1/06 - 5/2/06 7/6/06 - 7/7/06 5/14/07 - 5/16/07 7/23/07 - 7/27/07 8/13/07 - 8/15/07 Nutherm International has performed thread audits during the system acceptance testing conducted at CS Innovations during August 2007. Documentation of the commercial grade dedication activities will be provided in the final dedication report that is scheduled for completion in early November 2007. WCNOC will submit the Nutherm International Final Dedication Report by November 30, 2007.
Attachment I to ET 07-0039 Page 5 of 6 A review of the Nutherm International Quality Assurance Plan (WCN-9175QAP), Revision 0, determined that this plan adequately describes the dedication activities being accomplished through a combination of inspection, testing, survey, and source inspections using the guidance of EPRI NP-5652 and EPRI TR-106439.
WCNOC has revised the MSFIS Controls Replacement Project Plan to indicate that the Qualification and Dedication Contractor is responsible for providing a dedication plan based on the guidelines in EPRI TR-106439, "Guideline on Evaluation and Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Applications," which supplements EPRI NP-5652, "Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications." The MSFIS Controls Replacement Project Plan, Revision 2, is provided in Enclosure II to this letter.
WCNOC will be performing a Part 50 Appendix B audit of CS Innovations in September 2007.
The performance based supplier audit focuses on the supplier's in-process activities that are needed to reach a conclusion about whether items produced by the supplier's process will perform their intended function.
WCNOC also intends to perform a supplier quality surveillance of the Nutherm International commercial grade dedication of the MSFIS controls. This surveillance is not required to qualify Nutherm International to perform commercial grade dedication activities for WCNOC. Nutherm is a supplier with a Quality Assurance Program meeting the requirements of 10CFR50, Appendix B; the Nuclear Utilities Procurement Committee (NUPIC) has audited the Nutherm Quality Assurance Program. WCNOC has reviewed and accepted the NUPIC audit and has found Nutherm to be acceptable to perform commercial grade dedication activities for WCNOC.
The commercial dedication process is not required to be redone as suggested in the question, as there has been specific emphasis on ensuring a high quality design and life cycle process.
- 4. The licensee's diversity and defense-in-depth analysis submitted in the June 15, 2007, letter is insufficient. This is the document The conclusion of this document is that no diversity or defense-in-depth is needed since "employment of the [RTCA] DO-254 design guidelines by CS Innovations has resulted in a high quality design," and "the replacement MSFIS system performs at an equivalent level and in several cases provides improved performance resulting in the replacement MSFIS providing increased reliability over the existing MSFIS controls." A new diversity and defense-in-depth analysis will be required, where for each anticipated operationaloccurrence or postulated accident in the design basis occurring in conjunction with each single postulated common-cause failure, the plant response calculated using best-estimate (realistic assumptions) analyses should not result in unacceptable consequences.
The licensee will need to demonstrate that sufficient diversity exists to achieve these goals, or to identify the vulnerabilities discovered and show that the corrective actions were taken, including adding a diverse system if necessary.
Response: WCNOC will develop a new Diversity and Defense-in-Depth Analysis where for each anticipated operational occurrence or postulated accident in the design basis occurring in conjunction with each single postulated common-cause failure, the plant response calculated using best-estimate (realistic assumptions) analyses should not result in unacceptable consequences. WCNOC intends to demonstrate in the analysis that sufficient diversity exists to
Attachment I to ET 07-0039 Page 6 of 6 achieve these goals. The Diversity and Defense-in Depth Analysis will be submitted to the NRC by December 12, 2007.
- 5. The licensee's LAR does not appearto conform with the requirement that software tools be qualified. Approved Standard IEEE 7-4.3.2 defines software tools in section 3.1.42: "A computer program used in the development, testing, analysis, or maintenance of a program or its documentation. Examples include comparator, cross-reference generator, decompiler, driver, editor, flowcharter, monitor, test case generator, and timing analyzer." Section 5.3.2, "Software tools," requires that "Software tools used to support software development processes and verification and validation (V&V) processes shall be controlled under configuration management," and "A test tool validation program shall be developed to provide confidence that the necessary features of the software tool function as required." There are similar requirements in RTCA DO-254/EUROCAE ED-80, "Design Assurance Guidance for Airborne Electronic Hardware." Section 11.4, "Tool Assessment and Qualification,"requires that "Priorto use of a tool, a tool assessment should be performed. The results of this assessment and, if necessary, tool qualification should be recorded and maintained." The licensee will need to demonstrate that the software tools were qualified for the development of safety-related systems.
Response: Letter ET 07-0008, Enclosure XII, provided the CS Innovations report entitled "ALS Design Tools." This report provided an overview of the tools used in the CS Innovations design, development and production process. In letter ET 07-0022, the response to Question
- 1F, discussed the tools used by CS Innovations and some basis behind the selection of the tools.
Based on discussions during the NRC site visit to CS Innovations during the week of July 23, 2007, the "ALS Design Tools" report was revised to include additional details as to why the tools are suitable for this application and why these specific tools were selected, and CS Innovations experience with these tools. Enclosure III to this letter provides the revised document.
Attachment II to ET 07-0039 Page 1 of 1 LIST OF COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation in this document. Any other statements in this letter are provided for information purposes and are not considered regulatory commitments. Please direct questions regarding these commitments to Mr. Kevin Moles, Manager Regulatory Affairs at Wolf Creek Generating Station, (620) 364-4126.
REGULATORY COMMITMENT DUE DATE As discussed at the August 2, 2007 meeting, WCNOC will 9/20/2007 provide a detailed comparison of RTCA DO-254 to IEEE 7-4.3.2-2003 by September 20, 2007.
WCNOC will submit the Nutherm International Final Dedication 11/30/2007 Report by November 30, 2007.
The Diversity and Defense-in Depth Analysis will be submitted to 12/12/2007 the NRC by December 12, 2007.