Letter Sequence Draft Approval |
---|
TAC:MD4839, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0708001982007-03-13013 March 2007 9100-00003-NP, Rev. 1, Wolf Creek Generating Station Main Steam and Feedwater Isolation System (Msfis) Controls Summary. Project stage: Request ET 07-0004, Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement2007-03-14014 March 2007 Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement Project stage: Request ET 07-0008, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-04-18018 April 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0712204892007-05-0303 May 2007 Meeting Notice - LAR to Upgrade the Main Steam and Feedwater Isolation System (Msfis) Project stage: Meeting ET 07-0013, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls2007-05-0909 May 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls Project stage: Response to RAI ML0713703642007-05-17017 May 2007 Handout for Meeting with Wolf Creek Nuclear Operating Corporation on the Licensee'S Application for the Main Steam and Feedwater Isolation System (Msfis) Modification Project stage: Meeting ML0713805112007-05-29029 May 2007 Acceptance Review of Licensee'S Application for Main Steam and Feedwater Isolation System Controls Modification Project stage: Acceptance Review ML0713805102007-06-0404 June 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station on License Application Request to Update Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0022, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-06-15015 June 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0717900072007-07-18018 July 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Licensee'S License Amendment Request Dated March 14, 2006, to Modify the Main Steam and Feedwater Isolation System Project stage: Meeting ML0721501532007-08-0202 August 2007 NRC Staff Handout for August 2, 2007, Meeting with Wolf Creek Nuclear Operating Corporation Project stage: Meeting ML0717900062007-08-0808 August 2007 Completion of Acceptance Review of Request to Modify the Main Stream and Feedwater Isolation System Project stage: Acceptance Review ML0722109412007-08-14014 August 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation Discussed on Description and Justification of Its Proposed Modification of the Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0039, Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-08-31031 August 2007 Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0724200172007-09-11011 September 2007 Request for Withholding Information from Public Disclosure in CS Innovations Topical Report 9100-00003-P for the Wolf Creek Generating Station Project stage: Withholding Request Acceptance ET 07-0041, Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-09-20020 September 2007 Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0725503102007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Report Submitted August 31, 2007 Project stage: Withholding Request Acceptance ML0724201352007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in Three CS Innovations Topical Reports Submitted April 18, 2007 for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502832007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Documents Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502682007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502012007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted April 18, 2007, for Wolf Creek Generating Station (Tac No. MD4839) Project stage: Withholding Request Acceptance ML0732001042007-11-16016 November 2007 Notice of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation to Discuss Main Steam and Feedwater Isolation System (Tac No. MD4839) Project stage: Meeting ML0733103642007-11-27027 November 2007 Revised Notice of Meeting with Wolf Creek Nuclear Operating Corp, to Discuss NRC Staff'S Request for Information on Licensee'S Supplemental Letter Dated September 27, 2007, to the Application Dated February 21, 2006, to Revise TS 5.5.9 Project stage: RAI ML0733101982007-11-27027 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation, to Discuss NRC Staff'S Request for Additional Information on Licensee'S Proposed Main Steam and Feedwater Isolation System Modification in Its Application Dated March 14, 2007 Project stage: RAI ML0731000102007-12-0707 December 2007 Request for Additional Information for the Main Stream and Feedwater Isolation System Modification (Tac No. MD4839) Project stage: RAI ML0729700242008-03-0303 March 2008 Issuance of License Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Approval ML0729700282008-03-0303 March 2008 Tech Spec Pages for Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Other ML0809801342008-04-16016 April 2008 Withholding from Public Disclosure, CS Innovations, 6101-00007, Msfis Instruction, Operation, and Maintenance Manual, Revision 1, Submitted March 14, 2008 Project stage: Other ML0809802612008-06-23023 June 2008 Wolf Creek,Request for Withholding Information from Public Disclosure in Als Architecture Evaluation and Sfis D3 Assessment Submitted February 28, 2008 Project stage: Withholding Request Acceptance ML0822703012008-07-29029 July 2008 CS Innovations Report 6002-00026, Rev. 1, Als Platform Overview, Non-Proprietary, Enclosure Viii Project stage: Request ML0822702982008-07-30030 July 2008 CS Innovations Report 6002-00002, Rev. 2, Als Configuration Management Plan, Non-Proprietary, Enclosure II Project stage: Request ML0822702962008-07-31031 July 2008 Transmitted of Resubmittal of Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0809802352008-08-18018 August 2008 Request for Withholding Information from Public Disclosure, Three Proprietary Documents, Affidavit Dated July 29, 2008, Executed by S. Sorenson, CS Innovations, LLC Project stage: Withholding Request Acceptance ML0902708252009-01-0909 January 2009 Enclosure II to Wm 09-0001, Msfis D3 Assessment, Rev 2 Project stage: Request ML0902708232009-01-14014 January 2009 Wolf Creek, Enclosure Iii to Wm 09-0001, Operation Plan, Rev 2 Project stage: Request WM 09-0001, Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-16016 January 2009 Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Response to RAI ML0902704262009-01-16016 January 2009 Wolf Creek, Enclosures Viii & Xxviii to Wm 09-0001 - CS Innovations Report 6002-00026, Als Platform Overview, Rev 2 Project stage: Request ET 09-0005, Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-29029 January 2009 Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0903406802009-02-0909 February 2009 Request for Withholding Information from Public Disclosure, Affidavit Executed by Steen Sorenson, CS Innovations LLC Project stage: Withholding Request Acceptance ET 09-0008, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-17017 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ET 09-0011, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-27027 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ML0906505542009-03-0606 March 2009 Decontrolled Letter, Draft Safety Evaluation for Modifications to the Main Steam and Feedwater Isolation Control System for Review of Proprietary Information Project stage: Draft Approval ML0906202032009-03-27027 March 2009 Request for Withholding Information from Public Disclosure, WCGS Letter Dated 2/17/2009 Project stage: Withholding Request Acceptance ML0906103172009-03-31031 March 2009 Issuance of Amendment No. 181, Revise Licensing Basis, Modification of the Main Steam and Feedwater Isolation System Controls Project stage: Approval 2007-08-08
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] |
Text
OFFICIAL USE ONLY PROPRIETARY INFORMATION \ ;~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 IVlarch 6 I 2009 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION - DRAFT SAFETY EVALUATION FOR MODIFICATIONS TO THE MAIN STEAM AND FEEDWATER ISOLATION CONTROL SYSTEM (TAC NO. MD4839)
Dear Mr. Muench:
By letter dated March 14, 2007, as supplemented by letters dated April 18, May 9, June 15, August 31, September 12 and 20, October 16, November 16, two letters dated December 14, and December 18, 2007; two letters dated January 18, January 31, February 26, and 28, March 14, April 26, May 14, June 19, and July 31, 2008; and January 16 and 29, and February 17 and 27, 2009, Wolf Creek Nuclear Operating Corporation (WCNOC) submitted a license amendment request (LAR) to the U.S. Nuclear Regulatory Commission (NRC) staff for review. Enclosed for WCNOC review and comment is a copy of the NRC staffs draft safety evaluation (SE) for the LAR.
Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have determined that the enclosed draft SE does not contain proprietary information. However, we will delay placing the draft SE in the public document room for a period of 10 working days from the date of this letter to provide you with the opportunity to comment on any proprietary aspects.
If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. After 10 working days, the draft SE will be made publicly available, and an additional 10 working days are provided to you to comment on any factual errors or clarity concerns contained in the draft SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staffs disposition of your comments on the draft SE will be discussed in the final SE.
To facilitate the NRC staffs review of your comments, please provide a marked-up copy of the SE showing proposed changes and provide a summary table of the proposed changes.
The Enclosure contains Proprietary Information. Upon separation from the Enclosure. this letter is decontrolled.
!1 \UZ OFFICIAL USE ONLY PROPRIETARY INFORMATION '\\r'
~\,)
OFFICIAL USE ONLY PROPRIETARY INFORMATION Y R. Muench -2 If you have any questions. please contact me at 301-415-3016.
Sincerely, b O\.-l~t lL--~~J Balwant K. Singell. Senior Project ~an-ager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosure:
Draft Safety Evaluation cc wlo proprietary encl: See next page tt))
OFFICIAL USE ONLY PROPRIETARY INFORMATION
Wolf Creek Generating Station (12/10/2008) cc:
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington. DC 20037 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd" Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839 Office of the Governor State of Kansas Topeka.KS 66612 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Supervisor. Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
'\(\L~
OFFICIAL USE ONLY PROPRIETARY INFORMATION R. Muench -2 If you have any questions, please contact me at 301-415-3016.
Sincerely, IRAI Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosure:
Draft Safety Evaluation cc wlo proprietary encl: See next page DISTRI BUlION:
NON-PUBLIC [No ope for 10 working days]
LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrEicb Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl4 Resource RidsNrrL.,AJBurkhardt Resource RidsNrrPMWolfCreek Resource RidsOgcRp Resource RidsRgn4MailCenter Resource Pkg ML090650549 Decontrolled Ltr ML090650554 ADAMS Accession No. ML090630169 DRAFT BE ML090650535 OFFICE NRRlLPL4/PM NRR/LPL4/LA NRRlEICB/BC NRRlLPL4IaC NRRlLPL4/PM NAME BSlngal ~,-t./~ JBurl<hardl Not Required MMarkley ~.- BSingal '\l...,'V_ ~
DATE 3/6/09 3/6/09 - 3/B/09 3/6/09 OFFICIAL RECORD COpy
~~b OFFICIAL USE ONLY PROPRIETARY INFORMATION