Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 May 9, 2013 10 CFR 50.54(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating Licensing No. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391

Subject:

Revised Commitments for the Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (ML12073A348)
2. NRC Letter, "Prioritization of Response Due Dates for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated May 11, 2012 (ML12097A509) 3V k6 Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 May 9, 2013

3. TVA Letter, "Tennessee Valley Authority (TVA) - Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 to the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2013 (ML13080A073)

On March 12, 2012, the NRC issued the Reference 1 letter to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 2 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses for Near Term Task Force (NTTF) Recommendation 2.1 associated with reevaluation of flooding hazards at nuclear power plants. In a letter dated May 11, 2012 (Reference 2), the NRC categorized Sequoyah Nuclear Plant (SQN) and Watts Bar Nuclear Plant (WBN) as "Category 1" plants and established a due date for submission of the flooding hazard reevaluation of March 12, 2013.

By letter dated March 12, 2013 (Reference 3), TVA requested an extension to the March 12, 2013 due date for the SQN and WBN HRRs to May 29, 2015. In the Reference 3 letter, TVA included information regarding (1) the reason for the delay, (2) a proposed schedule for the submittal of a complete Hazard Reevaluation Report, and (3) the basis for the acceptability of the revised schedule. TVA met with the NRC on April 29, 2013 to discuss details of the March 12, 2013, extension request.

The purpose of this letter is to revise Regulatory Commitments 1, 7, and 8 submitted in the March 12, 2013 extension request. Commitment 1 is revised to change reporting to the SQN and WBN NRC Project Managers the status of completed actions and progress to completing the HRRs from a 6-month status frequency to a quarterly status frequency.

These status reports will start in June 2013 rather than September 2013. The dates for Commitments 7 and 8, to provide the SQN and WBN HRRs to the NRC, are revised from May 29, 2015, to March 12, 2015.

The Enclosure of this letter contains the revised regulatory commitments 1, 7, and 8 originally submitted in Reference 3. These revised regulatory commitments supersede those submitted in Reference 3.

If you have questions regarding this matter, please contact Kevin Casey at (423) 751-8523.

U.S. Nuclear Regulatory Commission Page 3 May 9, 2013 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 9th day of May 2013.

Respe tfully, Shea ic President Nuclear Licensing Enclosure List of Revised Commitments cc (w/Enclosure):

NRC Regional Administrator - Region II NRR Director - NRC Headquarters NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRR Project Manager - Sequoyah Nuclear Plant NRR Project Manager - Watts Bar Nuclear Plant, Unit 1 NRR Project Manager - Watts Bar Nuclear Plant, Unit 2

ENCLOSURE LIST OF REVISED COMMITMENTS

1. TVA will provide quarterly status reports to the Sequoyah and Watts Bar Nuclear Plant NRC Project Managers to provide a status of completed actions and progress to completing the Hazard Reevaluation Reports starting in June, 2013. TVA will provide the status of the dam stability analysis work as part of the second quarterly status report to communicate any changes in the number of required simulations.
7. TVA will provide the Sequoyah Nuclear Plant Flooding Hazard Reevaluation Report to the NRC by March 12, 2015.
8. TVA will provide the Watts Bar Nuclear Plant Flooding Hazard Reevaluation Report to the NRC by March 12, 2015.

Note - the revised commitments above supersede Commitments 1, 7 and 8 submitted in TVA's Extension Request dated March 12, 2013.