Letter Sequence Other | |
---|---|
TAC:MD4556, (Open) | |
Initiation
Administration Questions
| |
MONTHYEARML0721104732007-08-0202 August 2007
[Table View]Conforming License Amendments to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4556) Project stage: Other ML0720800952007-08-0202 August 2007 Revised Pages of Facility Operating License No. NPF-47 Project stage: Other ML0722504332007-08-14014 August 2007 Corrected Facility Operating License Pg 6a 8/2/2007 Conforming License Amendment to Incorporate Mitigation Strategies Required by Section B.5.b of Commission Order EA-02-026 Project stage: Other ML0722504092007-08-14014 August 2007 Correction to Facility Operating License Pg 6a 8/2/2007 Conforming License Amendment to Incorporate Mitigation Strategies Required by Section B.5.b of Commission Order EA-02-026 Project stage: Other 2007-08-14 |
ML072250433 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 08/14/2007 |
From: | Bhalchandra Vaidya NRC/NRR/ADRO/DORL/LPLIV |
To: | |
Vaidya B, NRR/DORL/LP4, 415-3308 | |
Shared Package | |
ML072250350 | List: |
References | |
EA-02-026, TAC MD4556 | |
Download: ML072250433 (1) | |
Similar Documents at River Bend | |
---|---|
Category:- No Document Type Applies
MONTHYEARML21354A7602021-12-20020 December 2021
[Table view]Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18 ML21354A7462021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18 ML21354A7632021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18 ML21354A7612021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18 ML21354A7592021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18 ML21354A7572021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18 ML21354A7562021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18 ML21354A7492021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18 ML21021A1142021-01-21021 January 2021 FAQ 20-05 River Bend Uswc - Proposed NRC Response - Final ML20329A1452020-11-20020 November 2020 Terrapower'S QAPD Preliminary Questions ML20288A4042020-10-0909 October 2020 FAQ 20-05: RBS Unplanned Scram May 2019 ML21028A3472020-10-0909 October 2020 FAQ 20-05 River Bend Uswc - Tentatively Approved ML20055C8032020-02-20020 February 2020 Information Request February 20, 2020 River Bend Station NRC Inspection Report 05000458/2020412 ML18135A1072018-05-15015 May 2018 RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318 CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML15219A6672015-09-0404 September 2015 Tables 1 and 2 ML13322A8332013-11-25025 November 2013 Final ASP Analysis - River Bend Station ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1032600152010-11-22022 November 2010 Category 1 Public Meeting with Entergy Operations, Inc. to Discuss River Bend Preliminary Enforcement Attendees List ML1018304562010-06-29029 June 2010 Attachment Re :Clinton Sample Bases Page ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML1002209442009-03-30030 March 2009 Data Sheet for River Bend Station, Checklist for Step 1 Review ML1002209452009-03-30030 March 2009 Data Sheet for River Bend Station, Checklist for Step 1 Review ML0906404472009-03-0909 March 2009 Enclosure 13: Case Study 9: River Bend Shutdown as an Alternative to Other Actions - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions CNRO-2007-00038, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15)2007-09-24024 September 2007 Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0722504332007-08-14014 August 2007 Corrected Facility Operating License Pg 6a 8/2/2007 Conforming License Amendment to Incorporate Mitigation Strategies Required by Section B.5.b of Commission Order EA-02-026 ML0721104332007-07-25025 July 2007 Questions from 1 Through 8 ML0717700952007-05-10010 May 2007 Draft, Attachment to 5/10/07 E-Mail from Rwbyrd, Entergy, to Bvaidya, Nrr/Dorl/Lpliv, Enclosing Draft Response to Request for Additional Info Re LAR to Update LOCA Methodology ML0429905442004-09-23023 September 2004 RB-09-2004 - Final - Written Exam - RO ML0411703752004-04-0909 April 2004 Fire Area PT-1 Summary Table E. F & G Tunnels ML0329400652003-10-0707 October 2003 Fire Protection Issue at River Bend ML0329400672003-10-0707 October 2003 Fire Protection Issue at River Bend ML0329401042003-10-0707 October 2003 Riv Backfit Status ML0329400982003-03-27027 March 2003 Riv Backfit Status ML0230501072002-07-19019 July 2002 Attachment 4, River Bend, Executive Summary ML0230501062002-07-18018 July 2002 Attachment 3, River Bend, Human Performance Questions, 1.7% Power Uprate 2021-12-20 Category:License-Operating (New/Renewal/Amendments) DKT 50 MONTHYEARML24185A1522024-08-13013 August 2024
[Table view]Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22188A1742022-07-19019 July 2022 Issuance of Amendment No. 211 Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20339A5182021-01-0606 January 2021 Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19071A2992019-06-19019 June 2019 Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications ML19066A0082019-04-29029 April 2019 Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18360A0252019-01-17017 January 2019 Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature Limits ML18345A3422018-12-21021 December 2018 Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line ML18284A3692018-12-20020 December 2018 Renewed Facility Operating License NPF-47 ML18267A3412018-11-0707 November 2018 Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML16287A5992016-10-27027 October 2016 Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests Frequency ML16124A6882016-06-21021 June 2016 Issuance of Amendment No. 190 Cyber Security Plan Implementation Schedule ML15265A1162015-10-0101 October 2015 Issuance of Conforming Amendment to Reflect the Transfer of the Facility Operating License No. NPF-47 from Entergy Gulf States Louisiana, LLC to Entergy Louisiana, LLC ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML15071A4752015-03-19019 March 2015 Correction to License Amendment No. 185 Adoption of TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14225A4442014-12-12012 December 2014 Issuance of Amendment No. 183, Revise Technical Specification Surveillance Requirements Related to Ventilation Filter Testing Program for Heaters in Safety-Related Charcoal Filter Trains ML14304A1812014-12-12012 December 2014 Issuance of Amendment No. 184, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process ML13060A2102013-03-29029 March 2013 Issuance of Amendment No. 179, Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of Surveillance Requirement 3.3.8.1.3 and Revise Allowable Values of Certain Functions ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12261A4722012-12-0505 December 2012 Issuance of Amendment No. 177, Revise Physical Protection License Condition Related to Milestone No. 6 of the Cyber Security Plan Implementation ML12277A3082012-12-0505 December 2012 Issuance of Amendment No. 176, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III Bus ML12240A1802012-09-24024 September 2012 Issuance of Amendment No. 175, Emergency Plan Change to Relocate Alternate Emergency Operations Facility from 23 to 28 Miles from the Technical Support Center ML1210705572012-05-30030 May 2012 Issuance of Amendment No. 174, Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints ML1200902422012-02-0808 February 2012 Issuance of Amendment No. 173, Adopt Technical Specification Task Force (TSTF)-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML1124303342011-11-21021 November 2011 Issuance of Amendment No. 172, Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119402002011-07-29029 July 2011 Issuance of Amendment No. 171, Add License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1027901222011-01-0505 January 2011 Issuance of Amendment No. 170, Revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML1026405472010-10-21021 October 2010 Issuance of Amendment No. 169, Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel ML1023502662010-08-31031 August 2010 Issuance of Amendment No. 168, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals ML1002003142010-03-31031 March 2010 License Amendment, Revise Technical Specification 5.5.6, Inservice Testing Program, to Incorporate References to ASME Code for Operation and Maintenance of Nuclear Power Plants ML0924301452009-09-29029 September 2009 Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical Method ML0920103702009-08-11011 August 2009 License Amendment No. 165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-163, TSTF-220, TSTF-230, and TSTF-306 2024-08-13 |
Text
-6a- l (18) Mitigation Strategy License Condition l l
Licensee shall develop and maintain strategies for addressing large fires l and explosions and that include the following key areas: l l
(a) Fire fighting response strategy with the following elements: l
- 1. Pre-defined coordinated fire response strategy and l guidance l
- 2. Assessment of mutual aid fire fighting assets l
- 3. Designated staging areas for equipment and materials l
- 4. Command and control l
- 5. Training of response personnel l l
(b) Operations to mitigate fuel damage considering the following: l
- 1. Protection and use of personnel assets l
- 2. Communications l
- 3. Minimizing fire spread l
- 4. Procedures for implementing integrated fire response l strategy l
- 5. Identification of readily-available pre-staged equipment l
- 6. Training on integrated fire response strategy l
- 7. Spent fuel pool mitigation measures l l
(c) Actions to minimize release to include consideration of: l
- 1. Water spray scrubbing l
- 2. Dose to onsite responders l Revised by letter dated August 2, 2007