MONTHYEARML14153A3922014-06-0202 June 2014 NRR E-mail Capture - River Bend Station Recommendation 2.1 Flood Hazard Reevaluation Request for Additional Information Project stage: RAI RS-15-064, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report2015-03-12012 March 2015 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report Project stage: Request ML15093A3112015-03-16016 March 2015 NRR E-mail Capture - Request for Additional Information: Clinton Flooding Hazard Reevaluation Report Project stage: RAI ML16167A3252015-04-27027 April 2015 NRR E-mail Capture - Request for Additional Information: River Bend Station - Flooding Hazard Reevaluation Report Project stage: RAI RS-15-110, Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report2015-05-0505 May 2015 Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report Project stage: Response to RAI ML15148A2862015-07-21021 July 2015 Nuclear Regulatory Commission Plan for the Audit of Exelon Generation Company, Llc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 -Flooding Project stage: Other ML15219A6452015-09-0303 September 2015 Tables 1 and 2 Project stage: Other ML15212A0102015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Other ML15212A7272015-09-0404 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request Flood-Causing Mechanism Reevaluation Project stage: Other ML15219A6672015-09-0404 September 2015 Tables 1 and 2 Project stage: Request ML15279A1342015-10-27027 October 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request-Flood-Causing Mechanism Reevaluation Project stage: Other ML15321A0342015-11-18018 November 2015 Correction to Staff Assessment of Response to Request for Information Pursuant to 10 CFR 50.54(f)-Flood Causing Mechanisms Reevaluation Project stage: RAI RS-16-055, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-03-24024 March 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal Project stage: Other 2015-04-27
[Table View] |
|
---|
Category:- No Document Type Applies
MONTHYEARML21354A7602021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18 ML21354A7462021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18 ML21354A7632021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18 ML21354A7612021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18 ML21354A7592021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18 ML21354A7572021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18 ML21354A7562021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18 ML21354A7492021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18 ML21021A1142021-01-21021 January 2021 FAQ 20-05 River Bend Uswc - Proposed NRC Response - Final ML20329A1452020-11-20020 November 2020 Terrapower'S QAPD Preliminary Questions ML20288A4042020-10-0909 October 2020 FAQ 20-05: RBS Unplanned Scram May 2019 ML21028A3472020-10-0909 October 2020 FAQ 20-05 River Bend Uswc - Tentatively Approved ML20055C8032020-02-20020 February 2020 Information Request February 20, 2020 River Bend Station NRC Inspection Report 05000458/2020412 ML18135A1072018-05-15015 May 2018 RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318 CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML15219A6672015-09-0404 September 2015 Tables 1 and 2 ML13322A8332013-11-25025 November 2013 Final ASP Analysis - River Bend Station ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1032600152010-11-22022 November 2010 Category 1 Public Meeting with Entergy Operations, Inc. to Discuss River Bend Preliminary Enforcement Attendees List ML1018304562010-06-29029 June 2010 Attachment Re :Clinton Sample Bases Page ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML1002209442009-03-30030 March 2009 Data Sheet for River Bend Station, Checklist for Step 1 Review ML1002209452009-03-30030 March 2009 Data Sheet for River Bend Station, Checklist for Step 1 Review ML0906404472009-03-0909 March 2009 Enclosure 13: Case Study 9: River Bend Shutdown as an Alternative to Other Actions - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions CNRO-2007-00038, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15)2007-09-24024 September 2007 Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0722504332007-08-14014 August 2007 Corrected Facility Operating License Pg 6a 8/2/2007 Conforming License Amendment to Incorporate Mitigation Strategies Required by Section B.5.b of Commission Order EA-02-026 ML0721104332007-07-25025 July 2007 Questions from 1 Through 8 ML0717700952007-05-10010 May 2007 Draft, Attachment to 5/10/07 E-Mail from Rwbyrd, Entergy, to Bvaidya, Nrr/Dorl/Lpliv, Enclosing Draft Response to Request for Additional Info Re LAR to Update LOCA Methodology ML0429905442004-09-23023 September 2004 RB-09-2004 - Final - Written Exam - RO ML0411703752004-04-0909 April 2004 Fire Area PT-1 Summary Table E. F & G Tunnels ML0329400652003-10-0707 October 2003 Fire Protection Issue at River Bend ML0329400672003-10-0707 October 2003 Fire Protection Issue at River Bend ML0329401042003-10-0707 October 2003 Riv Backfit Status ML0329400982003-03-27027 March 2003 Riv Backfit Status ML0230501072002-07-19019 July 2002 Attachment 4, River Bend, Executive Summary ML0230501062002-07-18018 July 2002 Attachment 3, River Bend, Human Performance Questions, 1.7% Power Uprate 2021-12-20
[Table view] |
Text
River Bend, Unit 1 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Local Intense Precipitation Unit 1 96.0 ft MSL Not 96.0 ft MSL FHRR Table 4.1-1 applicable Unit 2 80.3 ft MSL Not 80.3 ft MSL FHRR Table 4.1-1 applicable Streams and Rivers West Creek PMF 94.3 ft MSL Not 94.3 ft MSL FHRR Table 4.1-4 applicable Mississippi River 54.5 ft MSL Not 54.5 ft MSL FHRR Table 4.1-1 applicable Grants Bayou 101.8 ft MSL Not 101.8 ft MSL FHRR Table 4.1-1 applicable Failure of Dams and Onsite Water Control/Storage Structures No impact on No impact on No impact on the site the site the site FHRR Table 4.1-1 identified identified identified Storm Surge No impact on No impact on No impact on the site the site the site FHRR Table 4.1-1 identified identified identified Seiche No impact on No impact on No impact on the site the site the site FHRR Table 4.1-1 identified identified identified Tsunami No impact on No impact on No impact on the site the site the site FHRR Table 4.1-1 identified identified identified
River Bend, Unit 1 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Ice-Induced Flooding No impact on No impact on No impact on the site the site the site FHRR Table 4.1-1 identified identified identified Channel Migrations/Diversions No impact on No impact on No impact on the site the site the site FHRR Table 4.1-1 identified identified identified Note: Reported values are rounded to the nearest one-tenth of a foot.
River Bend, Unit 1 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Local Intense Precipitation Unit 1 98.3 ft MSL Minimal 98.3 ft MSL FHRR Tables 4.1-1, 4.1-2 & 4.1-3 Streams and Rivers West Creek PMF 95.1 ft MSL Not 95.1 ft MSL FHRR Table 4.1-4 applicable Mississippi River 59.7 ft MSL Not 59.7 ft MSL FHRR Table 4.1-1 applicable Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA.
Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.
Note 3: Reported values are rounded to the nearest one-tenth of a foot.