ML072250409
| ML072250409 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/14/2007 |
| From: | Bhalchandra Vaidya NRC/NRR/ADRO/DORL/LPLIV |
| To: | Venable J Entergy Operations |
| Vaidya B, NRR/DORL/LP4, 415-3308 | |
| Shared Package | |
| ML072250350 | List: |
| References | |
| EA-02-026, TAC MD4556 | |
| Download: ML072250409 (3) | |
Text
August 14, 2007 Mr. Joseph E. Venable Vice President of Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - CORRECTION TO THE FACILITY OPERATING LICENSE PAGE 6a FOR ADMINISTRATIVE LICENSE AMENDMENT, DATED AUGUST 2, 2007, RE: CONFORMING LICENSE AMENDMENT TO INCORPORATE THE MITIGATION STRATEGIES REQUIRED BY SECTION B.5.b OF COMMISSION ORDER EA-02-026 (TAC NO. MD4556)
Dear Mr. Venable:
On August 2, 2007, the Nuclear Regulatory Commission (NRC, Commission) issued an administrative license amendment to Facility Operating License (FOL) No. NPF-47 for the River Bend Station, Unit 1 (RBS). The administrative license change incorporated Mitigation Strategy requirements of Section B.5.b of Commission Order EA-02-026, incorporated the agreed-upon license condition, and issued the new Page 6a to the FOL.
After issuing the amendment, the NRC staff noted that new Page 6a did not have the notation regarding the date of the issuance at the bottom of the page. Please discard the associated page from the administrative amendment, issued on August 2, 2007, and replace it with the enclosed page.
If you have any questions regarding this matter, please contact me at 301-415-3308.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
Page 6a of FOL No. NPF-47 cc w/encl: See next page
PKG ML072250350, LTR ML072250409, FOL Page ML072250433 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya JBurkhardt THiltz DATE 8/14/07 8/14/07 8/14/07
November 2006 River Bend Station cc:
Manager, Licensing Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director, Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312 Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 General Manager Plant Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director, Nuclear Safety Assurance Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9095 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497