Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21354A76020 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18
ML21354A74620 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18
ML21354A76320 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18
ML21354A76120 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18
ML21354A75920 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18
ML21354A75720 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18
ML21354A75620 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18
ML21354A74920 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18
ML21021A11421 January 2021FAQ 20-05 River Bend Uswc - Proposed NRC Response - Final
ML20329A14520 November 2020Terrapower'S QAPD Preliminary Questions
ML20288A4049 October 2020FAQ 20-05: RBS Unplanned Scram May 2019
ML21028A3479 October 2020FAQ 20-05 River Bend Uswc - Tentatively Approved
ML20055C80320 February 2020Information Request February 20, 2020 River Bend Station NRC Inspection Report 05000458/2020412
ML18135A10715 May 2018RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 201520 December 2016Entergy - Form 10-K for Fiscal Year Ended December 31, 2015High winds
Enforcement Discretion
Incorporated by reference
Aging Management
Earthquake
Environmental Justice
ML15219A6674 September 2015Tables 1 and 2
ML13322A83325 November 2013Final ASP Analysis - River Bend StationReactor Vessel Water Level
Ultimate heat sink
Significance Determination Process
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML10326001522 November 2010Category 1 Public Meeting with Entergy Operations, Inc. to Discuss River Bend Preliminary Enforcement Attendees List
ML10183045629 June 2010Attachment Re :Clinton Sample Bases Page
ML10193046025 March 2010List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants
ML10022094430 March 2009Data Sheet for River Bend Station, Checklist for Step 1 Review
ML10022094530 March 2009Data Sheet for River Bend Station, Checklist for Step 1 Review
ML0906404479 March 2009Enclosure 13: Case Study 9: River Bend Shutdown as an Alternative to Other Actions - Meeting Summary of the January 27 & 28 Meeting with Nrc/TstfSafe Shutdown
Unanalyzed Condition
Enforcement Discretion
Significance Determination Process
Coast down
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
CNRO-2007-00038, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15)24 September 2007Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15)
ML07263031914 September 2007P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List
ML07263011414 September 2007/ P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170
ML07225043314 August 2007Corrected Facility Operating License Pg 6a 8/2/2007 Conforming License Amendment to Incorporate Mitigation Strategies Required by Section B.5.b of Commission Order EA-02-026B.5.b Mitigating Strategies
ML07211043325 July 2007Questions from 1 Through 8Ultimate heat sink
Fuel cladding
ML07177009510 May 2007Draft, Attachment to 5/10/07 E-Mail from Rwbyrd, Entergy, to Bvaidya, Nrr/Dorl/Lpliv, Enclosing Draft Response to Request for Additional Info Re LAR to Update LOCA Methodology
ML04299054423 September 2004RB-09-2004 - Final - Written Exam - ROLoop seal
Half scram
Scram Discharge Volume
Earthquake
ML0411703759 April 2004Fire Area PT-1 Summary Table E. F & G TunnelsHot Short
Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Emergency Lighting
Exemption Request
Fire Protection Program
ML0329400657 October 2003Fire Protection Issue at River BendSafe Shutdown
Fire Barrier
Fire Protection Program
ML0329400677 October 2003Fire Protection Issue at River BendSafe Shutdown
Fire Barrier
Fire Protection Program
ML0329401047 October 2003Riv Backfit StatusBackfit
ML03294009827 March 2003Riv Backfit StatusBackfit
ML02305010719 July 2002Attachment 4, River Bend, Executive Summary
ML02305010618 July 2002Attachment 3, River Bend, Human Performance Questions, 1.7% Power UprateSafe Shutdown