Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21354A760 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18 | |
ML21354A746 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18 | |
ML21354A763 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18 | |
ML21354A761 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18 | |
ML21354A759 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18 | |
ML21354A757 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18 | |
ML21354A756 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18 | |
ML21354A749 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18 | |
ML21021A114 | 21 January 2021 | FAQ 20-05 River Bend Uswc - Proposed NRC Response - Final | |
ML20329A145 | 20 November 2020 | Terrapower'S QAPD Preliminary Questions | |
ML20288A404 | 9 October 2020 | FAQ 20-05: RBS Unplanned Scram May 2019 | |
ML21028A347 | 9 October 2020 | FAQ 20-05 River Bend Uswc - Tentatively Approved | |
ML20055C803 | 20 February 2020 | Information Request February 20, 2020 River Bend Station NRC Inspection Report 05000458/2020412 | |
ML18135A107 | 15 May 2018 | RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318 | |
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 | 20 December 2016 | Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 | High winds Enforcement Discretion Incorporated by reference Aging Management Earthquake Environmental Justice |
ML15219A667 | 4 September 2015 | Tables 1 and 2 | |
ML13322A833 | 25 November 2013 | Final ASP Analysis - River Bend Station | Reactor Vessel Water Level Ultimate heat sink Significance Determination Process |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML103260015 | 22 November 2010 | Category 1 Public Meeting with Entergy Operations, Inc. to Discuss River Bend Preliminary Enforcement Attendees List | |
ML101830456 | 29 June 2010 | Attachment Re :Clinton Sample Bases Page | |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
ML100220944 | 30 March 2009 | Data Sheet for River Bend Station, Checklist for Step 1 Review | |
ML100220945 | 30 March 2009 | Data Sheet for River Bend Station, Checklist for Step 1 Review | |
ML090640447 | 9 March 2009 | Enclosure 13: Case Study 9: River Bend Shutdown as an Alternative to Other Actions - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf | Safe Shutdown Unanalyzed Condition Enforcement Discretion Significance Determination Process Coast down |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
CNRO-2007-00038, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) | 24 September 2007 | Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) | |
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
ML072250433 | 14 August 2007 | Corrected Facility Operating License Pg 6a 8/2/2007 Conforming License Amendment to Incorporate Mitigation Strategies Required by Section B.5.b of Commission Order EA-02-026 | B.5.b Mitigating Strategies |
ML072110433 | 25 July 2007 | Questions from 1 Through 8 | Ultimate heat sink Fuel cladding |
ML071770095 | 10 May 2007 | Draft, Attachment to 5/10/07 E-Mail from Rwbyrd, Entergy, to Bvaidya, Nrr/Dorl/Lpliv, Enclosing Draft Response to Request for Additional Info Re LAR to Update LOCA Methodology | |
ML042990544 | 23 September 2004 | RB-09-2004 - Final - Written Exam - RO | Loop seal Half scram Scram Discharge Volume Earthquake |
ML041170375 | 9 April 2004 | Fire Area PT-1 Summary Table E. F & G Tunnels | Hot Short Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Fire Barrier Emergency Lighting Exemption Request Fire Protection Program |
ML032940065 | 7 October 2003 | Fire Protection Issue at River Bend | Safe Shutdown Fire Barrier Fire Protection Program |
ML032940067 | 7 October 2003 | Fire Protection Issue at River Bend | Safe Shutdown Fire Barrier Fire Protection Program |
ML032940104 | 7 October 2003 | Riv Backfit Status | Backfit |
ML032940098 | 27 March 2003 | Riv Backfit Status | Backfit |
ML023050107 | 19 July 2002 | Attachment 4, River Bend, Executive Summary | |
ML023050106 | 18 July 2002 | Attachment 3, River Bend, Human Performance Questions, 1.7% Power Uprate | Safe Shutdown |