Letter Sequence RAI |
---|
TAC:MD2587, (Open) TAC:MD2588, (Open) TAC:MD2589, (Open) TAC:MD2590, (Open) TAC:MD2591, (Open) TAC:MD2597, (Open) TAC:MD2609, (Open) TAC:MD2610, (Open) TAC:MD2611, (Open) TAC:MD2613, (Open) |
|
MONTHYEARML0704001462007-02-27027 February 2007 RAI for the Third 10-Year Interval Inservice Inspection Program, Relief Nos. RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, and RR-62 (TAC Nos. MD2587 Through MD2591, MD2597 and MD2609, MD2610 and MD2611) Project stage: RAI ML0713602972007-06-0505 June 2007 Relief, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request to Relief Nos. RR-42 Through RR-45, RR- 51, RR-58, RR-59, RR-60, & RR-62 Project stage: Other 2007-02-27
[Table View] |
RAI for the Third 10-Year Interval Inservice Inspection Program, Relief Nos. RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, and RR-62 (TAC Nos. MD2587 Through MD2591, MD2597 and MD2609, MD2610 and MD2611)ML070400146 |
Person / Time |
---|
Site: |
Hatch |
---|
Issue date: |
02/27/2007 |
---|
From: |
Martin R NRC/NRR/ADRO/DORL/LPLII-1 |
---|
To: |
Madison D Southern Nuclear Operating Co |
---|
Martin R, NRR/DORL, 415-1493 |
References |
---|
TAC MD2587, TAC MD2588, TAC MD2589, TAC MD2590, TAC MD2591, TAC MD2597, TAC MD2609, TAC MD2610, TAC MD2611, TAC MD2613 |
Download: ML070400146 (7) |
|
Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22073A0842022-03-21021 March 2022 an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20253A2732020-09-0909 September 2020 Requalification Program Inspection Hatch Nuclear Station ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors2019-12-18018 December 2019 Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors ML19336A0142019-12-0101 December 2019 NRR E-mail Capture - RAI: Hatch Emergency TS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LAR ML19280A0082019-10-0404 October 2019 NRR E-mail Capture - Request for Additional Information (RAI) - Hatch TSTF-51 LAR (L-2019-LLA-0091) ML19224C0552019-08-12012 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Degraded Voltage (L-2019-LLA-0108) ML19220A0362019-08-0808 August 2019 NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 ML19164A2582019-06-13013 June 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19107A4962019-04-17017 April 2019 NRR E-mail Capture - Request for Additional Information - Hatch 1 & 2 Application to Adopt Title 10 of Code of Federal Regulations 50.69 RISK-INFORMED Categorization and Treatment of Structures, Systems and Components for Power Reactors ML19088A0092019-03-29029 March 2019 NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information ML19029B3402019-01-23023 January 2019 Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18085A0132018-03-0808 March 2018 Draft Request for Additional Information on Alternative RR-V-11, Proposed Extension to Main Steam Safety Relief Valve Testing Requirements ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML17306A0872017-11-0808 November 2017 Request for Additional Information Regarding the Decommissioning Funding Status Reports (EPID L-LRO-2017-0008) ML17284A3542017-11-0707 November 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools ML17270A1402017-09-27027 September 2017 PIR Notification Letter 2017 ML17290A3172017-09-19019 September 2017 NRR E-mail Capture - Hatch 1 and 2 - Draft Request for Additional Information Request for Alternative No. HNP-ISI-ALT-05-05 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML17110A2112017-04-24024 April 2017 Request for Additional Information ML16330A1282016-12-0505 December 2016 Request for Additional Information ML16307A1842016-11-0202 November 2016 Request for Additional Information (Non-Proprietary) ML16271A1692016-10-17017 October 2016 Request for Additional Information ML16222A2952016-08-29029 August 2016 Request for Additional Information ML16205A0012016-07-22022 July 2016 Requalification Program Inspection - Plant Hatch ML16195A4002016-07-13013 July 2016 Request for Additional Information License Amendment Request to Revise Technical Specifications Regarding TSTF-500 ML16194A4282016-07-12012 July 2016 E-mail Draft Request for Additional Information for Technical Clarification ML16187A1222016-07-0101 July 2016 Notification of Inspection and Request for Information ML16111B3132016-04-20020 April 2016 Notification of Inspection and Request for Information ML16098A1442016-04-15015 April 2016 Request for Additional Information 2024-01-12
[Table view] |
Text
February 27, 2007 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF NOS.
RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, AND RR-62 (TAC NOS. MD2587, MD2588, MD2589, MD2590, MD2591, MD2597, MD2609, MD2610, MD2611, AND MD2613)
Dear Mr. Madison:
The Nuclear Regulatory Commission (NRC) staff has reviewed and evaluated the information provided by Southern Nuclear Operating Company, Inc (the licensee), in its letter dated July 10, 2006, which proposed its Third 10-year Interval Inservice Inspection Program Plan Requests for Relief Nos. RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, and RR-62 for Edwin I. Hatch Nuclear Plant, Units 1 and 2. To maintain the schedule for our review, it is requested that additional information, as described in the enclosure, be provided by April 13, 2007.
Please contact me if you have any questions regarding this correspondence.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosure:
RAI cc w/encl: See next page
February 27, 2007 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF NOS.
RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, AND RR-62 (TAC NOS. MD2587, MD2588, MD2589, MD2590, MD2591, MD2597, MD2609, MD2610, MD2611, AND MD2613)
Dear Mr. Madison:
The Nuclear Regulatory Commission (NRC) staff has reviewed and evaluated the information provided by Southern Nuclear Operating Company, Inc (the licensee), in its letter dated July 10, 2006, which proposed its Third 10-year Interval Inservice Inspection Program Plan Requests for Relief Nos. RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, and RR-62 for Edwin I. Hatch Nuclear Plant, Units 1 and 2. To maintain the schedule for our review, it is requested that additional information, as described in the enclosure, be provided by April 13, 2007.
Please contact me if you have any questions regarding this correspondence.
Sincerely,
/RA/
Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc w/encl: See next page Distribution:
Public PD2-1 R/F RidsNrrDorlLpl2-1(EMarinos)
RidsNrrLAOBrien RidsNrrPMRMartin RidsOgcRp RidsAcrsMailCenter RidsRgn2MailCenter(SShaeffer)
RidsNrrDciCvib(TMcLellan) RidsNrrDciCvib(MMitchell)
Accession No.: ML0704200146 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME RMartin:nc MOBrien EMarinos DATE 2/26/07 2/26/07 2/27/07 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION REGARDING THIRD 10-YEAR INSERVICE INSPECTION INTERVAL REQUEST FOR RELIEF NOS. RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, AND RR-62 EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 SOUTHERN NUCLEAR OPERATING COMPANY, INC DOCKET NOS. 50-321 AND 50-366 Requests for Relief (RR) Nos. RR-42, RR-43, RR-44, RR-45, RR-51, RR-58, RR-59, RR-60, and RR-62 are for the third 10-year inservice inspection (ISI) interval, in which Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2, adopted the 1989 edition with no addenda of the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (Code),
Section XI, as the ASME Code of record. In its letter dated July 10, 2006, Southern Nuclear Operating Company, Inc. (the licensee), requested relief from certain ASME Code,Section XI requirements.
RR-42 and RR-43 For RR-42, the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, Category B-A, Item B1.21 and Item B1.22 for Hatch Unit 1 reactor pressure vessel (RPV) bottom head meridional welds BHD-A through F and circumferential weld C.
For RR-43, the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, Category B-A, Item B1.21 and Item B1.22 for Hatch Unit 2 RPV bottom head dome meridional welds 2BHD-A through D and bottom head torus meridional welds 2BHT-A through G.
The ASME Code,Section XI, Table IWB-2500-1, Category B-A, Item B1.21 and B1.22 requires a volumetric examination of essentially 100 percent of the accessible length of all welds on the subject RPV bottom head.
According to the information provided by the licensee in its letter dated July 10, 2006, the licensee was unable to obtain any volumetric coverage on Hatch Unit 1 RPV bottom head dome meridional welds 2BHD-A through D and circumferential weld C due to the RPV support skirt causing the subject welds to be inaccessible for examination. For Hatch Unit 1, the licensee examined bottom head meridional welds BHT-A, BHT-B, BHT-C, BHT-D, BHT-E, BHT-F, BHT-G, and BHT-H, and bottom head circumferential weld C-7 in 2006 and the licensee obtained 100-percent coverage for each weld. The licensee detected no indications during these examinations.
For Hatch Unit 2, the licensee found the examinations to be limited for bottom head dome meridional welds 2BHD-A through D and bottom head torus meridional welds 2BHT-A through G due to the control rod drives that penetrate the bottom head near the welds and the RPV support skirt interfering with the examinations. The licensee obtained 27 percent to 28 percent of the length of welds bottom head dome meridional welds 2BHD-A through D. In addition, the Enclosure
licensee obtained 88 percent of the length of each weld for the bottom head torus meridional welds 2BHT-A through G. The licensee detected no indications during these examinations.
For this particular ASME Code,Section XI, Examination Category B-A and Item Numbers B1.21 and B1.22, the ASME Code specifically states examination is of the accessible weld length. Therefore, the licensee should consider reassessing the ASME Code requirements in that if the licensee actually obtained essentially 100 percent of the accessible weld length, then relief may not be required.
RR-44 The licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, Table IWB-2500-1, Category B-D, Item B3.90 for nozzle-to-vessel welds listed in the licensees Tables RR-44-11 and RR-44-21 for Hatch Units 1 and 2, respectively.
- 1. Provide drawings or sketches of the ASME Code,Section XI, Category B-D components listed in Tables RR-44-1 and RR-44-2 for Hatch Units 1 and 2, respectively. Drawings or sketches of every component are not required. An example of one each type of similar component will satisfy this request.
- 2. For the nozzles listed in Tables RR-44-1 and RR-44-2, identify which nozzle belongs to which vessel.
- 3. Clarify if the examinations of the nozzles listed in Tables RR-44-1 and RR-44-2 were performed from the inside or the outside of the nozzles.
- 4. Clarify which ASME Code edition and addenda was used regarding the Performance Demonstration Initiative examination techniques.
- 5. Describe the plants leakage and radiation monitor systems with regard identifying leakage from the subject welds. Also, describe when VT-2 visual examinations were last performed on the subject welds.
RR-45 The licensee requested relief from the surface examination requirements in ASME Code,Section XI, Code Case N-509, Category B-K, Item B10.10 for Hatch Unit 2 RPV stabilizer brackets SB1 through SB6.
Provide drawings of the RPV stabilizer brackets.
RR-51 The licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, IWB-2500-1, Category B-A, Item B1.12 for RPV longitudinal welds, shown in the licensees Table RR-51-11 for Hatch Unit 1.
- 1. Tables RR-44-1, RR-44-2, and RR-51-1 are not included in this request for additional information and can be found in the licensees letter dated July 10, 2006.
- 1. Provide drawings or sketches of the ASME Code,Section XI, Category B-A, Item B1.12 components listed in Table RR-51-1 for Hatch Unit 1.
- 2. Describe the plants leakage and radiation monitor systems with regard to identifying leakage from the subject welds. Also, describe when VT-2 visual examinations were last performed on the subject welds.
- 3. For weld C-4-B, has the licensee considered VT-1 visual examination by remote camera or any other type of visual examinations of the subject weld as an alternative to the ASME Code volumetric examinations if they can not be performed in February 2008?
- 4. Has the licensee considered examining weld C-4-B from the inside of the RPV if at any time there is a core off load and dismantling of internal components for Hatch Unit 1?
- 5. In RR-51 the licensee erroneously stated that the ASME Code requirements for ASME Code,Section XI, Table IWB-2500-1, Examination Category B-A, Item B1.12 requires that 100 percent of the accessible length of each weld be examined. Note 2 of the ASME Code,Section XI, Table IWB-2500-1, Examination Category B-A, Item B1.12 requires that essentially 100 percent of the weld length is to be examined, not the accessible length. Please correct this error in RR-51.
RR-58, RR-59, RR-60, and RR-62 In RR-58 for Hatch Unit 1, the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, IWC-2500-1, Category C-B, Item C2.21 for residual heat removal (RHR) exchanger weld 1E11-2HX-B-O.
In RR-59 for Hatch Unit 1, the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, IWC-2500-1, Category C-B, Item C2.21 for RHR heat exchanger weld 2E11-2HX-A-O.
In RR-60 for Hatch Unit 2, the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, IWC-2500-1, Category C-A, Item C1.20 for RHR heat exchanger weld 2E11-2HX-A-3.
In RR-62 for Hatch Unit 2, the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, IWB-IWC-2500-1, Category C-A, Item C1.10 for RHR heat exchanger weld 2E11-2HX-A-2.
RR-58, RR-59, RR-60, and RR-62:
- 1. Provide drawings or sketches of the RHR heat exchanger welds for Hatch Units 1 and 2.
- 2. Identify the materials (both base material and weld material) by material specification associated with the welds in these RRs. Discus how the materials properties and/or nozzle geometry hindered the volumetric examinations.
- 3. Describe the plants leakage and radiation monitor systems with respect to identifying leakage from the welds. Also, describe when VT-2 visual examinations were last performed on the subject welds.
- 4. For ASME Code,Section XI, Category C-B, Item Number C2.21 where both a volumetric and surface examination are required, please provide the coverage obtained for the surface examinations.
Edwin I. Hatch Nuclear Plant, Unit Nos. 1 & 2 cc:
Laurence Bergen Mr. Jeffrey T. Gasser Oglethorpe Power Corporation Executive Vice President 2100 E. Exchange Place Southern Nuclear Operating Company, Inc.
P.O. Box 1349 P.O. Box 1295 Tucker, GA 30085-1349 Birmingham, AL 35201-1295 Mr. R. D. Baker Mr. K. Rosanski Manager - Licensing Resident Manager Southern Nuclear Operating Company, Inc. Oglethorpe Power Corporation P.O. Box 1295 Edwin I. Hatch Nuclear Plant Birmingham, AL 35201-1295 P.O. Box 2010 Baxley, GA 31515 Resident Inspector Plant Hatch 11030 Hatch Parkway N.
Baxley, GA 31531 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513