Enclosure - Surry Inspection / Activity Plan 09/01/2006 - 03/31/2008
ML062430489
Person / Time
Site: Surry, 07200002, 07200055  Dominion icon.png
Issue date: 08/30/2006
From:
Division Reactor Projects II
To:
Shared Package
ML062430481 List:
References
Download: ML062430489 (2)


Text

Page 1 of 2 Surry 08/30/2006 12:41:13 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues EB3-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 08/28/2006 09/01/2006 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/30/2006 11/03/2006 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/06/2006 11/10/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 11/12/2006 11/17/2006 Safety Issues EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 11/27/2006 12/01/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 01/22/2007 01/26/2007 Baseline Inspections ISFSI - ISFSI DRY RUN NUHOMS CASK 4 1, 2 IP 60854 Preoperational Testing Of An ISFSI 05/07/2007 05/18/2007 Other Routine 1, 2 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 05/07/2007 05/18/2007 Other Routine EB1-MODS - MODIFICATIONS-10CFR50.59 2 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/11/2007 06/15/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/09/2007 07/13/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Surry 08/30/2006 12:41:13 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PROBLEM IDENTIFICATION & RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 09/24/2007 09/28/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 10/08/2007 10/12/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/24/2007 09/26/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/22/2007 10/26/2007 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/29/2007 11/02/2007 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 11/05/2007 11/09/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASLINE INSP WK 2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 11/05/2007 11/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/05/2007 11/09/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 11/11/2007 11/16/2007 Safety Issues EB1-CDB - COMPONENT DESIGN BASES INSPECTION 1 1, 2 IP 7111121 Component Design Bases Inspection 12/10/2007 12/14/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 1, 2 IP 7111121 Component Design Bases Inspection 01/07/2008 01/11/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 01/21/2008 01/25/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/04/2008 02/08/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 2 1 V23279 SURRY/MARCH 2008 EXAM AT POWER FACILITIES 02/25/2008 02/29/2008 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23279 SURRY/MARCH 2008 EXAM AT POWER FACILITIES 03/17/2008 03/28/2008 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.