August 31, 2006 Virginia Electric and Power Company ATTN: Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - SURRY POWER STATION
Dear Mr. Christian:
On August 3, 2006, the NRC staff completed its performance review of the Surry Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.
Overall, Surry Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for Surry Units 1 and 2 for the most recent quarter was in the Regulatory Response Column of the NRCs Action Matrix of Inspection Manual Chapter 305, Operating Reactor Assessment Program, due to a White inspection finding in the Emergency Preparedness Cornerstone. The White inspection finding involved the failure to identify, during the exercise critique, that the proper emergency action level was not entered during a full scale exercise. The White finding was identified in the first quarter of calendar year 2006. In accordance with the NRCs Action Matrix, a White inspection finding reflected performance at a level requiring increased regulatory response. Therefore, in addition to the reactor oversight process (ROP) baseline inspection program at your facility, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Inspection for One or Two White Inputs In a Strategic Performance Area, in the Emergency Preparedness Cornerstone. We will coordinate with your staff to schedule the supplemental inspection. In addition, we plan to conduct non-ROP inspections involving containment sump blockage, verification of the Mitigating Systems Performance Index, and Independent Spent Fuel Storage Installation.
VEPCO 2
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Kerry Landis at (404) 562-4510 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Charles A. Casto, Director Division of Reactor Projects Docket Nos.: 50-280, 50-281,72-002, 72-55 Licensee Nos.: DPR-32, DPR-37, SNM-2501
Enclosure:
Surry Inspection/Activity Plan cc w/encl: (See page 3)
OFFICE RII:DRP SIGNATURE LXG1 NAME LGarner DATE 08/30/2006 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
VEPCO 3
cc w/encl:
Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric & Power Company Electronic Mail Distribution Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, VA 23209 Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encl: (See page 4)
VEPCO 4
Letter to David A. Christian from Charles A. Casto dated August 31, 2006
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - SURRY POWER STATION Distribution w/encl:
S. Monarque, NRR C. Evans L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC