NRC CY2005 Annual Assessment Meeting TURKEY POINT Homestead, Florida May 17, 2006 Enclosure 2

Purpose of Todays Meeting

  • A public forum for discussion of Turkey Point performance
  • NRC will address Turkey Point performance issues identified in the annual assessment letter
  • Turkey Point management will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda

  • Introduction
  • Review of Reactor Oversight Process
  • National Summary of Plant Performance
  • Discussion of Turkey Point Plant Performance Results
  • Turkey Point Management Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC Available to Address Public Questions

Region II Organization William Travers Regional Administrator Loren Plisco Deputy Regional Administrator Charles Casto Victor McCree Director Division of Reactor Projects Director Division of Reactor Safety Joseph Shea Harold Christensen Deputy Director Deputy Director Joel Munday Regional Specialists Branch Chief Turkey Point Project Engineer Resident Inspectors Son Ninh Scott Stewart Tim Kolb

NRC Performance Goals PRIMARY GOALS Ensure protection of the public health and safety and the environment Ensure the secure use and management of radioactive materials OTHER GOALS

  • Ensure openness in NRC regulatory process
  • Ensure that NRC actions are effective, efficient, realistic, and timely
  • Ensure excellence in NRC management to carry out the NRCs strategic objective

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Performance Thresholds Safety Significance Green: Very low safety issue White: Low-to-moderate safety issue Yellow: Substantial safety issue Red: High safety issue NRC Inspection Efforts Green: Only Baseline Inspections White: May increase NRC oversight Yellow: Increased NRC oversight Red: Increased NRC oversight and other NRC actions

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103

Turkey Point CY2005 Inspection Activities

  • 3593 hours0.0416 days <br />0.998 hours <br />0.00594 weeks <br />0.00137 months <br /> of inspection related activities
  • Resident inspector daily inspections
  • Engineering modifications inspection
  • Maintenance inspections
  • Radiation protection inspections
  • Reactor head replacement and containment repair inspections
  • Reactor operator initial exam

Turkey Point CY2005 Assessment Results

  • Both units performance was within the Licensee Response Column of the NRCs Action Matrix for the first two quarters of the calendar year.
  • Unit 4 transitioned into the regulatory response column in the third quarter and both units in the fourth quarter.

Turkey Point CY2005 Assessment Results

  • All inspection findings were classified as very low safety significance (Green).
  • All performance indicators (PI) were Green with two exceptions - (1) The Unplanned Scrams per 7000 Critical Hours PI for unit 4 crossed the White threshold in the Initiating Events Cornerstone in the third quarter; (2) The Heat Removal System Unavailability PI for both units crossed the White threshold in the Mitigating System Cornerstone in the fourth quarter.

Turkey Point Assessment Summary

  • Florida Power and Light Company operated Turkey Point in a manner that preserved public health and safety
  • All cornerstone objectives were met
  • NRC plans baseline inspections and a 95001 supplemental inspection at Turkey Point for the remainder of CY 2006.

Turkey Point CY2006 Scheduled Inspection Activities

  • Resident inspector daily inspections
  • Problem identification and resolution inspection
  • Radiation protection inspections
  • Licensed operator requalification program inspection
  • Component design bases inspection
  • Maintenance inspections
  • Containment sump special inspection
  • Supplemental inspection for White PI

NRC CY2005 Annual Assessment Meeting TURKEY POINT Homestead, Florida May 17, 2006

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)