ML060810196

From kanterella
Jump to navigation Jump to search

Correction of Typographical Errors in Issuance of Amendments to TSs and the Renewed Operating License
ML060810196
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/11/2006
From: Banerjee M
Plant Licensing Branch III-2
To: Crane C
Exelon Generation Co
Banerjee M, NRR/ADPT, 415-2277
References
TAC MC6250
Download: ML060810196 (9)


Text

April 11, 2006 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - CORRECTION OF TYPOGRAPHICAL ERRORS IN ISSUANCE OF AMENDMENTS TO THE TECHNICAL SPECIFICATIONS AND THE RENEWED OPERATING LICENSE

Dear Mr. Crane:

We recently found typographical errors in the following amendments issued by the Nuclear Regulatory Commission (Commission):

Amendment to Renewed Facility Operating License (FOL) No. DPR-19 for Dresden Nuclear Power Station (Dresden), Unit 2, issued on February 17, 2006, used an incorrect amendment number of 210 instead 218. Additionally, the issue date on the amended FOL page was also incorrect.

Amendment numbers 206 and 198 to FOL No. DPR-19 and DPR-25 for Dresden, Units 2 and 3, respectively, issued on February 18, 2004, inadvertently deleted information from the revised technical specification (TS) page 3.3.6.1-5 unrelated to the subject of the amendments. The accompanying revised Quad Cities TS page was not affected.

The errors, inadvertently introduced, are corrected in the enclosed Dresden, Unit 2, Renewed FOL, page 8, and other associated pages included in the February 17, 2006 letter. A corrected copy of the Dresden, Units 2 and 3, TS page 3.3.6.1-5 is also enclosed. The Notice of Issuance published in the Commission's biweekly Federal Register notice on March 14, 2006 (71 FR 13185), regarding the Renewed FOL amendment is also being corrected.

Sincerely, Maitri Banerjee, Senior Project Manager /RA/

Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-237 and 20-249

Enclosures:

1. Corrected Renewed FOL DPR-19 page 8 and associated pages
2. Corrected TS page 3.3.6.1-5 cc w/encls: See next page

Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - CORRECTION OF TYPOGRAPHICAL ERRORS IN ISSUANCE OF AMENDMENTS TO THE TECHNICAL SPECIFICATIONS AND THE RENEWED OPERATING LICENSE

Dear Mr. Crane:

We recently found typographical errors in the following amendments issued by the Nuclear Regulatory Commission (Commission):

Amendment to Renewed Facility Operating License (FOL) No. DPR-19 for Dresden Nuclear Power Station (Dresden), Unit 2, issued on February 17, 2006, used an incorrect amendment number of 210 instead 218. Additionally, the issue date on the amended FOL page was also incorrect.

Amendment numbers 206 and 198 to FOL No. DPR-19 and DPR-25 for Dresden, Units 2 and 3, respectively, issued on February 18, 2004, inadvertently deleted information from the revised technical specification (TS) page 3.3.6.1-5 unrelated to the subject of the amendments. The accompanying revised Quad Cities TS page was not affected.

The errors, inadvertently introduced, are corrected in the enclosed Dresden, Unit 2, Renewed FOL, page 8, and other associated pages included in the February 17, 2006 letter. A corrected copy of the Dresden, Units 2 and 3, TS page 3.3.6.1-5 is also enclosed. The Notice of Issuance published in the Commission's biweekly Federal Register notice on March 14, 2006 (71 FR 13185), regarding the Renewed FOL amendment is also being corrected.

Sincerely, Maitri Banerjee, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-237 and 20-249

Enclosures:

1. Corrected Renewed FOL DPR-19 page 8 and associated pages
2. Corrected TS page 3.3.6.1-5 cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsOgcRp LPLIII-2 R/F RidsAcrsAcnwMailCenter RidsNrrPMMBanerjee RidsNrrDorlLplf GHill (4) MRing,RIII RidsNrrLADClarke RidsNrrDirsItsb RidsNrrIOEB RidsNrrDORlDpr Package: ML Letter: ML060810196 TechSpec:

OFFICE PM: LPL3-2 LA:LPL3-2 OGC (NLO) (A)BC:LPL3-2 NAME MBanerjee:mw DClarke MWoods DCollins DATE 3/31/06 4/5/06 OFFICIAL RECORD COPY

CORRECTED RENEWED FACILITY OPERATING LICENSE DPR-19 PAGE 8 AND ASSOCIATED PAGES ENCLOSURE 1

February 17, 2006 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNIT 2 - ISSUANCE OF AMENDMENT RE: DELETION OF REPORTING REQUIREMENT IN RENEWED FACILITY OPERATING LICENSE (TAC NO. MC6250 )

Dear Mr. Crane:

The Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 218 to Renewed Facility Operating License No. DPR-19 for Dresden, Unit 2. The I amendment is in response to your application dated February 25, 2005.

The amendment deletes the reporting requirement in the Renewed Facility Operating License related to reporting violations of other requirements in the operating license.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Maitri Banerjee, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-237

Enclosures:

1. Amendment No. 218 to DPR-19 I
2. Safety Evaluation cc w/encls: See next page

EXELON GENERATION COMPANY, LLC DOCKET NO. 50-237 DRESDEN NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 218 I License No. DPR-19

1. The Nuclear Regulatory Commission (Commission) has found that:

A. The application for amendment by the Exelon Generation Company, LLC (licensee) dated February 25, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act and the rules and regulations of the Commission; C. There is reasonable assurance (I) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

ATTACHMENT TO LICENSE AMENDMENT NO. 218 I RENEWED FACILITY OPERATING LICENSE NO. DPR-19 DOCKET NO. 50-237 Replace the following page of the Renewed Facility Operating License with the attached page.

The revised page is identified by amendment number and contains a marginal line indicating the area of change.

Remove Pages Insert Pages 8 8

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 218 TO RENEWED FACILITY OPERATING I LICENSE NO. DPR-19 EXELON GENERATION COMPANY, LLC DRESDEN NUCLEAR POWER STATION, UNIT 2 DOCKET NO. 50-237

1.0 INTRODUCTION

By letter to the Nuclear Regulatory Commission (NRC, Commission), dated February 25, 2005 (Agencywide Documents Access and Management System Accession Number ML050600047),

Exelon Generation Company, LLC (the licensee) requested changes to the Renewed Facility Operating License for Dresden, Unit 2. The proposed amendment would delete Section 2.G of the Renewed Facility Operating License (RFOL) that requires reporting of violations of the requirements in Section 2.C of the license. A notice announcing the availability of this proposed change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on November 4, 2005 (70 FR 67202). The licensees application was used during the development of the CLIIP notices and is being evaluated using that process even though the application predates the notice of availability.

2.0 REGULATORY EVALUATION

The NRC staff finds that the licensee, in Section 5.2 of its submittal, identified the applicable regulatory requirements.

Conditions were included in the facility operating licenses (FOLs) issued to some nuclear power plants requiring the licensee to make reports to the NRC regarding violations of other sections of the operating license (typically Section 2.C). Such a license condition typically reads as follows:1 Except as otherwise provided in this license and its appendices, the licensee shall report any violations of the requirements contained in Section 2.C of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 30 days in accordance with the procedures described in 10 CFR 50.73 (licensee event report system).

1 Condition 2.G in the Renewed Facility Operating License for Dresden Unit 2 is similar to the standard language.

CORRECTED TECHNICAL SPECIFICATION PAGE 3.3.6.1-5 ENCLOSURE 2

Dresden Nuclear Power Station Unit 2 cc:

Site Vice President - Dresden Nuclear Power Station Senior Vice President of Operations Exelon Generation Company, LLC Exelon Generation Company, LLC 6500 N. Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Dresden Nuclear Power Station Plant Manager Vice President - Licensing and Regulatory Exelon Generation Company, LLC Affairs 6500 N. Dresden Road Exelon Generation Company, LLC Morris, IL 60450-9765 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC Director - Licensing and Regulatory Affairs 6500 N. Dresden Road Exelon Generation Company, LLC Morris, IL 60450-9765 4300 Winfield Road Warrenville, IL 60555 U.S. Nuclear Regulatory Commission Dresden Resident Inspectors Office Assistant General Counsel 6500 N. Dresden Road Exelon Generation Company, LLC Morris, IL 60450-9766 200 Exelon Way Kennett Square, PA 19348 Chairman Grundy County Board Manager Licensing - Dresden, Administration Building Quad Cities and Clinton 1320 Union Street Exelon Generation Company, LLC Morris, IL 60450 4300 Winfield Road Warrenville, IL 60555 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555