MONTHYEARML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22292A0732022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 02, Appendix 2B Table 2B-39 ML22292A0812022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 ML22292A0822022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.1-1 Thru 1.2-19 Sheet 2 ML22292A0852022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55 ML22292A0982022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed ML22292A1032022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 ML22292A1052022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42 ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A1162022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures NMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML18018A9612018-01-18018 January 2018 Preservice Inspection Plan ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML17037A6662017-02-0606 February 2017 Relative Pollen Percentages, Spores and Miscellaneous Microfossil Abundance, Plate 1-3 ML17037C5612017-02-0606 February 2017 Plate 1-2 - Composite Site Stratographic Column Showing Position of Overcome Borings in Relation to Site Stratigraphy ML17037C5622017-02-0606 February 2017 Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench ML17037C5632017-02-0606 February 2017 Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench ML17037C5642017-02-0606 February 2017 Plate 5-1 - Composite Site Stratigraphic Column ML17037C5652017-02-0606 February 2017 Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8 ML17037C5662017-02-0606 February 2017 Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10 ML17037C5672017-02-0606 February 2017 Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7 ML17037C5692017-02-0606 February 2017 Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10 ML17037C6832017-02-0606 February 2017 Table 7.2-1, Isolation Signal Codes (Cont'D) 6 of 6 ML17037A6622017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-3, Plate 5-11 ML17037A6592017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-4-1 Through T-4-12, Plate 5-3 ML17037C6892017-02-0606 February 2017 Table 7.2-1, Process Pipelines Penetrating Primary Containment, 1 of 6 ML17037A6582017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-3-1 Through T-3-10, Plate 5-2 ML17037A6632017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-4, Plate 6-12 ML17037A7152017-02-0606 February 2017 Figure 6-3, Response Test Strip Chart for Unstable Condition. ML17037A7012017-02-0606 February 2017 Table 7.2-1 (Continued) ML17037C6912017-02-0606 February 2017 Table 7.2-1 (Cont'D) 3 of 6 ML17037C7822017-02-0606 February 2017 Table 7.2-1 Process Pipelines Penetrating Primary Containment 1 of 6 ML17037C7792017-02-0606 February 2017 Table 7.2-1 Isolation Signal Codes(Cont'D) 6 of 6 ML17037C7852017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037C7592017-02-0606 February 2017 Table 7.2-1 (Cont'D) 6 of 6 ML17037C7582017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037C6922017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 JAFP-16-0110, Correction to 2014 Annual Radioactive Effluent Release Report2016-06-29029 June 2016 Correction to 2014 Annual Radioactive Effluent Release Report ML16112A1722016-04-25025 April 2016 Indian Point Nuclear Generating Unit Nos. 2 And 3 Interim Staff Response To Reevaluated Flood Hazards Submitted In Response To 10 CFR 50.54 (f) Information Request Flood-Causing Mechanism Reevaluation (CAC NOS. MF3313 and MF3314) JAFP-16-0060, James a Fitzpatrick - Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments2016-04-14014 April 2016 James a Fitzpatrick - Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments NL-16-035, Supplemental to Basis for Performance of the Mitigating Strategies Assessment with Flood Hazard Information & Report for Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid2016-04-0505 April 2016 Supplemental to Basis for Performance of the Mitigating Strategies Assessment with Flood Hazard Information & Report for Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15238B5372015-09-0404 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15229A0232015-08-13013 August 2015 Tables 1 and 2 NL-15-019, Reply to Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the License Renewal Application2015-03-10010 March 2015 Reply to Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the License Renewal Application 2023-04-05
[Table view] |
Text
THE DATA BELOW IS FOR INFORMATION ONLY Fitzpatrick MVA Voltage Transformer Rating Ratio Tap LTC Impedance HV LV LV 35362 Main 1 445/498 345/22.8 5 - no 14.78%
35362 Main 2 445/498 345/ 22.8 5 - no 14.78%
H=-0.1.328, X=6.238, Y=7.123 T4-Unit Aux - set@4000v 8MVA base H=-0.043, X=2.243, 11300 Y=2.258 T2-Stat Serv 12/16/+20 115/4160 0 4160 no 4MVA base H=-0.022, X=2.223, 11300 Y=2.248 T3-Stat Serv 12/16/+20 115/4160 0 4160 No 4MVA base Nine Mile 1 MVA Voltage Transformer Rating Ratio Tap LTC Impedance HV LV 345kV /
Main 1-TB-01 784 22.8kV 14.00%
345kV /
Main 2-TB02 784 22.8kV 9.00%
Unit Aux-xfmr#10 15/20/+28 24/4140 td 30s,+-10%voltage 7.37%
Reserve Tranf 2s initiate, 101S 12/15/+18 115/4160 2soperate;+-5% 5.55%
Reserve Tranf 101N 12/15/+18 115/4160 td 4s,+-10%voltage 7.62%
Nine Mile 2
MVA Voltage Transformer Rating Ratio Tap LTC Impedance HV LV Main 1 408/457 345/ 22.8 - 7.14%
Main 2 408/457 345/22.8 - 7.14%
Unit Aux 100/50-50 24.9/13.8 - td 30s, +-10%volt Scriba TB1 345/115 td 30s, +-10%volt Scriba TB2 345/115 locked@-2(5/8%)
H=-1.145%,
X=8.095%,Y Reserve 115/13.8- =25.838%
RTX-1A 42/56/70 4.160 13.8 td 60s, +-10%volt on 42MVA H=-1.145%,
X=8.095%,Y Reserve 115/13.8- =25.838%
XSR-1B 42/56/70 4.160 13.8 td 60s, +-10%volt on 42MVA H=-1.2%,
X=7.8%,Y=1 18.59/24.73/3 115/13.8- 0.2% on Stat Serv X1 0.87 4.160 42MVA Station Service XS1 8.5/10.5/11.9 13.2/4/16 5.50%
Station Service XS2 8.5/10.5/11.9 13.2/4/16 5.50%
INDIAN POINT UNIT 2 MVA Voltage Impeda Transformer Rating Ratio Tap LTC nce HV LV HV LV 16.08%
345kV / 336.3 542MV Main 1 542 / 607.04 20.3kV 75kV - No No A 16.08%
345kV / 336.3 542MV Main 2 542 / 607.04 20.3kV 75kV - No No A 14.9%
Unit Aux 22kV / 20.9k @
(UAT) 43 / 48.16 6.9kV V - No Yes 43MVA
15.52%
Station Aux 138kV / 134.5 @
(SAT) 43 / 48.16 6.9kV 5kV No TD 180s 43MVA 6.17%
Station 6.9kV / @
Service 2A 2.0 / 2.666 480V 6.9kV - No No 2MVA 6.18%
Station 6.9kV / @
Service 3A 2.0 / 2.666 480V 6.9kV - No No 2MVA 6.14%
Station 6.9kV / @
Service 5A 2.0 / 2.666 480V 6.9kV - No No 2MVA 6.17%
Station 6.9kV / @
Service 6A 2.0 / 2.666 480V 6.9kV - No No 2MVA INDIAN POINT UNIT 3 MVA Voltage Impedan Transformer Rating Ratio Tap LTC ce HV LV HV LV 16.37%
345kV / 336.3 542MV Main 1 542 / 607.04 20.3kV 75kV - No No A 16.19%
345kV / 336.3 @
Main 2 542 / 607.04 20.3kV 75kV - No No 542MV 14.77%
22kV / 20.9k @ 43 Unit Aux 43 / 48.16 6.9kV V - No Yes MVA 14.92%
138kV / 134.5 @ 43 Station Aux 43 / 48.16 6.9kV 5kV No TD 180S MVA Station 6.9kV / 6.1% @
Service 2A 2.0 / 2.666 480V 6.9kV - No No 2MVA 6.14%
Station 6.9kV / @
Service 3A 2.0 / 2.666 480V 6.9kV - No No 2MVA 6.14%
Station 6.9kV / @
Service 5A 2.0 / 2.666 480V 6.9kV - No No 2MVA 6.17%
Station 6.9kV / @
Service 6A 2.0 / 2.666 480V 6.9kV - No No 2MVA