Site: | Nine Mile Point |
Issue date: | 02/06/2017 |
From: | Dames & Moore |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML17037C569 (1) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:Drawing
MONTHYEARNMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024
[Table view]Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures ML22292A0812022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 ML22292A1022022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1 ML22292A1362022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5-1, at the Controls Main Control Room El. 306-0 ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A0772022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 8, Figures ML22292A1182022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Figures ML22292A0662022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures ML22292A1272022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Figures ML22292A0932022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22292A0892022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Figures ML22292A1102022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1372022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 12, Figures ML22292A1172022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures ML22292A1012022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F ML22292A1092022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End ML22292A0632022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Figures ML22292A0922022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 11, Figures ML22292A0992022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End ML22292A0652022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures ML18018B3202018-01-18018 January 2018 Undersized Documents - Transformer 2MTX-XM1B - Oil Cooler Piping, Failed Windings, Tank Bulging, Preparation for Removal, HV Tap Changer, and Lv Leads and Bracing ML18018B1942018-01-18018 January 2018 Undersized Documents, Drawings and Photographs ML17037C5622017-02-0606 February 2017 Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench ML17037C6602017-02-0606 February 2017 Figure 5.4-3; Steam Concentration Following a LOCA with CAD Operation ML17037B4552017-02-0606 February 2017 Drawing 12177-EE-1AR-3, 600V One Line Diagram 2EHS*MCC102 Auxiliary Building North - Nine Mile Point Nuclear Station - Unit 2. ML17037C7252017-02-0606 February 2017 Drawing; Figure 7.15-1, Rod Worth Minimizer Functional Control Diagram ML17037A7102017-02-0606 February 2017 Figure 12.7-1a Radiation Zones - Reactor Building. ML17037C6592017-02-0606 February 2017 Figure 5.4-2; Hydrogen and Oxygen Concentration in Primary Containment Following a LOCA ML17037C6582017-02-0606 February 2017 Figure 5.3-2; Stand-by Gas Treatment System ML17037C5692017-02-0606 February 2017 Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10 ML17037C5672017-02-0606 February 2017 Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7 ML17037C5662017-02-0606 February 2017 Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10 ML17037C5652017-02-0606 February 2017 Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8 ML17037C5642017-02-0606 February 2017 Plate 5-1 - Composite Site Stratigraphic Column ML17037C5632017-02-0606 February 2017 Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench ML17037A8162017-02-0606 February 2017 Drawing No. 12177-ESK-4CEC25A ML17037A8182017-02-0606 February 2017 Drawing No. 12177-ESK-4CEC24 ML17037A6892017-02-0606 February 2017 Figure 12.1-1, General Arrangement Reactor Building - Plans ML17037A6902017-02-0606 February 2017 Figure 7.9 - 1A, Feedwater Control System. ML17037A6922017-02-0606 February 2017 Figure 7.6-7, Rod Block Interlocks from Neutron Monitoring System ML17037A8382017-02-0606 February 2017 Drawing - (Drawing No. Not Available) ML17037A7142017-02-0606 February 2017 Drawing No. 12241-GSK-31, Over Excavated Area - Reactor Containment - Locations. ML17037A4622017-02-0606 February 2017 Drawing 807E154TY, Revision 3, Leak Detection System Elementary Diagram. Sheet 4 ML17037A8272017-02-0606 February 2017 Drawing No. 12177-ESK-4CEC15 ML17037A7122017-02-0606 February 2017 Figure 12.7-2a, Radiation Zones-Turbine Building, Radwaste Building, and Screenwell. ML17037B4562017-02-0606 February 2017 Drawing 12177-EE-1AQ-3, 600V One Line Diagram 2EHS*MCC101 & 2EHS*MCC301 Screenwell Building - Nine Mile Point Nuclear Station - Unit 2. ML17037A6942017-02-0606 February 2017 Figure 7.4-10, Power Range Neutron Monitoring System Instrument Electrical Diagram ML17037A7052017-02-0606 February 2017 Figure 2.7-16, Screenwell Building Plan and Sections 2024-09-20 Category:Graphics incl Charts and Tables MONTHYEARML22314A2262022-11-10010 November 2022
[Table view]E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22292A1032022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 ML22292A0982022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed ML22292A0822022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.1-1 Thru 1.2-19 Sheet 2 ML22292A0732022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 02, Appendix 2B Table 2B-39 ML22292A0812022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures ML22292A0852022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55 ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A1162022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft ML22292A1052022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42 NMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML18018A9612018-01-18018 January 2018 Preservice Inspection Plan ML17037C6892017-02-0606 February 2017 Table 7.2-1, Process Pipelines Penetrating Primary Containment, 1 of 6 ML17037A6592017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-4-1 Through T-4-12, Plate 5-3 ML17037C6832017-02-0606 February 2017 Table 7.2-1, Isolation Signal Codes (Cont'D) 6 of 6 ML17037C5692017-02-0606 February 2017 Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10 ML17037C5672017-02-0606 February 2017 Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7 ML17037C6912017-02-0606 February 2017 Table 7.2-1 (Cont'D) 3 of 6 ML17037C5662017-02-0606 February 2017 Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10 ML17037C5652017-02-0606 February 2017 Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8 ML17037C5642017-02-0606 February 2017 Plate 5-1 - Composite Site Stratigraphic Column ML17037C5632017-02-0606 February 2017 Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench ML17037C5622017-02-0606 February 2017 Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench ML17037C5612017-02-0606 February 2017 Plate 1-2 - Composite Site Stratographic Column Showing Position of Overcome Borings in Relation to Site Stratigraphy ML17037C7582017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037A6662017-02-0606 February 2017 Relative Pollen Percentages, Spores and Miscellaneous Microfossil Abundance, Plate 1-3 ML17037A6622017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-3, Plate 5-11 ML17037A6582017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-3-1 Through T-3-10, Plate 5-2 ML17037A6632017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-4, Plate 6-12 ML17037A7152017-02-0606 February 2017 Figure 6-3, Response Test Strip Chart for Unstable Condition. ML17037A7012017-02-0606 February 2017 Table 7.2-1 (Continued) ML17037C6922017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037C7592017-02-0606 February 2017 Table 7.2-1 (Cont'D) 6 of 6 ML17037C7792017-02-0606 February 2017 Table 7.2-1 Isolation Signal Codes(Cont'D) 6 of 6 ML17037C7822017-02-0606 February 2017 Table 7.2-1 Process Pipelines Penetrating Primary Containment 1 of 6 ML17037C7852017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML12138A1352012-05-0707 May 2012 Reactor Pressure Vessel Head Weld Flaw Evaluation - Response to NRC Request for Additional Information ML12045A3892012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 1 of 2 ML12045A3962012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 2 of 2 ML12045A3942012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 1 of 2 ML12045A3932012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 2 of 2 ML12045A3922012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 1 of 2 ML12045A3912012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 2 of 2 ML12045A3902012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 1 of 2 ML12045A3872012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 2 of 2 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2022-11-10 |
Text
SW NE T 8 T- 4-9 T-4-10 A/r/ORANT
/0 0 /0 0 /0 OF 0/P (DEGREES/
50 50 50
/00 /00 /00
/50 /50 ZOO DIAGRAM SHOWING RELATIONSHIP BETWEEN NOTES:
For spacing between borings, see DIP OF BE D DIN G AND DE PTH (Plate 1-1).
T 8 THROUGH T 4 SITE LOCATION MAP BORINGS IO Diagrams indicate amount of dip only and not diceciion of dip.
Diagrams for Borings T I through PLATE 5 - IOA T-4-7 are shown on Plate 5-IO. DAMES 8 MOOSE