MONTHYEARML0519501232005-07-0707 July 2005 License Amendment Request Regarding Extended Power Uprate Project stage: Request ML0523101552005-08-15015 August 2005 Supplemental Information Related to Small Break (SB) Loss of Coolant Accident (LOCA) Analysis and Post-LOCA Boric Acid Precipitation Analysis Project stage: Request ML0524500902005-09-0202 September 2005 Forthcoming Meeting with R.E. Ginna Nuclear Power Plant, LLC (Ginna, Llc), Regarding Extended Power Uprate Amendment Application Project stage: Meeting ML0524504522005-09-15015 September 2005 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing - Extended Power Uprate - R.E. Ginna Nuclear Power Plant Project stage: Other ML0529208222005-09-15015 September 2005 Presentation for 09/15/2005 Meeting with R. E. Ginna SBLOCA EPU Results Summary Project stage: Meeting ML0525502722005-09-30030 September 2005 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for R. E. Ginna Nuclear Power Plant Project stage: Withholding Request Acceptance ML0528002232005-09-30030 September 2005 R. E. Ginna, Large Transient Tests Associated with License Amendment Request Regarding Extended Power Uprate Project stage: Request ML0529205102005-10-24024 October 2005 Summary of Meeting with R.E. Ginna Extended Power Uprate Application Project stage: Meeting ML0530705682005-11-0303 November 2005 Forthcoming Meeting with R.E. Ginna Nuclear Power Plant, LLC (Ginna Llc), Regarding Extended Power Uprate Amendment Application Project stage: Meeting ML0530703792005-11-0303 November 2005 Request for Additional Information Extended Power Uprate License Amendment Project stage: RAI ML0531404202005-11-10010 November 2005 Supplemental Request for Additional Information Extended Power Uprate License Amendment Project stage: RAI ML0536201882005-11-17017 November 2005 Meeting with R. E. Ginna Nuclear Power Plant, LLC, Regarding Extended Power Uprate Amendment Application Project stage: Meeting ML0534803882005-12-0606 December 2005 Response to Requests for Additional Information Regarding Topics Described by Letter Dated October 25. 2005 Project stage: Response to RAI ML0536101852005-12-19019 December 2005 Response to Requests for Additional Information Re Increase of Maximum Steady-State Thermal Power Level Project stage: Response to RAI ML0536400802005-12-22022 December 2005 Response to Request for Additional Information Regarding Topics Described by Letter Dated November 10, 2005 Project stage: Response to RAI ML0535602452005-12-23023 December 2005 Summary of November 17, 2005, Meeting with R. E. Ginna Nuclear Power Plant, LLC, Regarding Extended Power Uprate Application Project stage: Meeting ML0601802622006-01-11011 January 2006 Supplemental Response to Requests for Additional Information Regarding Topics Described by Letters Dated August 24, 2005 and October 28, 2005 Project stage: Supplement ML0609604162006-01-25025 January 2006 R. E. Ginna - Response to Requests for Additional Information Regarding Topics Described in Meeting Minutes Project stage: Response to RAI ML0605403492006-02-16016 February 2006 Response to Requests for Additional Information Regarding Topics Discussed on Conference Calls Project stage: Response to RAI ML0606806582006-03-0909 March 2006 Forthcoming Meeting with R. E. Ginna Nuclear Power Plant, LLC (Ginna Llc), Regarding Extended Power Uprate Amendment Application Project stage: Meeting ML0607901132006-03-20020 March 2006 Cancellation - Forthcoming Meeting with R.E. Ginna Nuclear Power Plant, LLC Regarding Extended Power Uprate Amendment Application Project stage: Meeting ML0609403122006-03-24024 March 2006 R. E. Ginna - Response to BOP Systems Questions Discussed on March 2, 2006 Conference Call Project stage: Request ML0609300252006-04-0404 April 2006 Notice of Meeting with R. E. Ginna Nuclear Power Plant, LLC (Ginna Llc), Regarding Extended Power Uprated Amendment Application Project stage: Meeting ML0608003152006-04-0606 April 2006 R. E. Ginna Nuclear Power Plant - Draft Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Draft Other ML0608003472006-04-0606 April 2006 R. E. Ginna Nuclear Power Plant Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment to Increase to Maximum Reactor Power Level Project stage: Draft Other ML0613503752006-05-0909 May 2006 R. E. Ginna, Response to Requests for Additional Information Regarding Topics Discussed on Conference Calls for Extended Power Uprate (EPU) Project stage: Response to RAI ML0613706272006-05-12012 May 2006 Comment (1) of Kimberly A. Merchant on Draft Environmental Assessment and Findings of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Draft Other ML0614503812006-05-19019 May 2006 R. E. Ginna Final Response to Requests for Additional Information Regarding Topics Discussed on Conference Calls for Extended Power Uprate (EPU) Project stage: Response to RAI ML0613204402006-06-26026 June 2006 R. E. Ginna Nuclear Power Plant - Final Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Other ML0616002502006-06-26026 June 2006 Final Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Acceptance Review ML0619205922006-07-11011 July 2006 Amendment 97, Renewed Facility Operating License Page No. 3 Regarding 16.8 Percent Power Uprate Project stage: Other ML0619205942006-07-11011 July 2006 R. E. Ginna, Tech Spec Pages for Amendment 97 Regarding 16.8 Percent Power Uprate Project stage: Other ML0613801032006-07-11011 July 2006 R. E. Ginna, License Amendment, 16.8 Percent Power Uprate Project stage: Other ML0613802492006-07-11011 July 2006 Table of Contents, Safety Evaluation Related to Extended Power Uprate at R. E. Ginna Nuclear Power Plant Project stage: Approval ML0629101322006-10-12012 October 2006 License Amendment Request: Spent Fuel Pool Storage Capacity Project stage: Request 2006-01-11
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20244012024-11-20020 November 2024 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2024401 IR 05000244/20240032024-11-0808 November 2024 Integrated Inspection Report 05000244/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles 2024-09-25
[Table view] |
Text
Maria Korsnick 1503 Lake Road Vice President Ontario, New York 14519-9364 585.771.3494 585.771.3943 Fax maria.korsnick@constellation.com Constellation Energy I R.E. Ginna Nuclear Power Plant August 15, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Supplemental Information Related to Small Break (SB) Loss of Coolant Accident (LOCA) Analysis and Post-LOCA Boric Acid Precipitation Analysis
REFERENCE:
(1) Letter from Mary G. Korsnick (Ginna LLC) to Donna M. Skay (NRC),
"License Amendment Request Regarding Revised Loss of Coolant Accident (LOCA) Analyses - Changes to Accumulator, Refueling Water Storage (RWST), and Administrative Control Technical Specifications",
dated April 29, 2005.
(2) WCAP-10054-P-A, Addendum 2, Revision 1, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Thompson, C. M., et al., July 1997.
(3) Letter dated August 1, 2005 from R. A. Gramm, U. S. Nuclear Regulatory Commission to J. A. Gresham, Westinghouse Electric Company, "Suspension of NRC Approval for Use of Westinghouse Topical Report CENPD-254-P, 'Post LOCA Long-term Cooling Model' Due to Discovery of Non-conservative Modeling Assumptions During Calculations Audit" (4) Letter from C. L. Caso to T. M. Novak, Chief, Reactor Systems Branch, NRC, from Manager, Safeguards Engineering, Westinghouse Corporation Power Systems, CLC-NS-309, "Long Term Buildup of Boric Acid", April 1, 1975.
4kO\
/001 397y
This letter responds to verbal requests for information received during a phone call with the NRC staff on August 11, 2005 related to the R.E. Ginna Nuclear Power Plant (Ginna) Extended Power Uprate (EPU). The requested information relates to the Small Break (SB) Loss of Coolant Accident (LOCA) analysis and the post-LOCA boric acid precipitation analysis. This additional information should clarify the evaluation methods used for the Ginna EPU in these areas to allow the NRC staff to proceed with its detailed technical review of the EPU.
The SBLOCA and post-LOCA boric acid precipitation analyses for the Ginna EPU were provided to NRC in Reference 1 [Pre-submittal to NRC dated'4/29/05]. Tables 4 and 5 of to Reference 1 provide a listing of SBLOCA transient and rod heat up results, respectively, for the 1.5", 2" and 3" breaks analyzed. SBLOCA transient parameter plots were only provided for the limiting 2" break in Reference 1. Enclosure 1 to this letter provides similar parameter plots for the 1.5" and 3" breaks analyzed and documented for the Ginna EPU. In addition, although not documented in the analysis, 4" and 6" break size transient calculations for the Ginna EPU were performed to demonstrate that no core uncovery occurred for these breaks, thereby confirming that the range of breaks analyzed contained the limiting break. Additional SBLOCA transient behavior can be found in NRC-approved topical report, Reference 2 [WCAP-10054-P-A, Addendum 2, Revision 1].
For the post-LOCA boric acid precipitation analysis, we understand that NRC has generic concerns regarding boron precipitation evaluation methods. We note that in Reference 3 [NRC letter dated 8/1/2005] NRC has suspended approyal of Westinghouse topical report CENPD-254-P. While CENPD-254-P is applicable to Combustion Engineering plant designs and is not directly applicable to Ginna, generic concerns in Reference 3 have prompted the clarifications provided in Enclosure 2 to this letter. The Ginna EPU boric acid precipitation analysis, provided in Enclosure 7 to Reference 1, was performed consistent with, or conservative with respect to, the methods and assumptions outlined in Reference,4 [Westinghouse letter to NRC dated April 1, 1975] which supports the boric acid precipitation design basis analysis for Ginna. We understand there may be additional generic concerns relating to the Westinghouse post-LOCA boric acid precipitation analysis and, to the extent they apply to Ginna, we intend to work with Westinghouse and your staff to resolve these concerns. Our intention is to provide a supplemental response to the generic boric acid precipitation concerns that apply to Ginna by October 31, 2005.
Should you have questions regarding the information in this submittal, please contact George Wrobel at (585) 771-3535 or george.wrobel~constellation.com.
Ve truly y ,
, snic
Enclosures:
(1) Additional SBLOCA Transient Results (2) Supplemental Information on the Potential for Boric Acid Precipitation (3) List of Regulatory Commitments STATE OF NEW YORK :
- TO WIT:
COUNTY OF W'AYNE I, Mary G. Korsnick, being duly sworn, state that I am Vice President - R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC), and that I am duly authorized to execute and file this response on behalf of Ginna LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Ginna LLC employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
iYA, IY 4' ~9 Subscribed and sworn before me, a Notary Public in and for the State of New York and County of )1O/7 wo ,this /5 day of 2005.
WITNESS my Hand and Notarial Seal: iJ* )
Notary Public My Commission Expires: . SHARONLMI0LER Non POW, StaWef NewYoDk 1 ,;hRabNo.O1MI6017755
/~0 yCovia
-o EVMa DObr21.20 (
Date cc: S. J. Collins, NRC P. D. Milano, NRC Resident Inspector, NRC
ENCLOSURE I R.E. Ginna Nuclear Power Plant Additional SBLOCA Transient Results
2500 2000
.2 aD 1500 en en 0-1000 500 Time (s)
Figure 1: Pressurizer Pressure 1.5-Inch Break
Core Mixture Level Top of Core 32-I I 30- l -- .
l Il 28- - - - - -
26 - X -- -'I-a) - I X 24 -- --------------
20 - -
22 _ I 20- __
18-, l Time (s)
Figure 2: Core Mixture Level 1.5-Inch Break
B Broken Loop Pumped Si Flow
- --- Intact Loop Pumped SI Flow 50-0 E0 - - - - -
- -I -- - - - -- -
,, , I I I I o Cf 0 - - - -- - -- - -- -
I I O- I lI 0, 20 I_________________+_
I I I I HEI O-lI I Time (s)
Figure 3: Broken Loop and Intact Loop Pumped Si Flow Rate 1.5-Inch Break
1100
- I I I I I@ I I I
- II 1000- -~~~~~~
- - ~- --- - - AI-- - - -+ _ _ _ _ _ _ _ _ _ _ l _ _ _
1 uw -, 4 4 .--- I
- I I I I
- I I It I---
I I I I E
70 I t I I
_ I 6-~00 -4 + + 4
- I 1 I I
- I
, , I ,
- I I I
, , , I 40- ,, I,,; , I, I,, ,
0 200 400 60080O0 ITm (s)
Fiur 4: PekCadnIeprtr tPTEeain15lc ra
100 I I, I I l I Il I Il I l I Il I I Il I Il I I Il I I Il I I I, I l I I Il I I Il 80 *+_____ I ___________ I__________
l*- .
I .I I I Il I I I, I I Il I I Il I I Il I I Il 1-I-,
____ A_ ____ __+ __ _ __
E 60
-M W
I1 X -- --- ---
I,
- + _-
0 l ia iI I I U,0 U, 40 on, Ut
- M l I bf 20 l
I , @ I,, , , ,, , ,
_ ! IA I ~ ~ _ AA 0
0 2000 4000 6000 8000 1(0s) 12000 Time (s)
Figure 5: Core Exit Vapor Flow 1.5-Inch Break
2500 lI 2000 - --
a,,
CD) a)
=3 500 - ----- --------------- ------------
0 0 1D00 2000 3000 Time (s)
Figure 6: Pressurizer Pressure 3-Inch Break
Core Mixture Level
-- -- Top of Core 32 3O..
28 - -- - - - - - - - - - - -- - - - - - - - - - -- - - - - - - - - - - - - - - -- - - - - - - - - - - - -- -
25 24 - - -- - - - - - - - - - - - - -
20 18 0 10500 2000 3000 4000 Ti me (s)
Figure 7: Core Mixture Level 3-Inch Break
B Broken Loop Pumped Si Flow I---- Intact Loop Pumped SI Flow 50 -
l l B
n W
l n
. B- - -
I 40 - _ _ A= + _ _ _ _ +
l
/ l
/ l
/ , ,
I I , ,
1 , I r
XE 30- / ' '
-0 I ,
P s +
+
/ , I
_ I ,
/ I I aJ I , ,
cay CD) b1 , l 0 I , ,
rv l l cf) 20- . + +
En l l 10 -
0-I I I I I I I I , f I , I I I 0 1000 2000 3d00 4000 Time (s)
Figure 8: Broken Loop and Intact Loop Pumped SI Flow Rate 3-Inch Break
1200 Ij 1100 - - -
1000 900 -.- - - - - - - - - - - - - - - -
U-ci, I--- --- - - - --- -: - - --- --- -- - -: - --- --- ---
0 800 L, I, CD E
FT I I I I,
700 .. - -
600 I I I I I, 500 *-- -- -- -- -- -- -- -- 1- -- - -
I I, 400 11 Time Figure 9: Peak Cladding Temperature at PCT Elevation 3-Inch Break
250 l
l 200 + +
l l
l l
l l
l l
cn l l
l E 150 l
+ .
+ +
a, 0
l l
l l
100 l cX + + +
U, l l
uM l l
l , . .
cab50 X L ,l l l
. to t .
0 Time Figure 10: Core Exit Vapor Flow 3-Inch Break
ENCLOSURE 2 R.E. Ginna Nuclear Power Plant Supplemental Information on the Potential for Boric Acid Precipitation
. L'..;...
Supplemental Information on the Potential for Boric Acid Precipitation A recent NRC letter to Westinghouse (Reference 1) suspended the approval of a post-LOCA long-term cooling topical report applicable to CE plant designs citing issues related to the potential for boric acid precipitation. While the subject topical report and methodology are not directly applicable to Ginna, issues raised in the NRC letter have prompted the following clarifications and additional information regarding the Ginna boric acid precipitation analysis.
Review of Ginna ECCS Design in Reqards to Boric Acid Precipitation Analysis Methodologv Since Ginna is an upper plenum injection (UPI) design with low head safety injection directly to the upper plenum, conventional 3-loop and 4-loop hot leg recirculation switchover or simultaneous recirculation switchover post-LOCA actions do not apply. Simultaneous hot (UPI) and cold side (SI) injection will occur automatically when RCS pressure decreases below the low head RHR injection pressure (140 psia). Boric acid precipitation calculations are performed only to establish the maximum length of time before UPI initiation after which boric acid precipitation might occur. After UPI and after the start of sump recirculation, the cold leg SI is normally terminated. The calculated time also is conservatively used to establish the time after which cold leg SI injection should be reestablished, once it is terminated. This time will be specified in the Emergency Operating Procedures. Details on specific ECCS design and the anticipated operator actions are given in of the Ginna Tech Spec LAR (Reference 2). The calculated core region boric acid concentration as a function of time for a large break LOCA for the Ginna EPU is given in Figure 1.
This analysis was performed consistent with, or conservative with respect to, Reference 3, which has been the NRC accepted method for Westinghouse design plants and the method that supports the current Ginna design basis analysis. The Reference 3 methodology treats small breaks as non-limiting because of the benefits of lower core voiding, greater SI subcooling, and the higher boric acid solubility limit for SBLOCA RCS pressures.
Boric Acid Precipitation Analysis Methodologv Reference I raises a number of issues related to the methodology used to establish the maximum length of time before UPI initiation after which boric acid precipitation might occur. The most significant issues are the decay heat assumption and the consideration of core and upper plenum voiding as it affects the analysis for determining liquid mixing volume. The Ginna calculations used a best estimate decay heat assumption and neglected voiding as did the calculations for the as-submitted Beaver Valley Units 1 and 2 EPU LAR. Recent boric acid re-analysis cases performed in response to RAls for Beaver Valley Units I and 2 EPU LAR (Reference 4) show that best estimate decay heat assumption and neglected voiding are offset by partial credit for mixing in the lower plenum and by taking full credit for the experimentally determined boric acid solubility limit at the atmospheric boiling temperature of a water/boric acid solution (Figure 2). Figure 3 shows the original and re-analyzed boric acid concentration transient for the Beaver Valley Unit 1 EPU. It is expected that revised calculations for Ginna would show the same result.
References
- 1. Letter dated August 1, 2005 from R. A. Gramm, U. S. Nuclear Regulatory Commission to J. A. Gresham, Westinghouse Electric Company, "Suspension of NRC Approval for Use of Westinghouse Topical Report CENPD-254-P, 'Post LOCA Long-term Cooling Model' Due to Discovery of Non-conservative Modeling Assumptions During Calculations Audit"
- 2. Letter from M. G. Korsnick (Constellation Energy) to D. M. Skay (USNRC), License Amendment Request Regarding Revised Loss of Coolant Accident (LOCA) Analyses -
Changes to Accumulator, Refueling Water Storage (RWST), and Administrative Control Technical Specifications, R. E. Ginna Nuclear Power Plant, Docket No. 50-244, April 29, 2005
- 3. Westinghouse Letter to the NRC, CLC-NS-309, "Long Term Buildup of Boric Acid," 04 75.
- 4. FENOC Letter to NRC, L:-05-112, "Responses to a Request for Additional Information in Support of License Amendment Request Nos. 302 and 173," 07-08-05.
AN I I I I I I I I _'
, 35 ___-n-----~
I I --
I I I 30 .-- I I' _-' ---
C 0
9 25 - - - - - ----- J -_- - - _____--- -L - ________-
C , -. __T 8 J' ,9.5 hrs.. 2927
,20 _ - - - - - - -_ - ------- - _ wt % solubility -
_ _ _ _limit
< 15 - - - - - - - - -- - - - - - - - - - - - - -
, 8.7 hrs., 27.53 U .4 ' wt % solubiilty m 10 ;I _ limit
/ Boric Aid Precipitation 5 ---------- r - Time @ 6.5 hrs.. 23.53 -- -- - -- -
.wt % solubilitylimit n , I I II IJ 0 10,000 20,000 30,000 40,000 50,000 Time (sec)
Figure 1 - Ginna Post-LOCA Core Region Boric Acid Concentration vs. Time I - Experimentally Measured Limit 80 F 70
-60
.1 50 n 40 0 30 U)30 20
<C.) 20 0
co 10 0
0 50 100 150 200 250 300 350 Temperature (°F)
Figure 2 - Boric Acid Solubility Limit vs. Temperature [Cohen, 19691
-R e-analysis ---- Original .---- Solubility Limit 50 .
4 5 - - - - - - - - - -_I - - - - - - - - ---I - - - - - - - - -----
I - - - - - - . -_-_--_-__-__-_-
I -_,--_- -_-__
I I
{ 235 -- - -- - --- --- - - ---
i / I I I I 0.410--r---
2 5n~~~~~~0 LIP MxiiBeis/ng 4--1 Jaris Epce
-r------
Eries Eece I - Pre cipitation 0 -
O.I . I -. .- .. .. .
LI MxIng Beg Earliest Expected
, ; , .Time Onginalyi
..-- -- Precp, o 0 10,000 20,000 30000 40,000 50I000 Time (sec)
Figure 3 - Beaver Valley Unit 1 - Boric Acid Precipitation, Original Analysis versus Re-analysis
ENCLOSURE 3 R.E. Ginna Nuclear Power Plant List of Regulatory Commitments The following table identifies those actions committed to by R.E. Ginna Nuclear Power Plant, LLC in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
REGULATORY COMMITMENT DUE DATE Provide a supplemental response to the generic Prior to October 31, 2005.
boric acid precipitation concerns that apply to Ginna.