Plant Status Report
ML051940613
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/04/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051940613 (2)


Text

I,-1 Committed to Nuclear Excellence g Plant Status Report Plant: Point Beach Nuclear Plant Date: Tuesday, May 04, 2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit 1 is in refueling shutdown (Mode 6). Unit 2 is at 100% power.

Days Without LTA: 590 Homeland Security Condition: Yellow

- . .. i. ,`, ' A--.  :;-: f*; " .'"t§.- Unit2t 2 l:'i-l< ..

PWR PWR MWE MVE rWR PWR MWE MWE Mode Level (Gross) (Net) MIode Level (Gross) (Net) 6 0% 0 0 1 100% 543.8 521.6 Days On Line: 0 Days Since Last Reactor Trip: 291 Days On Line: 165 Days Since Last Reactor Trip: 297

___________ ~.'-Technical Specificatiorf Actidn-Conditi 'ns - *' _'-______:-_;".-__ _:_}-

Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days) Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2 Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27/04 U2C RMW service.

Supply _ I AU0IALEC SR ~ '1 RE1id4r __ _ _ _ __ _ _ _ _ __ _ _ _ _ __ _ _ _ _

- . ~ ; , .','-Ma'or.E'uinmesit Service or.Dcgiadeed';- '

'O'tof  : ... "

Item Unit Condition Date Time l Work Order Number lDue Date- Responsibility G-02, Emergency 0 Heat exchanger 5/3/04 0100 WO 0310384 / WO 0310394. 5/3/04 J. Brander Diesel Generator cleaning. Clean heat exchangers. .

Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2 Valve comes off shut seat Coordinate plan with Plant 5/704 C. Hill Reactor Makeup momentarily when RMW pump Manager.

Supply starts.

Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. Carberry Ejector Gas Monitor related. Scheduled completion is 5/14/04.

2TE-2259, 2P-28B 2 Minor steam leak. Prepare work package to repair leak 5n/04 J. Brander SGFP Discharge weekend of 05/22/04.

Temperature Element WO Initiation Tag #204297

'tem 'g-.> t7;'A

' regateRe4uiew'fssues- Wi

'- A,. r.- \;

Item Unit Condition Actions Planned DueDate Responsibility NONEN I ~NONEl kWtmon m ftd rood was deedW 7t- 4-A kI rammwii h te do Aormc AcL exepir______

I- x Page 1 of 2

Cornmitted to Nuclear Excellence Plant Status Report

Outstanding'Operibility Determinations
.KŽ<-  ; &i;'.I ' ;2 NONE

.- .'..-~: d&~. E ;

- .'": -.. iProtected Equipment... .,-; .

L* .5 -. 1'iLoad  ; Si Changes PlannEdorUnlanncd) * '.'; -:t NONE

,j,,~A--"-'-"~

, ; l:' Thr .1~;<- .;-4Reactor-CoolantSystem'Leakaiig ,,-" -. ': -'~-~ '-l-4'; '

Unit 1 Unit 2 Unidentified (gpm) 0 0.07 (No leak rate determined due to draindown)

Identified (gpm) 0 0.02

-'!>'@'x--1>A_^-

-';' ' '* ff1 'iM joir Tests anid E 'ol ' io ' Scheduled in ,Ne 't24Hus';.-: >P ' ",,,l,-, al'l',':'

345 KV Line 11l out of service for breaker work. 513/04, 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />, to 5/4/04, 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.

IT-I l, P-12A/B spent fuel pool cooling pump and valve test.

G-02, emergency diesel generator return to service.

Align both "A"train 4160 volt safeguards buses to G-02 emergency diesel generator for 480 volt safeguards MCC I B-42 outage.

Unit 2, 2TS-34, Unit 2 containment accident fan cooler units surveillance test.

Page 2 of 2