MONTHYEARML0520300972004-05-24024 May 2004 Plan-of-the Day Meeting with Handwritten Notes ML0520300612004-05-21021 May 2004 Plan-of-the Day Meeting with Handwritten Notations ML0519600622004-05-20020 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519903882004-05-19019 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519903732004-05-18018 May 2004 Plan-of-the-Day Meeting ML0519505902004-05-17017 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519504332004-05-14014 May 2004 Plan-of-the-day Meeting, with Handwritten Notations, Day 41 ML0519504252004-05-13013 May 2004 Plan-of-the-day Meeting, with Handwritten Notations, Day 40 ML0519503472004-05-12012 May 2004 Plan-of-the-day Meeting, with Handwritten Notations, Day 39 ML0519503262004-05-11011 May 2004 Plan-of-the-Day Meeting ML0519503752004-05-10010 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519501862004-05-0707 May 2004 Plan-of-the-Day Meeting ML0519406132004-05-0404 May 2004 Plant Status Report ML0519406372004-05-0303 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519405922004-04-30030 April 2004 Plan-of-the-Day Meeting ML0519405882004-04-30030 April 2004 Plan-of-the-Day Meeting ML0519405902004-04-30030 April 2004 Plant Status Report ML0519304802004-04-29029 April 2004 Plant Status Report with Handwritten Notations ML0519304772004-04-28028 April 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519304672004-04-27027 April 2004 Plan-of-the-Day Meeting ML0519200672004-04-16016 April 2004 Plan-of-the-Day Meeting with Handwritten Notes, Day 13 ML0508700472004-04-15015 April 2004 POD H.O. - Point Beach Nuclear Plant U1R28: Day 12 ML0519200752004-04-14014 April 2004 Plan-of-the-Day Meeting, Day 11 ML0508405362004-04-14014 April 2004 POD H.O. - Point Beach Nuclear Plant U1R28: Day 11 ML0519200552004-04-13013 April 2004 Plant Status Report ML0519200532004-04-13013 April 2004 Plan-of-the-Day Meeting, Day 10 ML0508405272004-04-12012 April 2004 Plant Status Report - Point Beach Nuclear Plant ML0519200432004-04-12012 April 2004 Plan-of-the-Day Meeting ML0518904632004-04-0909 April 2004 Plan-of-the-Day Meeting ML0518904682004-04-0808 April 2004 Plan-of-the-Day Meeting ML0518904722004-04-0808 April 2004 Plant Status Report ML0518904572004-04-0707 April 2004 Plan-of-the-Day Meeting with Handwritten Notations ML0518904532004-04-0707 April 2004 Plant Status Report ML0518904552004-04-0606 April 2004 Plan-of-the Day Meeting ML0518904472004-04-0505 April 2004 Plan-of-the-Day Meeting with Handwritten Notations 2004-05-07
[Table view] |
Text
C3 -5' Committed to Nuclear Ex NMC-x~
- 7>
Plant Status Report Plant: Point Beach Nuclear Plant Date: Thursday. ADril 08. 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit 1 is at 100 degf cold shutdown (Mode 5). Draindown per OP-4D in progress. Unit 2 is at 100% power.
Days Without LTA: 565 Homeland Security Condition: Yellow PWR PWR MWE MWE PWR PWR MWE MWE Mode Level (Gross) (Net) Mode Level (Gross) (Net) 5 0% 0 0 1 100% 545.8 523.6 Days On Line: 0 Days Since Last Reactor Trip: 266 Days On Line: 140 Days Since Last Reactor Trip: 272
'w.t. tionTAction'Condition
-.- 4s-TechiicaiSecifi ... W -
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days) Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2 Out of 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosseau 8/27/04 U2C RMW service.
supply
"*-¢*i.H,,2,5%v--: 7 S._ rosz-NiX.M a io-rEq~u ip- O ut ent of Dtae Sevctor Due Date Responsibility Item Unit Condition Date Time W Order Number NONE Item Unit Condition Actions Needed Due Date ResDonsibility W-30B, F-23/F-29 0 Motor failed. Motor on-site for re-installation. 4/9/04 D. Laing PAB Exhaust Filter Fan 2RC-508, U2C 2 Valve comes off shut seat Provide decision tree to Plant 4116104 K. Krause Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5/704 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. Carberry Ejector Gas Monitor related. Scheduled completion is 5/14/04.
75,. -R , o v :-.
NONE Initonntion Inthis record vss deleted in accordance with th Freedom of Inftormat°"
AoiRlS I Page I of 2
I m oa.
Commilned to Hclear Excsllanct-Plant Status Report Unit I Unit 2 Unidentifled (gpm) 0 0.05 (No leak rate deienmined due to draindown)