R. Mictzel Morris - PBNP Plant Status Reoort.doc ___- 'P aaefI I.
NMt e Commtrtedtr to Nuclear Excs/re Plant Status Report Plant: Point Beach Nuclear Plant Date: Monday. Anril 12.2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit I is at refuel shutdown (Mode 6). Reactor coolant system is at 70%. Unit 2 is at 100% power.
Days Without LTA: 569 Homeland Security Condition: Yellow
- : ::-. ; . Unit 1:':!.I : .,- .t'-n- ' , ,, -. - -,., Unit 2 : --; - - -
PNVR PN'R I*I VE NINIVE PNR PWVR rsI IVE NINVE Mlode Level (Gross) (Net) - >ode Level (Gross) (N~et) 6 0% 0 0 1 100%/ 544.6 522.5 Days On Line: 0 Days Since Last Reactor Trip: 270 Days On Line: 144 Days Since Last Rtactor Trip: 276
- Technical Specification Action Conditions;:.. _____--_-
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (hlr/Days) Spec Expected Number RTS Date Date Time Date Time
/2RC-508, 2 Outof 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosseau 8/27/04 U2C RMW service.
'- ' .~. 'aorEquipmentOutofServiceorDegradedt':.. - . >. - :
Item Unit Condition Date Time Work Order Number Due Date Responsibility K-2B, Instrument 0 Failed SW solenoid. 418104 1708 WO 0407694 4/12/04 D. Laing Air Compressor G-500, G-05 GT 0 Out of service. Fuel 4/11/04 2250. WO 0407739 4/12/04 N. Stuart Generator oil leak.
Starting Diesel E n gine _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
perational Prob ems IConcerns' .I.*
m' Item Unit Condition Actions Needed Due Date Responsibility W-30B, F-231F-29 0 Motor failed. Motor on-site for re-installation. 4/10/04 D. Laing PAB Exhaust Filter Fan 2RC-50. U2C 2 Valve comes off shut seat Provide decision tree to Plant 4116/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.
Supply starts. . .
Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5/704 N. Stuart Letdown Flow 2RE-215,2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. Carberry Ejector Gas Monitor related. Scheduled completion is 5/14/04.
NONEl
.-. I-Item
- __-_r l Unit ll
- ::- --. Aggregate Condition
- < Reiew ofIssuesi o -: .
- Actions Planned Due Date J :-
Responsibilitl I
Page I of 2
R. Michiael Morris - PBNP Plant Status Report.doc Page 21 Commited to Nudel EaCr/en Plant Status Report
'-Reortabie Events ' i -
NONE
' '- '.Outstanding Operability Determinations NONE
. - Protected Equipment .
2P-29, Aux Feedwater Turbine-Driven Pump / P-38A/B Aux Feedwater Motor-Driven Pumps /
P-32A-F Service Water Pumps / K-2A/B Instrument Air Compressors / K-3A/B Service Air Compressors /
G-OIIG-02/G-03/G-04 Emergency Diesel Gcnerators / Protected Equipment for Ul R28 Reduced Inventory Contingency Plan
- .- -w-> +.---
- LoadChanges(PlannedorUnplanned);. -
NONE Page 2 of 2