Text
R. Mictzel Morris - PBNP Plant Status Reoort.doc
'P aae fI
.I NMt e
Commtrtedtr to Nuclear Excs/re Plant Status Report Plant: Point Beach Nuclear Plant Date: Monday. Anril 12.2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit I is at refuel shutdown (Mode 6). Reactor coolant system is at 70%. Unit 2 is at 100% power.
Days Without LTA: 569 Homeland Security Condition: Yellow Unit 1:':!.I
.,-.t'-n-
-,., Unit 2 : --; -
PNVR PN'R I* I VE NINIVE PNR PWVR rsI IVE NINVE Mlode Level (Gross)
(Net)
>ode Level (Gross)
(N~et) 6 0 %
0 0
1 100%/
544.6 522.5 Days On Line: 0 Days Since Last Reactor Trip: 270 Days On Line: 144 Days Since Last Rtactor Trip: 276
- Technical Specification Action Conditions;:..
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (hlr/Days)
Spec Expected Number RTS Date Date Time Date Time
/2RC-508, 2
Outof 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosseau 8/27/04 U2C RMW service.
.~.
'aorEquipmentOutofServiceorDegradedt':..
Item Unit Condition Date Time Work Order Number Due Date Responsibility K-2B, Instrument 0
Failed SW solenoid.
418104 1708 WO 0407694 4/12/04 D. Laing Air Compressor G-500, G-05 GT 0
Out of service. Fuel 4/11/04 2250.
WO 0407739 4/12/04 N. Stuart Generator oil leak.
Starting Diesel E n gine m'
.I perational Prob ems IConcerns' Item Unit Condition Actions Needed Due Date Responsibility W-30B, F-231F-29 0
Motor failed.
Motor on-site for re-installation.
4/10/04 D. Laing PAB Exhaust Filter Fan 2RC-50. U2C 2
Valve comes off shut seat Provide decision tree to Plant 4116/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2
Inadequate excess letdown flow.
Open and inspect, 2CV-285.
5/704 N. Stuart Letdown Flow 2RE-215,2HX-46 Air 2
Elevated indication, temperature 4 step action plan is developed.
5/14/04 B. Carberry Ejector Gas Monitor related.
Scheduled completion is 5/14/04.
.-. I-
__-_r Aggregate Reiew ofIssuesi o
Item l Unit Condition
- Actions Planned Due Date J Responsibilitl NONEl ll I
Page I of 2
R. Michiael Morris - PBNP Plant Status Report.doc Page 21 Commited to Nudel EaCr/en Plant Status Report
'-Reortabie Events '
i NONE
'.Outstanding Operability Determinations NONE
- Protected Equipment.
2P-29, Aux Feedwater Turbine-Driven Pump / P-38A/B Aux Feedwater Motor-Driven Pumps /
P-32A-F Service Water Pumps / K-2A/B Instrument Air Compressors / K-3A/B Service Air Compressors /
G-OIIG-02/G-03/G-04 Emergency Diesel Gcnerators / Protected Equipment for Ul R28 Reduced Inventory Contingency Plan
-w->
-+.---
LoadChanges(PlannedorUnplanned);.
NONE Page 2 of 2