Plant Status Report - Point Beach Nuclear Plant
ML050840527
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/12/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML050840527 (2)


Text

R. Mictzel Morris - PBNP Plant Status Reoort.doc

'P aae fI

.I NMt e

Commtrtedtr to Nuclear Excs/re Plant Status Report Plant: Point Beach Nuclear Plant Date: Monday. Anril 12.2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit I is at refuel shutdown (Mode 6). Reactor coolant system is at 70%. Unit 2 is at 100% power.

Days Without LTA: 569 Homeland Security Condition: Yellow Unit 1:':!.I

.,-.t'-n-

-,., Unit 2 : --; -

PNVR PN'R I* I VE NINIVE PNR PWVR rsI IVE NINVE Mlode Level (Gross)

(Net)

>ode Level (Gross)

(N~et) 6 0 %

0 0

1 100%/

544.6 522.5 Days On Line: 0 Days Since Last Reactor Trip: 270 Days On Line: 144 Days Since Last Rtactor Trip: 276

- Technical Specification Action Conditions;:..

Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (hlr/Days)

Spec Expected Number RTS Date Date Time Date Time

/2RC-508, 2

Outof 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosseau 8/27/04 U2C RMW service.

.~.

'aorEquipmentOutofServiceorDegradedt':..

Item Unit Condition Date Time Work Order Number Due Date Responsibility K-2B, Instrument 0

Failed SW solenoid.

418104 1708 WO 0407694 4/12/04 D. Laing Air Compressor G-500, G-05 GT 0

Out of service. Fuel 4/11/04 2250.

WO 0407739 4/12/04 N. Stuart Generator oil leak.

Starting Diesel E n gine m'

.I perational Prob ems IConcerns' Item Unit Condition Actions Needed Due Date Responsibility W-30B, F-231F-29 0

Motor failed.

Motor on-site for re-installation.

4/10/04 D. Laing PAB Exhaust Filter Fan 2RC-50. U2C 2

Valve comes off shut seat Provide decision tree to Plant 4116/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.

Supply starts.

Unit 2, Excess 2

Inadequate excess letdown flow.

Open and inspect, 2CV-285.

5/704 N. Stuart Letdown Flow 2RE-215,2HX-46 Air 2

Elevated indication, temperature 4 step action plan is developed.

5/14/04 B. Carberry Ejector Gas Monitor related.

Scheduled completion is 5/14/04.

.-. I-

__-_r Aggregate Reiew ofIssuesi o

Item l Unit Condition

- Actions Planned Due Date J Responsibilitl NONEl ll I

Page I of 2

R. Michiael Morris - PBNP Plant Status Report.doc Page 21 Commited to Nudel EaCr/en Plant Status Report

'-Reortabie Events '

i NONE

'.Outstanding Operability Determinations NONE

- Protected Equipment.

2P-29, Aux Feedwater Turbine-Driven Pump / P-38A/B Aux Feedwater Motor-Driven Pumps /

P-32A-F Service Water Pumps / K-2A/B Instrument Air Compressors / K-3A/B Service Air Compressors /

G-OIIG-02/G-03/G-04 Emergency Diesel Gcnerators / Protected Equipment for Ul R28 Reduced Inventory Contingency Plan

-w->

-+.---

LoadChanges(PlannedorUnplanned);.

NONE Page 2 of 2