Committedto NucleariEcallenc~ ,p fS6- T /41/2f,~

Plant Status Report Plant: Point Beach Nuclear Plant Date: Wednesday, April 07.2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit 1 is at 100 degf cold shutdown (Mode 5). Draindown per OP-4D in progress. Unit 2 is at I100% power.

Days Without LTA: 564 Homeland Security Condition: Yellow PWR PWR MWE A4A)DIWE PWR rWR MWE~ MWE Mode Level (Gross) (Net) Mode Level (Gross) (Net) 5 0% 0 0 1 100% 545.5 523.7 Days On Line: 0 Days Since Lh*s21eactor Trip: 265 Days On Line: 139 Days Since Last Reactor Trip: 271

-=1:01--'z'CL.14 i; 111i'. O &Wfii6fil Si5i6ifi6itid5' !i i ' ! 1, Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days) Spec Expected Number __________RTS Date Date TimeDate Time 2RC-508, 2 Out of 11/9/03. 0749 31 Days 3.6.3.A 4/26104 1900 M. Rosseau 8127104 Supy 2/0 Out of 4/6/04 2205 24 Hours 3.8.1.E3 4/7/04 2205 N. Stuart 4/7/04

~6K~sservice.(M6 oi S ~/

_ _ _ ~G I I Item Unit Condition Date Time Work Order Number Due Date Responsibililty G.02, Emergency 0 Fast start relay out 4/6/04 2205 CAP055402 / no work order. 4/7/04 D. Laing Diesel Generator of service.__ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

D.3 05, Swing 0 No batteiy charger 4/7/04 0400 WO Initiation Tag #204352 4/7/04 D. Laing Station Battery _ __ supply. _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _

1-~t~-i~;~Ir_~-,~'JipOe-ratlidiaiProbleiuii'7Cnie. 2X7sj-vl Item unit Condition Actions Needed Due Date_ Responsibility W-30GB, F-23/F-29 0 Motor failed. Motor shipped off-site for rebuild. 4/9/04 D. Laing PAB Exhaust Filter Due back 4/6/04.

F an_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _

2RC-508, U2C 2 Valve comes off shut seat Provide decision tree to Plant 4/16/04 K.Krause Reactor Makeup momentariiy when RMW pump Manager.

Supply starts. _____

Unit 2, Excess 2 Inadequate excess letdown Dlow. Open and inspect, 2CV-285. 5/7/04 N. Stuart Letdow n F iow__ _ __ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _

2RE-215, 2H-X46 Air 2 Eievated indication, temperature 4 step action pian is developed. 5/14/04 B. Carberry Ejector Gas Monitor ____related. Scheduied completion is 5114/04. _______ _______

I NONE Item I

UnitI I _ __

ConditionI Actions Planned I _I Due Date I Responsiblity information IntIfis rucord was d#1*td inaccordance with t~. Freedom of Inforratiofi Act, vemptiont V ...- -...

FoI

- .- Pagel1 of 2 S- C; 6

NMC Cotnmiittd to Nuclear Exce flnc,1P Plant Status Report i-.{ z <-;E v>eb; Unplanned LCO 3.8.1; Notified NRC Resident.

Page 2 of 2