C eN Committed to Nuclear Exlen Plant Status Report Plant: Point Beach Nuclear Plant Date: Friday, April 30, 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit I is in refueling shutdown (Mode 6). Unit 2 is at 100% power.
Days Without LTA: 586 Homeland Security Condition: Yellow
~--;. -)i~ -nitI: ::- Unit2-;=
- ,,t--> i ;sr 2f- z rWR PWR MWE MWE PWR PWR MWE MUWE Mode Level (Gross) (Net) Mode Level (Gross) (Net) 6 0% 0 0 1 100% 543.8 521.8 Days On Line
- 0 Days Since Last Reactor Trip: 287 Days On Line: 161 Days Since Last Reactor Trip: 293
,- , - - . At. .. ..; - - -.: ' x,' .T- i rn .r - . ;-; :1: ':
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days) Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2 Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27104 U2C RMW service.
A Ma ui me Out . of Sevice or Degraded :,.i2, , UA, Item Unit Condition Date Time Work Order Number Due Date Responsibility 2P-2A, Charging 2 Out of service. 4/29104 0357 WO 0400329 4/29/04 R. Brittingham Pump _
-e / i*-;.-F *:>i:- ;N.: n :OertionalProblemisl.Concerns 51,tir; -- L . i?{4-.',,
Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2 Valve comes off shut seat Provide decision tree to Plant 4/30/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. Carberry Eiector Gas Monitor related. Scheduled completion is 5/14/04.
____________ Unit; e ie woflse-5-- -gg DateRe Item Unit Condition Actions Planned § DueDate TResponsibilitv NONE . _ Ii
-.Re NortabN Events-NONIE kL-w krmomrrin NA Mis record was d&ed
!naccordance wim efiedcn of Irmbmm Page 1 of 2 Actb exenrn,
_ =o
Committed to Nuclear E celfencet Plant Status Report
'.-'. . :Outs.tandina 0erability.Detrminatio-is"'!,'.' ..
OPR-109, IT-10 Aux Feedwater Motor-Driven Pump Acceptance
.:.x- 'i'-,Protected
,, Equipment. -'i '- . . - .. ' ..-
.:7:-j-...- .:.2'Load ChAnges(Plannided 6r:nl~fi1),W~~<:;;
NONE A;~i
- 4' ~
I
- Redctor'Coblant
', System Leakage' ,,' ' i . :
Unit I Unit 2 Unidentified (gpm). 0.05 (No leak rate determined due to draindown)
Identified (gpm)0.02
~AidEvohItifofis Scheduled In Next 24 Hours ~
IX-04, 13.8 KV- 4160 V transformer out of service. (Pending procedure resolutions)
Unit 2, 21CP 2.13, 4160 volt undervoltage testing.
Unit 2, 2TS-1OA, containment air lock door seal test.