C eN Committed to Nuclear Exlen Plant Status Report Plant: Point Beach Nuclear Plant Date: Friday, April 30, 2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit I is in refueling shutdown (Mode 6). Unit 2 is at 100% power.

Days Without LTA: 586 Homeland Security Condition: Yellow

~--;. -)i~ -nitI:

i

sr 2f-z Unit2-;=

,,,,,t-rWR PWR MWE MWE PWR PWR MWE MUWE Mode Level (Gross)

(Net)

Mode Level (Gross)

(Net) 6 0%

0 0

1 100%

543.8 521.8 Days On Line: 0 Days Since Last Reactor Trip: 287 Days On Line: 161 Days Since Last Reactor Trip: 293 At.

.T-x,'

i rn

.r -

1: ':

Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)

Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2

Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27104 U2C RMW service.

A Ma ui me Out of Sevice or Degraded :,.i2, UA, Item Unit Condition Date Time Work Order Number Due Date Responsibility 2P-2A, Charging 2

Out of service.

4/29104 0357 WO 0400329 4/29/04 R. Brittingham Pump

-e / i*-;.-

F

  • >i:-
N.

n :OertionalProblemisl.Concerns 51,tir; 4-.',,

-- L.

i?{

Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2

Valve comes off shut seat Provide decision tree to Plant 4/30/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.

Supply starts.

Unit 2, Excess 2

Inadequate excess letdown flow.

Open and inspect, 2CV-285.

5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2

Elevated indication, temperature 4 step action plan is developed.

5/14/04 B. Carberry Eiector Gas Monitor related.

Scheduled completion is 5/14/04.

Unit;

-gg e

DateRe ie woflse-5--

Item Unit Condition Actions Planned

§ DueDate TResponsibilitv NONE Ii

-.Re NortabN Events-NONIE kL-w krmomrrin NA Mis record was d&ed

!n accordance wim e fiedcn of Irmbmm Actb exenrn,

=o Page 1 of 2

Committed to Nuclear E celfence t

Plant Status Report

'.-'.

Outs.tandina 0erability.Detrminatio-is"'!,'.'

OPR-109, IT-10 Aux Feedwater Motor-Driven Pump Acceptance

.:.x-

'i'-,Protected Equipment.

i

..- I

.:7:-j-...-

.:.2'Load ChAnges(Plannided 6r:nl~fi1),W~~<:;;

-A;~i 4'

~

NONE Redctor'Coblant System Leakage',,'

i Unit I Unit 2 Unidentified (gpm).

0.05 (No leak rate determined due to draindown)

Identified (gpm)0.02

~AidEvohItifofis Scheduled In Next 24 Hours ~

IX-04, 13.8 KV-4160 V transformer out of service. (Pending procedure resolutions)

Unit 2, 21CP 2.13, 4160 volt undervoltage testing.

Unit 2, 2TS-1OA, containment air lock door seal test.