C eN Committed to Nuclear Exlen Plant Status Report Plant: Point Beach Nuclear Plant Date: Friday, April 30, 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit I is in refueling shutdown (Mode 6). Unit 2 is at 100% power.
Days Without LTA: 586 Homeland Security Condition: Yellow
~--;. -)i~ -nitI:
i
- sr 2f-z Unit2-;=
,,,,,t-rWR PWR MWE MWE PWR PWR MWE MUWE Mode Level (Gross)
(Net)
Mode Level (Gross)
(Net) 6 0%
0 0
1 100%
543.8 521.8 Days On Line: 0 Days Since Last Reactor Trip: 287 Days On Line: 161 Days Since Last Reactor Trip: 293 At.
.T-x,'
i rn
.r -
- 1: ':
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)
Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2
Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27104 U2C RMW service.
A Ma ui me Out of Sevice or Degraded :,.i2, UA, Item Unit Condition Date Time Work Order Number Due Date Responsibility 2P-2A, Charging 2
Out of service.
4/29104 0357 WO 0400329 4/29/04 R. Brittingham Pump
-e / i*-;.-
F
- >i:-
- N.
n :OertionalProblemisl.Concerns 51,tir; 4-.',,
-- L.
i?{
Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2
Valve comes off shut seat Provide decision tree to Plant 4/30/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2
Inadequate excess letdown flow.
Open and inspect, 2CV-285.
5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2
Elevated indication, temperature 4 step action plan is developed.
5/14/04 B. Carberry Eiector Gas Monitor related.
Scheduled completion is 5/14/04.
Unit;
-gg e
DateRe ie woflse-5--
Item Unit Condition Actions Planned
§ DueDate TResponsibilitv NONE Ii
-.Re NortabN Events-NONIE kL-w krmomrrin NA Mis record was d&ed
!n accordance wim e fiedcn of Irmbmm Actb exenrn,
=o Page 1 of 2
Committed to Nuclear E celfence t
Plant Status Report
'.-'.
- Outs.tandina 0erability.Detrminatio-is"'!,'.'
OPR-109, IT-10 Aux Feedwater Motor-Driven Pump Acceptance
.:.x-
'i'-,Protected Equipment.
i
..- I
.:7:-j-...-
.:.2'Load ChAnges(Plannided 6r:nl~fi1),W~~<:;;
-A;~i 4'
~
NONE Redctor'Coblant System Leakage',,'
i Unit I Unit 2 Unidentified (gpm).
0.05 (No leak rate determined due to draindown)
Identified (gpm)0.02
~AidEvohItifofis Scheduled In Next 24 Hours ~
IX-04, 13.8 KV-4160 V transformer out of service. (Pending procedure resolutions)
Unit 2, 21CP 2.13, 4160 volt undervoltage testing.
Unit 2, 2TS-1OA, containment air lock door seal test.