Plant Status Report with Handwritten Notations
ML051930480
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/29/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051930480 (2)


Text

{{#Wiki_filter:Committed to Nuclear Excellence,. Plant Status Report Plant: Point Beach Nuclear Plant Date: Thursday, April 29, 2004 Operations Report (Summary of Last 24 Hours of Operations): Unit 1 is in refueling shutdown (Mode 6). Unit 2 is at 100% power. Days Without LTA: 585 Homeland Security Condition: Yellow PWR PEER MWE MWE PWR PWR MWE MWE Mode Level (Gross) (Net) Mode Level (Gross) (Net) 6 0% 0 0 1 100% 543.3 521.3 Days On Line: 0 Days Since Last Reactor Trip: 286 Days On Line: 160 Days Since Last Reactor Trip: 292 ag..'a .,:.'-T': ~:;T c nc ln Ii'in ct Iniin .,L- -. ':.b

l Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (HrlDays)

Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2 Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27/04 U2C RMW service. Supply. 'v' M a r uiment Out o Sevice-or D _Aed__;_i: Item Unit Condition Date Time Work Order Number Due D nsibility NONE ':a ' ' @l .' :; -', :.E*a-{' 7 - Y ~ ~ O p' ier ' tio n al P.ro b l e' ms l C O n ce rn s ' ' - -;8 tS:. ~ T Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2 Valve comes off shut seat Provide decision tree to Plant 4/30/04 K. Krause Reactor Makeup momentarily when RMW pump Manager. Supply starts. Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. Carberry Ejector Gas Monitor related. Scheduled completion is 5/14/04. 2P-2A, Charging 2 Excessive seal leakagc/prevents WO 0400329, Priority 3. 4/29/04 R. Brittingham Pump continuous use of pump. Work Scheduled 4/29104.

  • .~

' ~-; . ' A g e a t e v i e wo f is s ue s d Item Unit Condition Actions Planned Due Date l Responsibility NONE E = I _ [; U l< a; ; u l,; < ^4 - :\\:, r'

- l 'Re p aiia b l e E v e nt s :

'I- "'~- - '" '4 hae-; .- -4;; I NONE FdA SI/G Y /v4h [ J / Aieta) ,-3 Page I of 2 in achdance vt ft Freedomi Of Inibma~ Act exemptions PO R-0p.;

NM K Committed to Nuclear Exc nce Plant Status Report -Outstanding Operability Determinations NONE

  • m

' I'

  • ProtecteidEq unient -:.

-Load'Chan'e '(Planned'or Unplanned).. ,>,-,-b.. I NONE _p -r ` -Rea'toi:Coo.fit Systemieakgej': Unit I Unit 2 Unidentified (gpm) 0 0.04 (No leak rate determined due to draindown) Identified (gpm) 0 0.04 4- ' TMajorTests'anddEyolutions'Scheddled.in Next 24 Houis IX.04, 13.8 KIV-4160 V transformer out of service. (Pending procedure resolutions) Page 2 of 2}}