ML051240468

From kanterella
Jump to navigation Jump to search
Initial Submittal of the Simulator Jpms for the LaSalle Initial Examination - March 2005
ML051240468
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/07/2005
From: Ross J
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML050900103 List:
References
50-373/05-301, 50-374/05-301 50-373/05-301, 50-374/05-301
Download: ML051240468 (83)


Text

INITIAL SUBMITTAL OF THE SIMULATOR JPMS FOR THE LASALLE INITIAL EXAMINATION MARCH 2005

Exelon Nuclear Job Performance Measure Downshift RR to Slow with One Pump Tripping to Off JPM Number: NRC-Simu lator-01 Revision Number: 00 Date: II/03/2004 Developed By:

Instructor Date Validated By:

SME or Instructor Date Review By: -

Operations Representative Date

NRC-Simulator-01 Revision: 00 Page 2 of 13

- JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

I.Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (In-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.

-- 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date b

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/lnstructor Date SME/lnstructor Date SME/lnstructor Date

NRC-Simulator-0 1 Revision: 00 Page 3 of 13 Revision Record (Summary)

1. Revision 00: This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005. It was modeled after LaSalle County Station JPM S-RR-OS.

NRC-Simulator-0 1 Revision: 00 Page 4 of 13 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 1 15 (Ready to downshift RR)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Load the Computer Aided Exercise Program fiom the JPM Floppy disk (NRC-Simulator-01 .O.cae) or manually enter the following:

- imf mrcOl5 (1 B RR Pump trips to Off during downshift)

3. Remove the >95.2%FCL placard.
4. Silence, Acknowledge and Reset the annunciators. Then Acknowledge the Process Computer Alarms.
5. Clear BOTH Sequence of Events Recorder (SER) monitor screens.

6 . When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.

7. This completes the setup for this JPM.

b

NRC-Simulator-0 1 Revision: 00 Page 5 of 13 2- ASSOCIATED CAEPs

  1. Setup for NRC Simulator JPM Simulator-01
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-0l.O.cae
  1. Revision: 00
  1. Revision Date: 1 0 / 2 3 / 2 0 0 4
  1. Revised By: jer
  1. This is an Alternate Path JPM. The examinee will downshift RR Pumps
  1. Per LOP-RR-08 and the 1B RR Pump will fail to go to slow speed. The
  1. examinee will end up with one pump in slow and one pump off
  1. requiring actions per LOA-RR-101.
  1. 1B RR Pump trips to OFF when downshifting imf mrc015
  1. This ends this CAEP.

NRC-Simulator-01 Revision: 00 Page 6 of 13

-- INITIAL CONDITIONS You are the Unit-1 Assist NSO:

0 A normal unit shutdown is in progress per LGP-2-1.

0 LGP-2-1 is completed up to step E. 1.6.

0 1A and 1B LFMG pre-start checks have been completed satisfactorily.

0 Power has been reduced as low as possible in preparation for the downshift.

0 RR Hydraulic system is in operation per LOP-RR-03, Startup, Operation and Shutdown of Reactor Recirc Hydraulic Power Unit.

INITIATING CUE The Unit Supervisor has directed you to downshift the Reactor Recirculation (RR) pumps per LOP-RR-08. Inform the Unit Supervisor when both RR pumps are downshifted.

,-- Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 B ~ 8 8 8 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 1 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

0 Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the examinee to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the examinee acknowledges the initiating cue.

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 8 = 8 8 8 8 = 8 8 8 8 8 8 8 8 8 8

  • 8 8 8 8 8 8 8 8 ~

NRC-Simulator-01 Revision: 00 Page 7 of 13

.-. JPM Start Time:

STEP ELEMENT I CUE

~

Another NSO will address all balance of plant alarms.

  • N/A Obtains copy of LOP-RR-08. 0 Obtains copy of LOP-RR-08

~~ ~

CUE After examinee demonstrates ability to obtain a current copy of the procedure, give him a copy of LOP-RR-08.

B.2 Checks Reactor Power has been Checks flow -60% and FCL - - -

reduced as low as practical to <66.7%.

reduce transients. Checks Flow Control Line <66.7% to ensure instability regions are avoided.

~ ~ ~

CUE If asked, tell the examinee that Reactor Power has been reduced as low as possible in preparation of the downshift.

B.3 Reviews LOA-RR- 1 0 1. Reviews LOA-RR- 1 0 1 W

C. and Reviews PRECAUTIONS and Reviews Precaution and - - -

D. LIMITATIONS section of Limitations.

LOP-RR-08.

E.1 Prior to shifting to slow speed:

E.1.1 lG33-Fl01 should be open to At 1H13-P602, VERIFIES - - -

ensure >25 gpm bottom head drain lG33-Fl01 open and RT Bottom flow for correct temperature Head Flow >25 gpm.

indication and to eliminate thermal stratification in the bottom head.

E.1.2 At lDSOOl on RRFC Process CHECKS Accumulated Time for - - -

Overview Screen, CHECK Delta Temp Low for both RR Accumulated Time for Delta Pumps.

Temp Low

NRC-Simulator-0 1 Revision: 00 Page 8 of 13 STEP ELEMENT STANDARD E.1.3.1 Logs accumulated time for delta N/A temp low.

CUE Tell the examinee that another operator will make the Unit- 1 Log entry.

E.1.3.2 Notifies System Engineer of the N/A accumulated time.

I CUE Tell the examinee that another operator will notify the System Engineer. I E.2 VERIFY FCL is 566.7%, or value VERIFIES FCL is 166.7% by at - - -

determined by QNE. least one of the following:

o Power to Flow Map o OD-3 CUE If requested, then as the QNE state that they should use the FCL value given in the procedure.

  • E.3 CLOSE MG Set Motor Feed 0 PLACES handswitch for - - -

- and E.3.1 Breakers 1A and 1B. VERIFY LFMG output voltage increases to lA(1B) LFMG Set to CLOSE and VERIFIES breaker closes.

600 volts in <30 seconds.

o VERIFIES lA(1B) LFMG - - -

output voltage is 600 volts in less than 30 seconds.

  • 0 PLACES handswitch for - - -

lB(1A) LFMG Set to CLOSE and VERIFIES breaker closes.

o VERIFIES lB(1A) LFMG - - -

output voltage is 600 volts in less than 30 seconds.

NRC-Simulator-0 1 Revision: 00 Page 9 of 13 STEP ELEMENT STANDARD NOTE During the next step, the IB RR Pump will trip to OFF and 1A RR Pump will correctly downshift to Slow Speed.

NOTE Annunciator lH13-P603-A309, FW Control Rx Vessel Lvl7, may alarm when the RR pumps are downshifted. If so, give the CUE below, stating that another operator will respond to that annunciator.

  • E.4 TURN Motor Control Breaker 3 0 Simultaneously places both 1A Control Switches for both 1A and and 1B control switches for 1B RR Pumps to the breaker 3 to the TRANSFER-MG position, and TRANSFER-MG position.

observe normal slow speed running indication on both pumps.

CUE The Unit NSO will respond to annunciator 1H13-P603-A309.

0 OBSERVES Breaker 2B I - - -

FAILED to close and that 1B RR Pump trips to OFF.

o OBSERVES proper indications - __ -

that 1A RR Pump downshifted to Slow Speed.

NOTE LOP-RR-08, steps E.5 through E. 10.1 may be delayed until after actions of LOA-RR- 101 are completed.

NIA NOTIFIES the Unit Supervisor that Examinee notifies the Unit - - -

1B RR Pump has tripped to Zero Supervisor that the 1B RR pump speed (Off). has tripped to zero speed.

CUE As the Unit Supervisor, acknowledge the report and direct the examinee to take actions per the appropriate procedures and INFORM the Unit Supervisor after the 1B RR Pump breakers are in PTL per the procedure.

  • N/A Enters LOA-RR- 101 ExamineeOBTANScopyof - - -

LOA-RR- 10 I .

  • B.2.1 CHECK at least one Recirculation VERIFIES 1A RR Pump is - - -

Pump is operating. running.

3.2.2 PERFORM Subsection B. 1, Core DIRECTS the Unit NSO to - - -

Instabilities, while continuing PERFORM Subsection B. 1.

below.

CUE Inform the examinee that the Unit NSO will check for instabilities by performing Section B. 1 of LOA-RR-101 for the examinee.

NRC-Simulator-0 1 Revision: 00 Page 10 of 13 STEP ELEMENT STANDARD

  • B.2.3 VERIFY both RR Loop M/A 0 PLACES both RR Loop stations are in MANUAL. Controllers in MANUAL.

B.2.4 CHECK operating RR Pump in DETERMINES that 1A RR Pump HIGH SPEED. is NOT Running in HIGH SPEED.

  • B-2.4-1 OPEN FCV on LOW SPEED RR 0 DEPRESSES the INCREASE Pump. push button on the 1A Loop Controller until the FCV position indicates 100% open.

NOTE The actions described in the following step may be lumped together as one communication with the Unit Supervisor (US) with the expectation that the US makes the appropriate calls to the QNE and IMD.

B.2.5 INITIATE required actions of INFORMS the Unit Supervisor to Technical Specification 3.4.1 for reference TS 3.4.1 for Single Loop Single Loop Operation. Operations.

INFORMS the Qualified Nuclear

-1 Engineer (QNE).

NOTIFIES IMD to perform LIP-NR-5 19AA.3.

CUE As the Unit Supervisor, acknowledge the reference to Technical Specifications.

As the QNE, acknowledge the report from the operator.

As IMD, acknowledge the request to perform LIP-NR-5 19A/B.

B.2.6 NOTIFY IMD to perform Requests that IMD performs -

LIS-NR-107, Unit 1 APRM/RBM LIS-NR-107.

Flow Converter to Total Core Flow Adjustment.

CUE Acknowledge the examinees request to IMD and tell the examinee that the actions of LIS-NR- 107 will be completed in the required time.

  • B.2.7 DECREASE FCV position to DEPRESSES the LOWER -

minimum for tripped RR Pump. push button on the 1B Loop Controller until the FCV position indicates -20% open.

B.2.8 WHEN less than 350 rpm,PLACE PLACES lB, 2B, 3B and 4B RR -

v all breakers for tripped RR Pump Pump breakers in PTL.

in PTL.

NRC-Simulator-0 1 Revision: 00 Page I 1 of 13 STEP ELEMENT STANDARD N/A Informs the Unit Supervisor that Examinee tells the Unit Supervisor - __

1B RR Pump Breakers are in PTL. that 1B RR Pump Breakers are in PTL per LOA-RR- 10 1.

~

CUE As the Unit Supervisor, acknowledge the report and tell the examinee that this JPM is complete. Record completion time in the block below.

NRC-Simulator-0 1 Revision: 00 Page 12 of 13 b-Operators Name:

Job

Title:

ONLO 0RO SRO 0STA 0SRO Cert JPM

Title:

Downshift RR to Slow with One Pump Tripping to Off JPM Number: NRC-Simulator-01 Revision Number: 00 Task Number and

Title:

22.004 Given Unit Supervisor authorization, transfer Reactor Recirculation Pumps from Fast to Slow Speed, per station procedures.

WA Number and Importance:

202001 Recirculation System A3.08 Ability to monitor automatic operation of the RECIRCULATION SYSTEM including: Pump downshift 3.4/3.3 Suggested Testing Environment: Simulator Actual Testing Environment: IxI Simulator Control Room 0In-Plant Testing Method: c] Simulate Alternate Path: (XI Yes 0 No Perform SROOnly: 0 Yes ix1 No Timecritical: 0 Yes No W

Estimated Time to Complete: 30 minutes Actual Time Used: minutes

References:

LOP-RR-08, Changing Reactor Recirculation Pump Speed From Fast to Slow Speed, Revision 28 LOA-RR- 10I, Unit 1, Reactor Recirculation System Abnormal, Revision 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory c] Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC-Simulator-0 1 Revision: 00 Page 13 of 13

-- INITIAL CONDITIONS You are the Unit-1 Assist NSO:

0 A normal unit shutdown is in progress per LGP-2-1 0 LGP-2-1 is completed up to step E. 1.6.

0 1A and 1B LFMG pre-start checks have been completed satisfactorily.

0 Power has been reduced as low as possible in preparation for the downshift.

0 RR Hydraulic system is in operation per LOP-RR-03, Startup, Operation and Shutdown of Reactor Recirc Hydraulic Power Unit.

INITIATING CUE The Unit Supervisor has directed you to downshift the Reactor Recirculation (RR) pumps per LOP-RR-OS. Inform the Unit Supervisor when both RR pumps are downshifted.

Exelon Nuclear Job Performance Measure Initiate RCIC for Level Control per LOP-RI-02 with failure of 1E51-FO46 to Automat icalIy 0pen JPM Number: NRC-Simulator-02 Revision Number: 00 Date: 11/03/2004 Developed By:

Instructor Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date

NRC-Simulator-02 Revision: 00 Page 2 of 11 v

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (In-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date L.

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

10.If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/lnstructor Date SME/Instructor Date SME/lnstructor Date

NRC-Simulator-02 Revision: 00 Page 3 of 11

- Revision Record (Summary)

1. Revision 00: This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005.

NRC-Simulator-02 Revision: 00 Page4of11

.- SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 1 14 (Created by scramming from full-power; HPCS in PTL; FW secured; Level stabilized at approximately +12 inches).

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Load the Computer Aided Exercise Program from the JPM Floppy disk (NRC-Simulator-02.0.cae) or manually enter the following:

- set vmrj046r = le6

- trgset 25 klp26jnm .GE. 0.9

- trg 25 set vmrj046r = 20

- trgset 26 qlp26rrm .GE. 0.9

- imf 1-0551 (26 1:OO) 1

- trgset 27 klk29psm .GE. 1

- trg 27 dmf rO551

3. Silence, Acknowledge and Reset the annunciators. Then Acknowledge the Process Computer Alarms.
4. Clear BOTH Sequence of Events Recorder (SER) monitor screens.

u

5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.

6 . This completes the setup for this JPM.

NRC-Simulator-02 Revision: 00 Page 5 of 11 ASSOCIATED CAEPs

  1. Setup for NRC Simulator JPM Simulator-02
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-02.0.cae
  1. Revision: 00
  1. Revision Date: 10/23/2004
  1. Revised By: jer
  1. This is an Alternate Path JPM. The examinee will start RCIC for
  1. level control per LOP-RI-02. The RCIC Lube Oil Cooling Water Valve,
  1. lE51-FO46 will fail to automatically open. When the examinee
  1. manually opens lE51-FO46, the annunciator lH13-P601-D102, RCIC
  1. Barometric Vacuum Tank Pressure High, will alarm. The LOR will
  1. require shutting RCIC down per LOP-RI-03.
  1. Prevent opening lE51-FO46 RCIC Lube Oil Cooling Water Valve set vmrj046r = le6
  1. Automatic Event Trigger 25
  1. Allows manually opening lE51-FO46 trgset 25 "klp26jnm .GE. 0 . 9 "

trg 25 "set vmrj046r = 20"

'-r

  1. Automatic Event Trigger 26
  1. Inset r-point for Vacuum Tank High Pressure when lE51-FO46 is open trgset 26 "qlp26rrm .GE. 0 . 9 "

imf r0551 (26 1:OO) 1

  1. Automatic Event Trigger 27
  1. Deletes r-point malfunction allowing Vacuum Tank alarm to reset trgset 27 "klk29psm .GE. 1" trg 27 "dmf r0551"
  1. This ends this CAEP.

NRC-Simulator-02 Revision: 00 Page 6 of 11 v INITIAL CONDITIONS You are the Unit-1 NSO:

0 A transient and reactor scram has occurred Due to loss of other high-pressure injection sources, RCIC is needed for level control.

LOP-RI-05, Preparation for Standby Operation of RCIC is complete.

0 NO maintenance has been done on RCIC, NOR have the lube oil filters be changed.

INITIATING CUE The unit supervisor has directed you to initiate the RCIC system using the manual initiation pushbutton for level control per LOP-RI-02 step E. 1. Report to the Unit Supervisor when the RCIC flow has been verified per the procedure.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

0 Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 D 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 8 8 D 8 = 8 8 8 8 = 8 = = = = 8 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~

Y

rr__- __

NRC-Simulator-02 Revision. 00 Page 7 of 11

- JPM Start Time:

STEP ELEMENT STANDARD

  • N/A Obtains copy of LOP-RI-02. 0 Obtains copy of LOP-RI-02.

CUE After examinee demonstrates ability to obtain a current copy of the procedure, give him a copy of LOP-RI-02.

  • E.1.1 ARM and DEPRESS the RCIC 0 Arms and depresses the manual - - -

Manual Initiation Push-button. initiation pushbutton.

NOTE During the following step the examinee will discover that the 1E5 1-F046 (RCIC Lube Oil Clg Water Vlv) has failed to automatically open. He should place the handswitch in to OPEN and then continue verifying the other automatic functions.

One minute after 1E5 1-F046 is full open, annunciator 1H 13-P60 1-D 102, RCIC Barometric Condenser Vacuum Tank Pressure High annunciator will alarm. The examinee is expected to follow the actions of the V

annunciator. For JPM grading purposes the evaluator should jump ahead to step B.l (page 8 of this JPM) for the annunciator response and then return to where the examinee left off. Mark the remaining steps of LOP-RI-02 as N/A.

~

  • E.1.2 VERIFY automatic operation of o VERIFY lE51-CO05, the following equipment and Barometric Condenser Vacuum valves on panel 1H 13-P60 1. Pump STARTS.

o VERIFY lE51-FO45, RCIC Turbine Steam Inlet Valve OPENS o DETERMINES 1E5 1-F046, RCIC Lube Oil Cooling Water Valve is CLOSED.

Lube Oil Cooling Water Valve.

o VERIFY lE51-FO13, RCIC - - -

Pump Injection Valve OPENS.

.-- o VERIFY 1E5 1-F059, RCIC - - -

Pump Test to CY Downstream Valve CLOSES.

NRC-Simulator-02 Revision: 00 Page 8 of 11 STEP ELEMENT STANDARD o VERIFY I E5 I -F022, RCIC - - -

Pump Test to CY Upstream Valve CLOSES.

o VERIFY 1E5 1-F025, RCIC - - -

Steam Drain Pot Outlet Upstream Stop CLOSES.

o VERIFY 1E5 1-F026, RCIC - - -

Steam Drain Pot Outlet Downstream Stop CLOSES.

o VERIFY 1E51-FO04, - - -

Barometric Condenser Condensate Pump Upstream Stop CLOSES.

o VERIFY oneofthetwoRCIC - __ -

Suction Valves is open 1E51-FO31, or lE51-FO10.

o CHECK annunciators - - -

lH13-P601-D406 and D508 are alarming NOTE When 1H 13-P60 1-Dl02 alarms the examinee will take actions per the LOR procedure as indicated in the following steps.

B.1 VERIFY 1E51-F069, RCIC VERIFIES I E5 I -F069 is OPEN. - - -

Condenser Vacuum Pump Discharge Valve is OPEN and proper operation of I E5 1-C005, RCIC Condenser Vacuum Pump.

VERIFIES 1E5 I -COO5 is - - -

RUNNING.

NOTE The following step may have been completed by the examinee earlier. If so, then it is okay to mark this step completed satisfactorily based on your previous observation of the step.

. *B.2 VERIFY 1E51-FO46, RCIC Lube e Places handswitch for - - -

Oil Cooling Water Valve is OPEN. 1E5 1-F046 to OPEN

NRC-Simulator-02 Revision: 00 Page 9 of 11 Y

STEP ELEMENT STANDARD B.3 IF emergency condition requires 0 DISCUSS with the Unit - - -

continued operation of RCIC with Supervisor the continued a high vacuum tank pressure alarm, operation of RCIC.

RCIC can operate without barometric condenser.

CUE If asked, as the Unit Supervisor tell the examinee that an Emergency EXISTS and RCIC can continue to operate without the barometric condenser.

Termin Tell the student that this JPM is complete and enter the JPM Stop Time ation in the blank provided below.

NRC-Simulator-02 Revision: 00 Page 10 of 11 Operators Name:

v Job

Title:

ONLO RO 0SRO 0STA 0SRO Cert JPM

Title:

Initiate RCIC for Level Control per LOP-RI-02 with failure of 1E5 1 -F046 to Automatically Open JPM Number: NRC-Simulator-02 Revision Number: 00 Task Number and

Title:

2 17000 Lineup the reactor core isolation cooling (RCIC) system WA Number and Importance:

217000 2.1.29 Knowledge of how to conduct and verify valve lineups 3.4/3.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator 0Control Room 0In-Plant Testing Method: 0 Simulate Alternate Path: (XI Yes 0 No Perform SRO Only: 0 Yes El No Time Critical: 0 Yes IxI No

- Estimated Time to Complete:

References:

15 minutes Actual Time Used: minutes LOP-RI-02, Operation of the Reactor Core Isolation Cooling System for Level Control, Revision 30 LOR-1 H13-P601-D102, RCIC Bar0 Cndsr Vac Tank Press Hi, Revision 02 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC-Simulator-02 Revision: 00 Page 11 of 11 1 INITIAL CONDITIONS You are the Unit-1 NSO:

0 A transient and reactor scram has occurred 0 Due to loss of other high-pressure injection sources, RCIC is needed for leve, contra 0 LOP-RI-05, Preparation for Standby Operation of RCIC is complete.

0 NO maintenance has been done on RCIC, NOR have the lube oil filters be changed.

INITIATING CUE The unit supervisor has directed you to initiate the RCIC system using the manual initiation pushbutton for level control per LOP-RI-02 step E. 1. Report to the Unit Supervisor when the RCIC flow has been verified per the procedure.

Manually Operate SRVs and then Reset LLS as Directed JPM Number: NRC-Simulator-03 Revision Number: 00 Date: I1/04/2004 Date Date Review By:

Operations Representative Date

NRC-Simulator-03 Revision: 00 Page 2 of 10 v

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (In-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date b

-- 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/lnstructor Date SME/lnstructor Date SME/lnstructor Date

NRC-Simulator-03 Revision: 00 Page 3 of 10

- Revision Record (Summary)

1. Revision 00: This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005.

NRC-Simulator-03 Revision: 00 Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any full power IC (IC-1 30).

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. IF you want to run this JPM stand-alone, then use the following setup: Load the Computer Aided Exercise Program from the JPM Floppy disk (NRC-Simulator-04.0.cae) or manually enter the following:

- imf mcfT)90

- imf mnb104(5) 50

- trgset 10 (q3jO81wb .LT. 0.5) .AND. (q3jO91wb .LT. 0.5)

- trg I 0 dmf mnb104

- trgset 11 (q3j081wb .LT. 0.5) .AND. (q3j091wb .LT. 0.5)

- ior k4k06pty( 1 1) pushed

- ior k4j04pty(ll) pushed

- ior k4h07jcy(ll) close

- ior k4h04jcy( 1 1) close

- ior klk29psm( 1 1) pushed

- ior k3g09wl7( 11) shutdown

- ior kl k03jcl( 1 1) close

- 3. Place the simulator in RUN and then activate Event Trigger 5 to put in small steam leak. VERIFY that Automatic Event Triggers 10 and 11 go true when the reactor scrams, then take scram actions per the scram hardcard. (The idea here is ro have pressure high in rhe RPV and high in the Drywell and have low RPV level.)

4. Silence, Acknowledge and Reset the annunciators. Then Acknowledge the Process Computer Alarms.
5. Clear BOTH Sequence of Events Recorder (SER) monitor screens.
6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

NRC-Simulator-03 Revision: 00 Page 5 of 10 Y

ASSOCIATED CAEPs

  1. Setup for NRC Simulator JPM Simulator-03
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-03.0.cae
  1. Revision: 00
  1. Revision Date: 10/23/2004
  1. Revised By: jer
  1. This is a normal (non-alternate path) JPM. The examinee will be
  1. directed to open SRVs to reduce RPV pressure to 800 psig. When
  1. pressure is approximately 800 psig and the SRV have been returned to
  1. AUTO, the examinee will be directed to reset the LLS logic.
  1. Prevent operation of MDRFP (locked rotor) imf mcf 090
  1. Insert at small steam leak to get High DW Pressure initiations and
  1. RPS Scram.

imf mnbl04 50

  1. Automatic Event Trigger 10
  1. Delete steam leak after the scram (group scram lights are o u t )

trgset 10 "(q3j081wb .LT. 0.5) .AND. (q3j091wb . L T . 0.5)"

trg 10 "dmf mnbl04"

  1. Automatic Event Trigger 11
  1. Trip TDRFPs and close discharge valves, trip the RCIC turbine, and
  1. place the mode switch in SHUTDOWN to keep RPV level low and RPV
  1. pressure high following the scram. Also close the HPCS injection
  1. to keep RPV level low.

trgset 11 "(q3j081wb .LT. 0.5) .AND. (q3j091wb . L T . 0 . 5 ) "

ior k4k06pty(ll) pushed ior k4j04pty(ll) pushed ior k4h07jcy ( 11 1 close ior k4h04 jcy (11) close ior klk29psm(ll) pushed ior k3g09w17 (11) shutdown ior kl k03jc l ( 1 1 ) close

  1. This ends this CAEP.

NRC-Simulator-03 Revision: 00 Page 6 of 10 Y

INITIAL CONDITIONS You are an Extra NSO on Unit-1 :

0 The LGAs have been entered on Unit- 1.

INITIATING CUE Per LGA-001, the Unit Supervisor has directed you to lower Unit-1 RPV pressure to 800 psig using TWO SRVs.

Inform the Unit Supervisor when pressure is 800 psig.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

88888888888888888888....................88888888888888888-8888888888888m8888888888888 Information For Evaluators Use:

UNSAT requires written comments on respective step.

-

  • Denotes critical steps.

0 Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 - 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

NRC-Simulator-03 Revision: 00 Page 7 of 10 W

JPM Start Time:

Y STEP ELEMENT STANDARD NOTE The Low-Low-Setpoint (LLS) logic automatically initiates when two SRVs are full-open at the same time. The control room hand switches operate SRV solenoids in Division 1 and therefore Division 1 LLS logic will actuate. This can be confirmed by annunciator window lH13-P601-F106 alarming.

NOTE The Examinee should observe administrative controls associated with manually operating SRVs while performing steps of this JPM, specifically, do NOT simultaneously place both SRV handswitches in OPEN. The first SRV should be verified open prior to placing the second handswitch in OPEN.

~

to OPEN and VERIFIES v

OPEN indication.

  • 2. OPEN second Safety Relief 0 Waits for open indication on - - -

Valves. first SRV then, takes handswitch for a second SRV to OPEN and VERIFIES OPEN indication.

1 NOTE The following steps (steps 3,4, 5, and 6 ) can be performed in any order. I

3. OBSERVES RPV Pressure o MONITORSanyWideRange __ - __

decrease to 800 psig. Pressure indication and OBSERVES RPV pressure decreasing.

handswitches to AUTO when approximately 800 psig, desired pressure is reached. PLACES handswitches for both SRVs opened above to AUTO and VERIFIES CLOSED indication.

NRC-Simulator-03 Revision: 00 Page 8 of 10 STEP ELEMENT STANDARD

5. REVIEWS annunciator procedure DETERMINES annunciator - - -

LOR-1 H 13-P601-F 106. LOR- 1H 13-P601-F 106 is expected for initiating LLS.

CUE When informed of LLS Initiation, then as the Unit Supervisor acknowledge the LLS report.

6. REVIEWS other annunciator DETERMINES that these - - -

procedures associated with opening annunciators are expected when SRVs. manually opening SRVs.

CUE When informed of the status of other SRV related annunciators, then as the Unit Supervisor, acknowledge the report.

i

~~

After the examinee has responded to the annunciators, then DIRECT the examinee to RESET Low-Low-Set and report to the Unit Supervisor u when the LLS logic has been VERIFIED RESET.

~~

  • 7. RESETS Division 1 LLS Logic. 0 DEPRESSES the Division I - - -

LLS Reset Pushbutton.

NOTE Examinee may also depress the Division 2 LLS Reset Pushbutton. This is not required, and it does VERIFY that both divisions of LLS are reset.

Division 1 LLS resets. window lH13-P601-F106 resets.

9. Reports to the Unit Supervisor. Tell the Unit Supervisor that the - - -

Low-Low-Setpoint logic has been reset.

Acknowledge report as Unit Supervisor and tell the student that this JPM is complete. Record completion time in the block below.

JPM Stop Time:

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 m 8 8 8 8 8 m 8 m 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 m 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

NRC-Simulator-03 Revision: 00 Page 9 of 10 Operators Name:

v Job

Title:

ONLO 0RO 0SRO 0STA 0SRO Cert JPM

Title:

Manually Operate SRVs and then Reset LLS as Directed JPM Number: NRC-Simulator-03 Revision Number: 00 Task Number and

Title:

41 0.000 Given entry in LGA-00 1, RPV Control, with the main turbine bypass valves unavailable, stabilize RPV pressure per station procedures.

WA Number and Importance:

239002 ReliefBafety Valves A4.01 Ability to manually operate andor monitor in the control room:

SRVs 4.414.4 Suggested Testing Environment: Simulator Actual Testing Environment: IxI Simulator Control Room 0In-Plant Testing Method: 0 Simulate Alternate Path: 0 Yes IXI No Perform SROOnly: 0 Yes 3 No

- Time Critical: 0 Yes Estimated Time to Complete:

IxI No minutes Actual Time Used: minutes

References:

LGA-001 ,RPV Control (Pressure Control Leg), Revision 06 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC-Simulator-03 Revision: 00 Page 10 of 10 v INITIAL CONDITIONS You are an Extra NSO on Unit-1 :

0 The LGAs have been entered on Unit-1 .

INITIATING CUE Per LGA-001, the Unit Supervisor has directed you to lower Unit-1 RPV pressure to 800 psig using TWO SRVs.

Inform the Unit Supervisor when pressure is 800 psig.

Exelon Nuclear Job Performance Measure Synchronize and Load the Main Generator JPM Number: NRC-Simulator-04 Revision Number: 00 Date: 01/20/2005 Developed By:

Instructor Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date

NRC-Simulator-04 Revision: 00 Page 2 of 13 W

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (In-plant, control room, or simuIato r)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

- Procedure Rev.

9. Pilot test the JPM:

Date

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SMEA nstructor Date SMEAnstructor Date SME/Instructor Date

NRC-Simulator-04 Revision: 00 Page 3 of 13

--- Revision Record (Summary)

1. Revision 00: This JPM was written by J.E. Ross for the 2003-0 1 ILT NRC Exam given on the week of 03/07/2005.

NRC-Simulator-04 Revision: 00 Page 4 of 13 Y SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the main turbine At Set Speed and ready to close the exciter breaker field breaker (IC-020)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Place the simulator in RUN.
3. Silence, Acknowledge and Reset the annunciators.
4. VERIFY the following:

- Process Computer Alarms are ACKNOWLEDGED

- Exciter Field Breaker is GREEN Flagged

- Generator Voltage Regulator is in MANUAL (GREEN Flagged)

- Main Turbine Bypass Valve #2 indication is not fluctuating [g5fo2g16 -6O(-40 in expert)]

- Override the PMG Malfunction indications (imf 1-0799off, ior q5ksw6 off, ior q5k36sw6 off)

5. Clear BOTH Sequence of Events Recorder (SER) monitor screens.

6 . When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.

21

7. This completes the setup for this JPM.

4

NRC-Simulator-04 Revision: 00 Page 5 of 13 u

ASSOCIATED CAEPs NONE

NRC-Simulator-04 Revision: 00 Page 6 of 13

- INITIAL CONDITIONS You are the Unit-1 NSO:

0 Unit-1 is starting up after an extended outage.

0 The Main Turbine is At Set Speed (-1 800 rpm).

0 LOP-TG-02 is complete up to step E.24 on page 18 0 An operator is standing by to assist you.

INITIATING CUE The Unit Supervisor has directed you to continue with LOP-TG-02 starting at step E.24.

Inform the Unit Supervisor when ready to place the Generator Voltage Control in AUTOMATIC.

Fill in the JPM Start Time and provide a marked up copy of LOP-TG-02 to the Examinee when the examinee acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

0 Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

8 8 8 8 8 8 . 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 . 8 D 8 8 8 8 8

  • 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 8 8 8 8 1

NRC-Simulator-04 Revision: 00 Page 7 of 13 c JPM Start Time:

STEP ELEMENT STANDARD

~~ ~ ~ ~

NOTE All steps of this JPM are to be completed at control room panels lPMOl J and 1PM02J unless otherwise stated.

E.24 VERIFY the following:

Generator Field Volts Adjust at VERIFIES LOWER LIMIT light is minimum position. ON.

Generator Regulator Mode VERIFIES GENERATOR Transfer in MANUAL. REGULATOR MODE TRANSFER is in MANUAL.

Generator Voltmeter Selector is VERIFIES GENERATOR NOT OFF. VOLTMETER SELECTOR is in A-B, B-C, or C-A (not in OFF).

E.26 and Per the CAUTION before Step REVIEWS the IF/THEN E.27 E.25, REVIEWS Steps E.26 and statements for possible E.27. malfunctions of the voltage regulator prior to closing the Field Breaker.

  • E.25 CLOSE Generator Field Breaker CLOSES the GENERATOR and OBSERVE the following: FIELD BREAKER Generator Field Volts indication OBSERVES rising indication on rises meter 1E 1-MP002 U 1 GENERATOR FIELD VOLTS.

Generator Kilovolts indication OBSERVES rising indication on rises meter 1El -MP02 1 U 1 GENERATOR KILOVOLTS.

E.26 and IF Generator Kilovolts rises to Determines that Generator Voltage E.27 26 KV OR has NOT risen after ten rises satisfactorily.

  • seconds, then take corrective actions.

NRC-Simulator-04 Revision: 00 Page 8 of 13 5-c STEP ELEMENT STANDARD E.28 VERIFY Generator Kilovolts OBSERVES 18 KV to 22 KV indicates 18 KV to 22 KV. indication on meter 1E 1-MP02 1 .

E.29 With Voltage regulator out of DETERMINES this step is NOT service, REFER to Figure 2 for applicable.

safe operation.

  • E.30 Raise Generator Kilovolts to 23.5 0 Uses GENERATOR FIELD KV to 24.0 KV. VOLTS ADJUST switch to RAISE voltage to between 23.5 KV and 24.0 KV as indicated on meter 1E 1-MP02 1.

E.3 1 Check all three phases of generator ROTATES GENERATOR voltage approximately 23.7 KV VOLTMETER SELECTOR through positions A-B, B-C, and C-A and OBSERVES voltage approximately 23.7 KV and v

approximately equal between phases.

E.32 Notify Electric Operations Power Either informs the Unit Supervisor Operations that U1 Main Generator to make the notification or states is ready to synchronize to the grid. his intention to INFORM Power Operations that Unit-1 Generator is ready to synchronize to the grid.

CUE As the Unit Supervisor acknowledge that the Unit- 1 Generator is ready to synchronize to the grid.

E.33 At Panel OPMl1J:

Verify OCB 9-10 Auto Recloser VERIFIES OCB 9-10 Auto Cutout is OFF Recloser Cutout switch is in OFF.

Verify OCB 10-11 Auto Recloser VERIFIES OCB 10-1 1 Auto Cutout is OFF Recloser Cutout switch is in OFF.

Verify 345 KV Bus Tie 9-10 OCB VERIFIES OCB 9- 10 control is NOT in Pull-To-Lock. switch is NOT in PTL.

Verify 345 KV Bus Tie 10-1 1 VERIFIES OCB 10-1 1 control OCB is NOT in Pull-To-Lock. switch is NOT in PTL.

NRC-Simulator-04 Revision: 00 Page 9 of 13 Y

STEP ELEMENT STANDARD E.34 Verify the following control switches are NOT in Pull-To-Lock:

Bus Tie 9- 10 OCB At lPMOlJ, VERIFIES OCB 9-10 __ __ __

control switch is NOT in PTL.

Bus Tie 10-11 OCB At 1PMO 1J, VERIFIES OCB 10- - - -

11 control switch is NOT in PTL.

  • E35 Places one of the following in ON: 0 PLACES the Synchroscope - - -

- OCB 9- 10 Synchroscope switch for OCB 9-10 (10-1 1) to

- OCB 10-1 1 Synchroscope ON.

  • E.% Adjust Generator speed so 0 ADJUSTS LOAD SET - - -

generator output frequency is pushbuttons until slightly higher than grid frequency. GENERATOR SYNCHROSCOPE is rotating slowly in the FAST direction.

u E.37 Adjust Generator output voltage ADJUSTS GENERATOR FIELD __ __ -

slightly higher than grid voltage. VOLTS ADJUST switch until INCOMING VOLTS is slightly higher than RUNNING VOLTS.

E.38 VERIFY the following:

Generator Synchroscope rotating VERIFIES GENERATOR - - -

slowly in the Fast direction. SYNCHROSCOPE is rotating slowly in the fast direction (may make adjustments).

Generator Incoming Volts reading VERIFIES GENERATOR - - -

slightly higher than Generator INCOMING VOLTS meter is Running Volts. reading slightly higher than GENERATOR RUNNING VOLTS meter (may make adjustments).

NRC-Simulator-04 Revision: 00 Page 10 of 13 Y c, STEP ELEMENT STANDARD

  • E.39.1 Parallel and close generator OCB 0 Just prior to GENERATOR 9-lO(10-11). SYNCHROSCOPE reaching the 12 oclock position take the handswitch for the selected OCB to CLOSE and CHECK OCB closes.
  • E.39.2 Immediately apply load to the 0 Immediately DEPRESS and Generator by closing the Bypass HOLD the LOAD SET Valves. INCREASE button until all Turbine Bypass Valves are CLOSED.

E.40 Turn the selected synchroscope PLACES the Synchroscope switch OFF. of OCB 9-10 (10-1 1) to OFF.

  • E.41 Places the synchroscope for the 0 PLACES the Synchroscope L

second OCB to ON. switch for OCB 10-1 I (9-10) to ON.

E.42 CHECK the following:

Generator Synchroscope meter at CHECKS GENERATOR the 12 oclock position. SYNCHROSCOPE is pointing at the 12 oclock position.

Generator Incoming Volts and CHECKS GENERATOR Generator Running Volts are INCOMING VOLTS meter and approximately equal. GENERATOR RUNNING VOLTS meter are reading approximately equal.

E.43 If desired, INSTALL a jumper per DETERMINES that HACR relay to bypass the HACR relay. does NOT need bypassed (asks Unit Supervisor).

CUE If asked, respond as the Unit Supervisor that it is NOT desirable to bypass the HACR relay and direct the examinee to continue with the procedure.

NRC-Simulator-04 Revision: 00 Page 11 of 13

-STEP ELEMENT STANDARD

  • E.44 Close the second OCB. 0 Place the OCB 10-11 (9-10) - - -

handswitch to CLOSE and VERIFY OCB 10-1 1 (9-10) closes.

E.45 Turn the selected synchroscope PLACES the Synchroscope switch - - __

OFF. of OCB 9-10 (10-1 1) to OFF.

NIA Reports to the Unit Supervisor. Tells the Unit Supervisor that the - - __

Generator is Loaded and ready for placing generator voltage control in automatic.

1 CUE As the Unit Supervisor, acknowledge the report. I Termina Tell the student that this JPM is complete and enter the JPM Stop Time in the blank provided below.

u JPM Stop Time:

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 R 8 8 8 8 8 8 8 R 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~

NRC-Simulator-04 Revision: 00 Page 12 of 13 Operators Name:

Job

Title:

ONLO 0RO 0SRO 0STA SRO Cert JPM

Title:

Synchronize and Load the Main Generator JPM Number: NRC-Simulator-04 Revision Number: 00 Task Number and

Title:

71.010 Given Unit Supervisor authorization, perform actions for Main Turbine startup and synchronization, per station procedures.

WA Number and Importance:

245000 Main Turbine Generator and Controls, A4.02 Ability to manually operate and/or monitor in the control room: Generator controls 3.1/2.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator 0Control Room [7 In-Plant Testing Method: 0 Simulate Alternate Path: 0 Yes Ix] Perform SRO Only: 0 Yes Time Critical: [7 Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

LOP-TG-02, Turbine Generator Startup, Revision 47 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC-Simulator-04 Revision: 00 Page 13 of 13 Y INITIAL CONDITIONS You are the Unit-1 NSO:

0 Unit-1 is starting up after an extended outage.

The Main Turbine is At Set Speed (-1800 rpm).

LOP-TG-02 is complete up to step E.24 on page 18 0 An operator is standing by to assist you.

INITIATING CUE The Unit Supervisor has directed you to continue with LOP-TG-02 starting at step E.24.

Inform the Unit Supervisor when ready to place the Generator Voltage Control in AUTOMATIC.

Exelon Nuclear Job Performance Measure Initiate Drywell Spray with Failure of Second Valve to Open J PM Number: NRC-Simulator-05 Revision Number: 00 Date: 11/04/2004 Developed By:

Instructor Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date

NRC-Simulator-05 Revision: 00 Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (In-plant, control room, or s imulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/lnstructor Date SMEA nstructor Date S ME/Inst ructor Date

NRC-Simulator-05 Revision: 00 Page 3 of 12

- Revision Record (Summary)

1. Revision 00: This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005.

NRC-Simulator-05 Revision: 00 Page 4 of 12 b SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with power available to 1A and 1B RHR loops.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Scram the reactor and complete the first 6 steps on the Scram Hardcard.
3. PLACE all RR pump breakers in PTL.
4. Start 1A and 1B RHR loops in Suppression Pool Cooling with 1E 12-F024A and B adjusted to obtain 6400 gpm system flow.

5 . Open 1E12-F027B, 1B RHR Suppression Pool Spray Valve.

6. Start Division 1 and 2 RHR Service Water.
7. Load the Computer Aided Exercise Program from the JPM Floppy disk (NRC-Simulator-05.O.cae).

This JPM is best setup using the CAEPs and NOT manually entering expert commands.

8. Silence, Acknowledge and Reset the annunciators. Then Acknowledge the Process Computer Alarms.

u

9. Clear BOTH Sequence of Events Recorder (SER) monitor screens.
10. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.

1 1. This completes the setup for this JPM.

NRC-Simulator-05 Revision: 00 Page 5 of 12 ASSOCIATED CAEPs

  1. Setup for NRC Simulator JPM Simulator-OS
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-05.0.cae
  1. Revision: 00
  1. Revision Date: 10/23/2004
  1. Revised By: jer
  1. This is an Alternate Path JPM. The examinee will attempt to put on
  1. the 1A Loop of DW Sprays, the first valve will open but the second
  1. will not move and trips its breaker. The 1B Loop will work, however
  1. 1B RHR is being used for SC Sprays which will have to be aligned to
  1. the 1A l o o p .
  1. Automatic Event Trigger 1
  1. True if lE12-FO16B is OPENED first trgset 1 "klk09jnn .GE. 0.9" cae A:NRC-Simulator-05.1.cae /trig 1
  1. Automatic Event Trigger 2
  1. True if lE12-FO17B is OPENED first trgset 2 "kljlOjnn .GE. 0.9" u.

cae A:NRC-Simulator-05.2.cae /trig 2

  1. Automatic Event Trigger 3
  1. True if 1E12-FO16A is OPENED first trgset 3 "klkl7jnn .GE. 0.9" cae A:NRC-Simulator-05.3.cae /trig 3
  1. Automatic Event Trigger 4
  1. True if lE12-FO17A is opened first trgset 4 "kljl8jnn .GE. 0.9" cae A:NRC-Simulator-05.4.cae /trig 4
  1. This the end of this CAEP.
  1. Supports NRC Simulator JPM Simulator-05
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-05.1.cae
  1. Revision: 00
  1. Revision Date: 10/23/2004
  1. Revised By: jer L
  1. Automatic Event Trigger 5
  1. Simulate lE12-FO17B breaker tripping when h/s is taken ta open trgset 5 "kljl3jnn .GE. 0.9"

NRC-Simulator-05 Revision: 00 Page 6 of 12 irf iarh17b(5) local b.

  1. Remove all other Automatic Event Triggers to allow normal operation
  1. of the other valves.

trgset 2 '"'

trgset 3 I"'

trgset 4 "*'

  1. This the end of this CAEP.
  1. Supports NRC Simulator JPM Simulator-05
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-05.2.cae
  1. Revision: 0 0
  1. Revision Date: 10/23/2004
  1. Revised B y : jer
  1. Automatic Event Trigger 5
  1. Simulate lE12-FO16B breaker tripping when h/s is taken to open trgset 5 "klk09jnn .GE. 0.9" irf iarhl6b (5) local w
  1. Remove all other Automatic Event Triggers to allow normal operation
  1. of the other valves.

trgset 1 "I' trgset 3 II" trgset 4 I"'

  1. This the end of this CAEP.
  1. Supports NRC Simulator JPM Simulator-05
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-05.3.cae
  1. Revision: 0 0
  1. Revision Date: 10/23/2004
  1. Revised B y : jer
  1. Automatic Event Trigger 5
  1. Simulate lE12-FO17A breaker tripping when h/s is taken to open trgset 5 "kljl8jnn .GE. 0 . 9 "

irf iarh17a(5) local u # Remove all other Automatic Event Triggers to allow normal operation

  1. of the other valves.

trgset 1 "I'

NRC-Simulator-05 Revision: 00 Page 7 of 12 trgset 2 I"'

-.- trgset 4 I"'

  1. This the end of this CAEP.
  1. Supports NRC Simulator JPM Simulator-05
  1. Author: J.E. Ross
  1. Date Written: October 23, 2 0 0 4
  1. Filename: A:NRC-Simulator-05.4.cae
  1. Revision: 0 0
  1. Revision Date: 10/23/2004
  1. Revised By: jer
  1. Automatic Event Trigger 5
  1. Simulate lE12-FO16A breaker tripping when h/s is taken to open trgset 5 "klkl7jnn .GE: 0.9" irf iarhl6a (5) local
  1. Remove all other Automatic Event Triggers to allow normal operation
  1. of the other valves.

trgset 1 I"'

trgset 2 'I" trgset 3 "I'

  1. This the end of this CAEP.

NRC-Simulator-05 Revision: 00 Page 8 of 12 L. INITIAL CONDITIONS You are the Unit-1 NSO:

0 LOCA conditions exist in the containment 0 Both loops of RHR Suppression Pool Cooling are in operation 0 1B RHR is being used to Spray the Suppression Chamber 0 Both RR Pumps are in Pull-To-Lock (PTL)

INITIATING CUE The Unit Supervisor has verified containment parameters are within the limits of the Drywell Spray Initiation Limit (DSL) curve and directed you to start one loop of Drywell Spray. Hardcard use is authorized. Report to the Unit Supervisor when Drywell Spray has been initiated.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

- 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 D 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

0 Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

NRC-Simulator-05 Revision: 00 Page 9 of 12

.- JPM Start Time:

STEP ELEMENT STANDARD NOTE For this JPM the second Drywell Spray Valve will fail to open regardless of which loop the examinee attempts to place in Drywell Spray. The following summarizes the expected examinee actions:

0 Secure Suppression Pool Cooling on one loop 0 Attempt to establish Drywell Spray on the loop NOT in Suppression Pool Cooling (second valve fails) 0 Secure Suppression Pool Cooling on the opposite loop 0 Verify parameters still within the limits of the DSL I

0 Establish Drywell Spray on the second loop u

1.a. VERIFY 1A/lB RHR Pump is VERIFIES that 1A( 1B) RHR pump running. is running.

  • 2.a. THROTTLE 1E 12-F024A/B THROTTLES lE12-F024A(B)

CLOSED CLOSED.

3.a. OPEN the following valves:

3.a IElZ-FOl6NB OR (17AB) o OPENS First Valve Drywell Spray Valve (F016 or 17).

  • 3.a 1E 12-FO17- OR (16-) 0 Attempt to OPEN second Drywell Spray Valve (F017 or FO 16) and RECOGNIZES failure of second valve to open.

CUE If examinee reports failure of Drywell Spray Valve to the Unit Supervisor, then acknowledge the report.

If the examinee asks for directions, then repeat the initiating cue, You have been directed to start one loop of Drywell Spray. Hardcard use is authorized.

NRC-Simulator-05 Revision: 00 Page 10 of 12 W

STEP ELEMENT STANDARD CUE If the examinee asks, then as the Unit Supervisor report that containment parameters are still within the limits of the DSL.

1.b. VERIFY lB/lA RHR Pump is VERIFIES that lB( 1A) RHR pump __ __ -

running. is running.

"2.b. THROTTLE 1 E 12-FO24BlA THROTTLES lE12-F024B(A) __ - -

CLOSED CLOSED.

3.b. OPEN the following valves:

  • 3-b. 1E 12-F016B/A OR (17B/A) 0 OPENS First Valve Drywell - - -

Spray Valve (F016 or 17).

  • 3.b. 1El 2-FO 17B/A OR ( 16B/A) 0 OPENS SecondDrywell Spray __ - __

Valve (F017or F016).

NIA Reports to the Unit Supervisor. Tells the Unit Supervisor that one __ ~ __

loop of Drywell Spray has been established.

CUE Acknowledge report as Unit Supervisor and tell the student that this JPM is complete. Record completion time in the block below.

NRC-Simulator-05 Revision: 00 Page 11 of 12

- Operators Name:

Job

Title:

0NLO 0RO 0SRO 0STA 0SRO Cert JPM

Title:

Initiate Drywell Spray with Failure of Second Valve to Open JPM Number: NRC-Simulator-05 Revision Number: 00 Task Number and

Title:

420.000 Given LGA-003, Primary Containment Control in progress, evaluate plant conditions and control and maintain Drywell Temperature less than 340°F per station procedures.

WA Number and Importance:

226001 RHWLPCI: Containment Spray System Mode A4.03 Ability to manually operate andor monitor in the control room: Spray valves 3.Y3.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator 0 Control Room 0 In-Plant Testing Method: Simuiate Alternate Path: IxI Yes 0 No IxI Perform SRO Only: 0 Yes IXI No

-- Time Critical: 0 Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

LGA-003, Containment Control, Revision 05 LGA-RH- 103, A/B RHR Operations in the LGASLSAMGS (hard card), Revision 07 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:

Evaluators Name: (Print)

-. Evaluators Signature: Date:

NRC-Simulator-05 Revision: 00 Page 12 of 12 Y

INITIAL CONDITIONS You are the Unit-1 NSO:

0 LOCA conditions exist in the containment 0 Both loops of RHR Suppression Pool Cooling are in operation 0 1B RHR is being used to Spray the Suppression Chamber 0 Both RR Pumps are in Pull-To-Lock (PTL)

INITIATING CUE The Unit Supervisor has verified containment parameters are within the limits of the Drywell Spray Initiation Limit (DSL) curve and directed you to start one loop of Drywell Spray. Hardcard use is authorized. Report to the Unit Supervisor when Drywell Spray has been initiated.

Exelon Nuclear Job Performance Measure Perform LOS-DG-M3 with a Loss of the SAT JPM Number: NRC-Simulator-06 Revision Number: 00 Date: 11/05/2004 Developed By:

Instructor Date Validated By: ~ ~ ~~~~ -

SME or Instructor Date Review By:

Operations Representative Date

NRC- Simulator-06 Revision: 00 Page 2 of 12 W

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (In-plant, control room, or simuIator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

NRC-Simulator-06 Revision: 00 Page 3 of 12

- Revision Record (Summary)

1. Revision 00: This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005. It was modeled after JPM B.l .a from the 2002-01 ILT NRC Exam.

NRC-Simulator-06 Revision: 00 Page 4 of 12

- SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to the current Full Power IC (IC-130)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Put the Simulator in RUN.
3. PLACE the Division 3 Voltmeter in the Diesel Generator Position (if this isn't done the examinee may think that the Generator field failed to flash).
4. START the 1B DG with the Diesel Generator Control Switch on the 1H 13-P601 Panel.
5. VERIFY Speed Droop set to 50.
6. Load the Computer Aided Exercise Program from the JPM Floppy disk (NRC-Simulator-06.0.cae) or manually enter the following:

- irf iaeedr 1bdg 0

- trgset 20 "gl hOOgl8 .GE. 0.600"

- imf mee04 l(20)

- trgset 21 "Qlm001r8 .GE. 0.9"

- trg 2 1 k r f iaeedr 1b 1'I v

7. Silence, Acknowledge, Reset the annunciators and, ACKNOWLEDGE the Process Computer Alarms.
8. Clear BOTH Sequence of Events Recorder (SER) monitor screens.
9. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
10. This completes the setup for this JPM.

NRC-Simulator-06 Revision: 00 Page 5 of 12 ASSOCIATED CAEPs

  1. Setup for NRC Simulator JPM Simulator-06
  1. Author: J.E. Ross
  1. Date Written: November 11, 2004
  1. Filename: A:NRC-Simulator-06.0.cae
  1. Revision: 00
  1. Revision Date: 11/11/2004
  1. Revised By: jer
  1. This is an Alternate Path JPM. The examinee will parallel the 1B
  1. Diesel Generator to the SAT and then load the DG per LOS-DG-M3. When
  1. the Generator is almost fully loaded, the SAT will trip. The Examinee
  1. will direct the NLO to place the speed droop to zero and then adjust
  1. Voltage and Frequency per the limitations in LOS-DG-M3.
  1. Initial setup
  1. Place 1B DG Speed droop t.o 50 irf iaeedrlbdg 0
  1. Automatic Event Trigger 2 0
  1. True when 1B DG KW Load indicates 2,300 KW, trips the SAT trgset 20 "glhOOg18 .GE. 0.600" imf mee041 (20)
  1. Automatic Event Trigger 21
  1. True when SAT Feed to 143 Breaker is open, returns speed droop to zero trgset 21 "Qlm001r8 .GE. 0 . 9 "

trg 21 "mrf iaeedrlb 1"

  1. This ends this CAEP.

4

NRC-Simulator-06 Revision: 00 Page 6 of 12 W INITIAL CONDITIONS You are the Unit-I NSO:

LOS-DG-M3 was started last shift.

INITIATING CUE The Unit Supervisor has directed you to complete LOS-DG-M3 starting at Step 3.2 of Attachment 1B-Idle.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

W 0 Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 ~

NRC-Simulator-06 Revision: 00 Page 7 of 12

.- JPM Start Time:

STEP ELEMENT STANDARD 3.2 VERIFY 1B Diesel Generator RAISE or LOWER 1B DG Frequency at 59.8 to 60.2 Hz on Governor Adjust as necessary to indicator 1E22-R612. VERIFY frequency between 59.8 and 60.2 Hz.

3.3 If desired, WIPE Motor Operated Potentiometer, using the 1B Diesel Gen Volt Reg control switch to do the following as read on 1E22-R610:

CUE If asked, as the Unit Supervisor, tell the examinee to WIPE the potentiometer.

- 3.3.1 LOWER Diesel Generator volts to approximately 3900 volts.

Adjusts 1B DG Voltage by lowering to -3900 volts.

3.3.2 RAISE Diesel Generator volts to Adjusts 1B DG Voltage by raising __ - -

approximately 4500 volts. to -4500 volts.

3.3.3 LOWER Diesel Generator volts to Adjusts 1B DG Voltage until - - -

4050 to 4300 volts. between 4050 and 4300 volts.

3.3.4 If desired, REPEAT Steps 3.3.1 through 3.3.3 as needed CUE If asked, as the Unit Supervisor, tell the examinee that additional wiping of the potentiometer in NOT necessary.

  • 3.4 PLACE 1B DG/143 Synchronizing 0 Places Synch Switch for 1B - - -

Switch to ON. DG output breaker, 1433 to ON.

  • 3.5 ADJUST DG Speed with 1B Adjusts 1B DG frequency until __ - __

Diesel Gen Governor switch until Synch Scope is rotating 1 to 2 synchroscope rotates at a beat rpm in the FAST direction.

L' frequency of 30-60 seconds ( 1 -2 rpm) in the FAST (clockwise) direction.

NRC-Simulator-06 Revision: 00 Page 8 of 12 STEP ELEMENT STANDARD

  • 3.6 ADJUST Division 3 Incoming 0 Adjusts Incoming Volts until __ __ -

Volts with 1 B Diesel Gen Volt Reg slightly greater than Running control switch until it is slightly Volts.

above BOP/Division 3 Running Volts.

  • 3.7 When synchroscope is at the 0 Places handswitchtocloseand - __ -

1 1 oclock position, CLOSE ACB HOLDS until breaker indicates 1433,lB DG Feed to Bus 143 by closed, when Synch Scope HOLDING the Control Switch in rotates over 11 oclock CLOSE. position.

3.8 Using 1B Diesel Gen Governor switch to control KW and 1B Diesel Gen Volt Reg control switch to control KVAR, SLOW LOAD DG as follows:

W

  • 3.8.1 RAISE DG Load to 1000 KW to 0 Adjusts KW to between 1000 __ __ __

1300 KW and 350 KVAR to 750 KW and 1300 KW.

W A R , MAINTAIN for two minutes.

0 AdjustsKVARto between350 __ - -

KVAR and 750 KVAR.

o Waits two minutes before - - -

proceeding.

CUE When apparent that examinee is waiting for two minutes, okay to tell examinee that two minutes have elapsed.

NRC-Simulator-06 Revision: 00 Page 9 of 12 STEP ELEMENT STANDARD

  • 3.8.2 RAISE DG Load to 1750 KW to 0 Adjusts KW to between 1750 - __ -

2000 KW and 500 KVAR to 1300 KW and 2000 KW.

KVAR, MAINTAIN for two minutes.

0 Adjusts KVAR to between 500 KVAR and 1300 KVAR.

o Waits two minutes before proceeding.

CUE When apparent that examinee is waiting for two minutes, okay to tell examinee that two minutes have elapsed.

NOTE The Station Auxiliary Transformer (SAT) will trip when load is adjusted above 2300 KW in the following step. The examinee is expected to take actions per Limitation D.4 of this surveillance procedure.

- *3.8.3 RAISE DG Load to 2400 KW to 0 Attempts to adjust KW to 2600 KW and 650 KVAR to 1750 between 2400 KW and 2000 KVAR, MAINTAIN for two KW.

minutes.

0 RECOGNIZES Loss of the SAT and discontinues the Surveillance.

N RC-S imulator-06 Revision: 00 Page 10 of 12 STEP ELEMENT STANDARD

-~

NOTE The examinee can take the following actions in any order.

CUE IF the examinee starts to take actions per LOA-AP- 101 (AC Power System Abnormal) for loss of the SAT, THEN tell the examinee another NSO will perform the actions per LOA-AP-101 for you.

0 Adjusts 1B DG Voltage to - - -

6 between 4 0 and 4300 volts.

N/A Reports to the Unit Supervisor. Reports the status of the 1B Diesel - - -

Generator to the Unit Supervisor.

CUE As Unit Supervisor acknowledge the report and then tell the examinee that this JPM is complete.

Record JPM Stop Time in the blank below.

NRC-Simulator-06 Revision: 00 Page 11 of 12 v

Operators Name:

Job

Title:

O N L O 0 RO 0SRO 0STA 0SRO Cert JPM

Title:

Perform LOS-DG-M3 with a Loss of the SAT JPM Number: NRC-Simulator-06 Revision Number: 00 Task Number and

Title:

1 1.007 Given Unit Supervisor authorization, perform the Main Control Room actions for a Diesel Generator Operability Test per station procedures.

WA Number and Importance:

264000, Emergency Generators: A4.04 Ability to manually operate andor monitor in the control room:

Manual start, loading, and stopping of emergency generator 3.7/3.7 Suggested Testing Environment: Simulator Actual Testing Environment: IXI Simulator Control Room 0In-Plant Testing Method: 0 Simulate Alternate Path: IxI Yes IXI Perform SRO Only: 0 Yes Time Critical: 0 Yes I Zl No Estimated Time to Complete: 2 minutes Actual Time Used: minutes

References:

LOS-DG-M3 1 B Diesel Generator Operability Test, Revision 59 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC-Simulator-06 Revision: 00 Page 12 of 12 Y INITIAL CONDITIONS You are the Unit-1 NSO:

0 LOS-DG-M3 was started last shift.

INITIATING CUE The Unit Supervisor has directed you to complete LOS-DG-M3 starting at Step 3.2 of Attachment 1B-Idle.

Exelon Nuclear Job Performance Measure Reset a Half Scram with Blown Group Scram Fuse JPM Number: NRC-Simulator-07 Revision Number: 00 Date: 11/05/2004 Developed By:

Instructor Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date

NRC-Simulator-07 Revision: 00 Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usaae. revalidate JPM usina stem 8 and 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (In-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

- Procedure Rev.

9. Pilot test the JPM:

Date

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/lnstructor Date SME/lnstructor Date .

SME/Instructor Date

NRC-Simulator-07 Revision: 00 Page 3 of 11 v Revision Record (Summary)

1. Revision 00: This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005.

NRC-Simulator-07 Revision: 00 Page 4 of 11 v SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any full power IC (IC-1 30)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Load the Computer Aided Exercise Program from the JPM Floppy disk (NRC-Simulator-07.0.cae) or manually enter the following:

- imf m i 0 9 8 125

- irf iasffl8e removed

- ior k3k06b97 false

- ior k3k06pz7 depressed

- dor k3k06b97

- dor k3k06pz7

3. DO NOT Bypass 1C APRM.
4. Silence, Acknowledge and Reset the annunciators. Then Acknowledge the Process Computer Alarms.
5. Clear BOTH Sequence of Events Recorder (SER) monitor screens.

- 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.

7. This completes the setup for this JPM.

NRC-Simulator-07 Revision: 00 Page 5 of 11 ASSOCIATED CAEPs

  1. Setup for NRC Simulator JPM Simulator-07
  1. Author: J.E. Ross
  1. Date Written: October 23, 2004
  1. Filename: A:NRC-Simulator-07.0.cae
  1. Revision: 00
  1. Revision Date: 10/23/2004
  1. Revised By: jer
  1. This is an Alternate Path JPM. The examinee will be told to reset a
  1. half scram. After resetting, one group light will be out. The
  1. will then enter LOA-RP-101 and replace the light b u l b . This will not
  1. work and the examinee will then have to re-insert a half scram.
  1. Fail 1C APRM upscale imf mniO98 125
  1. Simulate a blown group scram fuse on 1A RPS (A2) irf iasffl8e removed 1 1 1 1
  1. MAY NOT NEED THE FOLLOWING OVERRIDES I F APRM MALFUNCTION WORKS!!!!!!
  1. insert a half-scram on 1A RPS u

ior k3k06b97 false 1 2 1 2 ior k3k06pz7 depressed I 3 I 3 dor k3k06b97 1 4 1 4 dor k3k06pz7 1 5 1 5

  1. This ends this CAEP

NRC-Simulator-07 Revision: 00 Page 6 of 11 INITIAL CONDITIONS You are an Extra NSO assigned to Unit- 1 :

0 APRM 1C failed upscale earlier in the shift.

0 APRM 1C has NOT been bypassed INITIATING CUE The Unit Supervisor has directed you to complete the actions required by LOR-1 H 13-P603-A405 starting at Step B.6. Report to the Unit Supervisor when you have completed resetting the half-scram.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

b UNSAT requires written comments on respective step.

  • Denotes critical steps.

0 Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~

NRC-Simulator-07 Revision: 00 Page 7 of 11

-. JPM Start Time:

STEP ELEMENT STANDARD LOR DETERMINE if one APRM has This information was given in the B.6-a- failed Upscale or is Inoperable. Initial Conditions of this JPM (1C APRM Failed Upscale).

LOR BYPASS inoperable/upscale 0 PLACE APRM Bypass - - -

APRM if no other APRMs are Joystick in the C position.

bypassed in Channel A.

LOR RESET RPS Channel A. 0 ROTATES the RPS Scram - - -

  • B.6.c. Reset Switch to the 1/4(2/3) position and then ROTATES it back to the 2/3( 1/4) position, then releases the switch.
  • N/A RECOGNIZE that one RPS Group 0 DETERMINES that the A2 - - -

Light is still out in RPS Channel A. White Group Scram Light is OUT.

NOTE Examinee may Enter LOA-RP-101 at this point. If so he may not attempt to replace the light bulb until directed by the procedure later in this JPM.

If the examinee goes directly to LOA-RP- 101 from here, then mark the next actions as N/A and jump ahead to the step labeled LOA B.4.1.

  • N/A DETERMINE if light is burned out o DETERMINES that the light __ - -

or if possible blown fuse. bulb is NOT the problem.

CUE WHEN the examinee attempts to change the light bulb, THEN tell the examinee that the light bulb has been replaced and the light is still OUT.

  • 0 DETERMINES possibleBlown - __ __

RPS Fuse.

NRC-Simulator-07 Revision: 00 Page 8 of 11 STEP ELEMENT STANDARD N/A REPORTS to the Unit Supervisor Tells Unit Supervisor that the half-scram is reset and A2 Group Light is Out.

CUE As the Unit Supervisor acknowledge the report.

If asked, as the Unit Supervisor tell the examinee to take what ever actions are required per the appropriate procedures.

  • N/A ENTERS LOA-RP- 101 0 OBTAINS current copy of -

LOA-RP- 10 1.

LOA CHECK only one RPS Bus VERIFIES only one white light out -

B.4.1 affected and Control Rods NOT and no rods moving.

moving.

LOA SUSPEND any HALF SCRAM DETERMINES no half scram B.4.2 testing in progress. testing in progress (no action to take).

LOA CHECK more than one RPS BUS 0 DETERMINES only one light -

  • B.4.3 LIVE light out on a single out.

Channel.

CUE WHEN the examinee attempts to change the light bulb, THEN tell the examinee that the light bulb has been replaced and the light is still OUT.

o REPLACE affected bulb.

  • 0 DETERMINES bulb was NOT the problem and IMMEDIATELY inserts Half-Scram on RPS Channel A.

NOTE The examinee is NOT expected to determine which fuse is blown or which fuse to check blown as part of this JPM.

NRC-Simulator-07 Revision: 00 Page 9 of 11 b

b E L 2

0 E1 6 Z STEP ELEMENT STANDARD m 3 uz LOA VERIFY affected 1C71-F 18 fuse is No actions necessary (see the B.4.4 NOT blown at panels 1H 13-P609 below CUE).

and lH13-P611.

CUE WHEN examinee attempts to dispatch an operator to check for blown fuse, OR when he displays efforts to determine this information himself, THEN tell him to call Unit-2 and ask the Unit-2 Assist NSO to check the fuse.

SIM WHEN called to check the fuse, THEN modify the remote function OP (iasffl8e) to install the fuse.

CUE AFTER replacing the fuse, THEN CALL Unit-1 and tell the NSO that the fuse was blown and you have replaced the fuse with like-for-like per the appropriate procedures.

LOA RESET HALF SCRAM ROTATES the RPS Scram - - -

0

  • B.4.5 Reset Switch to the 1/4(2/3) position and then ROTATES it back to the 2/3( 1/4) position, and then releases the switch.

N/A REPORTS to the Unit Supervisor. Tells the Unit Supervisor that the __ - -

Half Scram has been reset.

CUE Acknowledge report as Unit Supervisor and tell the student that this JPM is complete. Record completion time in the block below.

JPM Stop Time:

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 B 8 8 8 8 8 8 B 8 8 8 8 8 8 8 8 8 8 8 B 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~

NRC-Simulator-07 Revision: 00 Page 10 of 1 1

- Operators Name:

Job

Title:

ONLO 0RO 0SRO 0 STA 0SRO Cert JPM

Title:

Reset a Half Scram with Blown Group Scram Fuse JPM Number: NRC-Simulator-07 Revision Number: 00 Task Number and

Title:

49.017 Given Unit Supervisor authorization, reset the RPS system scram per station procedures.

K/A Number and Importance:

212000 Reactor Protection System, A2.19 Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal condition or operations: Partial system activation (half-SCRAM) 3.W3.9 Suggested Testing Environment: Simulator Actual Testing Environment: [XI Simulator 0 Control Room 0In-Plant Testing Method: 0 Simulate Alternate Path: [XI Yes 0 No 4 Perform SRO Only: 0 Yes 4 No

-. Time Critical: 0 Yes [XI No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

LOR-1 H13-P603-A405, Channel A APRM Hi-Hi/Inop, Revision 03 LOA-RP-101, Unit-1 Loss of Reactor Protection System Power, Revision 07 LGP-3-2, Reactor Scram, Revision 50 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:

- Evaluators Name:

Evaluators Signature:

(Print)

Date:

NRC-Simulator-07 Revision: 00 Page 11 of 1 1

- INITIAL CONDITIONS You are an Extra NSO assigned to Unit-1 :

0 APRM I C failed upscale earlier in the shift.

APRM 1C has NOT been bypassed INITIATING CUE The Unit Supervisor has directed you to complete the actions required by LOR- 1H13-P603-A405 starting at Step B.6. Report to the Unit Supervisor when you have completed resetting the half-scram.