ML051240410
| ML051240410 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/07/2005 |
| From: | Ross J Exelon Generation Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML050900103 | List: |
| References | |
| 50-373/05-301, 50-374/05-301 50-373/05-301, 50-374/05-301 | |
| Download: ML051240410 (35) | |
Text
INITIAL SUBMITTAL OF THE IN-PLANT JPMS FOR THE LASALLE INITIAL EXAMINATION - MARCH 2005
Developed By:
Validated By:
Review By:
Exelon Nuclear Job Performance Measure Perform In-Plant Actions to Lineup CY to 1B LPCl JPM Number: NRC Inplant-01 Revision Number: 00 Date: 11/05/2004 Instructor Date
~-
SME or Instructor
~
~
Operations Representative Date Date
NRC InPlant-0 1 Revision: 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
Task description and number, JPM description and number are identified.
Knowledge and Abilities (WA) references are included.
Performance location specified. (In-plant, control room, or simulator)
Initial setup conditions are identified.
Initiating and terminating cues are properly identified.
Task standards identified and verified by SME review.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.
Date Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
- 10. If the JPM cannot be performed as written with proper
cover page.
SM UI nstructor Date SME/Instructor Date SME/I nstructor Date
NRC InPIant-0 1 Revision: 00 Page 3 of 10 Revision Record (Summary)
- 1. Revision 00:
c...r This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005. It is modeled after LaSaIle County Station JPM P-CY-02.
NRC InPlnt-01 Revision: 00 Page 4 of 10 MATERIALS
- 1. The following material is required to be provided to the student:
- a. Copy of LGA-CY-01 (after demonstrating ability to locate controlled copy)
- b. Laser Pointer
- 2. The student will retrieve all other materials needed to perform this JPM.
- 3. No additional material is required.
NRC InPlant-0 1 Revision: 00 Page 5 of 10 INITIAL CONDITIONS You are an Extra NSO assigned to Unit-1 :
An event is in progress that requires RPV Flooding on Unit-1.
1 B RHR pump motor is damaged and can NOT be started.
Condensate Transfer Pumps, ICYOIPA, ICYOlPB and lCYO3P are running.
1CY007, Cycled Condensate Transfer Jockey pump Discharge Valve is OPEN.
There is approximately 18 feet of water in the CY Tank.
RPV Pressure is less than 50 psig.
Radiation Protection Technicians have surveyed the Reactor Building and conditions are normal.
You have a plant Radio.
INITIATING CUE The Unit Supervisor has directed you to perform the In-plant actions required to line up CY for Alternate RPV Injection using the 1B RHR loop per LGA-CY-01, starting at Step C.3.c.
Actions required per LGA-CY-01, Steps C.1, C.3.a and C.3.b. have been completed.
Report to the Unit Supervisor when local actions are complete and CY is ready to inject using the 1B RHR Loop.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
8 8 8 8 8 8 8 8 8 8 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ ~
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
e Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
NRC InPlant-0 1 Revision: 00 Page 6 of 10 The timeclock starts when the candidate acknowledges the initiating cue.
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 m 8 8. 8 m 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 m m 8 8 8 ~ 8 8 m 8 8 8 8 m 8 8 8 8 8. 8 8 1
JPM Start Time:
NRC InPlant-0 1 Revision: 00 Page 7 of 10 NOTE The examinee should indicate use of the following Pesonal Protective Equipment (PPE): 1) gloves; 2) hardhat; 3) safety glasses; and 4) servicable shoes (gloves are required while manipulating the valves).
STEP ELEMENT STANDARD NOTE Students should NOT be penalized for time spent at the Radiation Protection Desk. Subtract time spent at the Rp Desk and time reviewing area dose rate maps from time student requires to complete this JPM.
CI d
v)
- N/A Obtain a copy of LGA-CY-01.
0 Student demonstrates ability to obtain a copy of LGA-CY-01.
CUE After student demonstrates where to obtain a copy of the procedure, then provide a current copy to the student.
NOTE The following two manually operated RHR valves are located on the 740 foot elevation of the reactor building, Southeast near column C-1 0 just east of the TIP room.
- C.3.c-OPEN 1E12-F388B, B RHR 0
Successhlly LOCATES and Upstrm Fill Valve, at U1 RE3 740 OPENS 1 E12-F388B.
C-10 outside S.E. Valve Room, 10 E. of TIP Room.
CUE After the examinee describes opening lE12-F388B, then respond that the valve is in the the condition indicated.
I NOTE Examinee MUST have a Locked Valve Key to accomplish the next step. I
- C.3.d.
GO TO Attachment 1A to 0
Successhlly LOCATES, UNLOCK and OPEN Valve, at U 1 RE3 740 C-10, outside S.E. Valve Room, 10 E. of TIP Room.
UNLOCKS, and OPENS lE12-F063B, B RHR Dwnst Fill 1 E 12-FO63B.
CUE After the examinee describes unlocking and opening 1 E 12-F063B, then respond that the valve is in the condition indicated.
NRC InPlant-01 Revision: 00 Page 8 of 10 STEP -
ELEMENT STANDARD Att. 1A Sign and Date completion of Step C.3.d.
completion of Step C.3.d.
Signs and Dates Attachment 1A for N/A Reports to the Unit Supervisor.
Tells the Unit Supervisor that in-plant actions to lineup CY for Alternate RPV Injection using 1 B RHR are completed.
CUE As the Unit Supervisor, acknowledge the report.
Termin Inform the student that this JPM is complete. Enter JPM Stop time in the ation space below.
NRC InPlant-0 1 Revision: 00 Page 9 of 10 Operators Name:
Job
Title:
ONLO RO 0 SRO 0 STA 0 SRO Cert JPM
Title:
Perform In-Plant Actions to Lineup CY to 1B LPCI JPM Number: NRC InPlant-01 Revision Number: 00 Task Number and
Title:
428.000 Evaluate Plant Conditions and flood the RPV K/A Number and Importance:
203000 RHRLPCI: Injection Mode K. 101 Knowledge of the physical connections andor cause-effect relationships between RHRLPCI: INJECTION MODE and the following: Condensate storage and transfer system 2.812.8.
Suggested Testing Environment: In-Plant Actual Testing Environment:
0 Simulator I7 Control Room Ix1 In-Plant Testing Method:
Simulate Alternate Path: 0 Yes IxI No 0
Perform SRO Only: 0 Yes IXI No Time Critical: 0 Yes EJ No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
LGA-CY-01, Use of Cycled Condensate System in Emergency Conditions, Revision 05.
EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? 0 Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
0 Satisfactory Unsatisfactory Comments:
~~
Evaluators Name:
(Print)
.-- Evaluators Signature:
Date:
NRC InPlant-0 1 Revision: 00 Page 10 of 10 INITIAL CONDITIONS W
You are an Extra NSO assigned to Unit-1 :
An event is in progress that requires RPV Flooding on Unit-1.
1B RHR pump motor is damaged and can NOT be started.
Condensate Transfer Pumps, I CY0 1 PA, 1 CY0 1 PB and 1 CYO3P are running.
1CY007, Cycled Condensate Transfer Jockey pump Discharge Valve is OPEN.
There is approximately 18 feet of water in the CY Tank.
RPV Pressure is less than 50 psig.
Radiation Protection Technicians have surveyed the Reactor Building and conditions are normal.
You have a plant Radio.
INITIATING CUE L-The Unit Supervisor has directed you to perform the In-plant actions required to line up CY for Alternate RPV Injection using the IB RHR loop per LGA-CY-01, starting at Step C.3.c.
Actions required per LGA-CY-0 1, Steps C. 1, C.3.a and C.3. b. have been completed.
Report to the Unit Supervisor when local actions are complete and CY is ready to inject using the 1 B RHR Loop.
Hydraulically Isolate a CRD HCU JPM Number: NRC Inplant-02 Revision Number: 00 Date: 1 1 /OW004 Exelon Nuclear Job Performance Measure Developed By:
Instructor Validated By:
SME or Instructor Review By:
Operations Representative Date Date Date
NRC InPlant-02 Revision: 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
- 1. Task description and number, JPM description and number are identified.
- 2. Knowledge and Abilities (WA) references are included.
- 3. Performance location specified. (In-plant, control room, or s im u I a t o r)
- 4. Initial setup conditions are identified.
- 5. Initiating and terminating cues are properly identified.
- 6. Task standards identified and verified by SME review.
- 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.
Date
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
responses, then revise the JPM.
cover page.
- 9. Pilot test the JPM:
- 10. If the JPM cannot be performed as written with proper
- 11. When JPM is revalidated, SME or Instructor sign and date JPM SMEllnstructor Date SME/Instructor Date SME/lnstructor Date
NRC InPlant-02 Revision: 00 Page 3 of 10 Revision Record (Summary)
- 1. Revision 00:
v This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005. It is modeled after LaSalle County Station JPM P-RD-02.
NRC InPlant-02 Revision: 00 Page 4 of 10 MATERIALS u
- 1. The following material is required to be provided to the student:
- a. Copy of LOP-RD-08 (after demonstrating ability to locate controlled copy)
- b. Laser Pointer
- 2. No additional material is required.
NRC InPlant-02 Revision: 00 Page 5 of 10 INITIAL CONDITIONS k
You are an Extra NSO assigned to Unit-1 Unit-1 is operating in Mode 1 near Rated Power conditions.
Control rod 42-03 has spuriously scrammed full-in.
Investigation shows that both Scram Solenoids have failed.
The NSO has the Clearance Order, it will be hung by another operator. Attachment B of LOP-RD-08 will be attached to this clearance order following the completion of your assigned task.
You have a plant radio.
INITIATING CUE The Unit Supervisor has directed you to hydraulically remove the HCU for control rod 42-03 from service per LOP-RD-08, starting at Step E.3. Electrical isolation is NOT required.
Notify the NSO when the Clearance Order sticker is ready to be placed.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 m 8 8 8 8 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
e Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 8 8 - 8 8 8 m 8 8 8 8 m 8 8 8 m = 8 8 8 8 8 8 8 8 8 8 m 8 8 8 8 8 8 m 8 8 ~
L
NRC InPlant-02 Revision: 00 Page 6 of 10 JPM Start Time:
STEP ELEMENT STANDARD NOTE Students should NOT be penalized for time spent at the Radiation Protection Desk. Subtract time spent at the RP Desk and time reviewing area dose rate maps from time student requires to complete this JPM.
If asked during the performance of this JPM, respond that cooling water needs to be isolated and therefore LOP-RD-08 is the correct procedure.
CUE N/A Obtain a copy of LOP-RD-08.
Student demonstrates ability to obtain a copy of LOP-RD-08.
CUE After student demonstrates where to obtain a copy of the procedure, then provide a current copy to the student.
~~
~~
E.3 CLOSE the following valves in order:
NOTE The examinee should indicate use of the following Pesonal Protective Equipment (PPE): 1) gloves; 2) hardhat; 3) safety glasses; and 4) semicable shoes (gloves are required while manipulating the valves).
For each of the following manipulations, tell the examinee that the component is in the condition that the examinee has indicated.
CUE "E.3.1 IC1 1-D4203-101, CRD HCU 0
Closes lCll-D4203-101.
Insert Water Valve.
Closes 1 C I I -D4203-102.
Withdraw Water Valve.
- E.3-3 1Cll-D4203-113, CRD HCU 0
Closes ICll-D4203-113.
Charging Water Valve.
- E-3-4 1Cll-D4203-103, CRD HCU 0
Closes 1 C 1 1 -D4203-103.
Drive Water Valve.
Closes I C I I -D4203-104.
Cooling Water Valve.
Closes 1C 1 I -D4203-105.
Exhaust Water Valve.
NRC InPlant-02 Revision: 00 Page 7 of 10 CUE If asked, tell the examinee that initially there was flow through the charging connection, but now it is stopped.
STEP ELEMENT STANDARD
Closes IC1 l-D4203-112.
Scram Discharge Valve.
E.4 DRAIN Accumulator Water Side as follows:
- E.4.1 ATTACH a hose from collection 0
Attaches drain hose from system to 1C1 l-D4203-107, CRD HCU Accumulator Water Side Drain Valve.
nipple on 1 C 1 1 -D4203-107 to collection system.
- E.4.2 Slowly OPEN 1C1 l-D4203-107, 0
Slowly opens CI2D HCU Accumulator Water 1Cll-D4203-107.
Side Drain Valve.
CUE If asked, tell the examinee that initially there was flow but now it has stopped.
CUE If asked, Attachment B will be attached to the Clearance Order following completion of your task.
NRC InPlant-02 Revision: 00 Page 8 of 10 CUE If asked, tell the examinee that the valve is in the condition that the examinee has indicated.
I u
STEP ELEMENT STANDARD E.5.5 When pressure has been bled off of Accumulator:
E.5.5.1 OPEN and lightly BACKSEAT Opens lCll-D4203-1 I 1 and then lC11-D4203-111, CRD HCU Accumulator Instrument Block Valve.
lightly backseats the valve.
~
CUE If asked, tell the examinee that the valve is in the condition that the examinee has indicated.
E.5.5.2 LOOSELY REPLACE cap on Loosely replaces cap on Charging - __ -
Nitrogen Charging Connection.
Connection.
E.5.6 SIGN-OFF Venting on Attachment Initials and dates Attachment B.
B (Attached to Clearance Order).
in TEST position for HCU 42-
- 03.
NORM-TEST S.R.I. Switch A and B toggle switches to TEST position.
Tell the examinee that the switches are in the position he has indicated.
w CUE JPM Stop Time:
8 8 8 8 8 8 8 8 8 8 8 8 8 8. 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~
NRC InPlant-02 Revision: 00 Page 9 of 10 Operators Name:
Job
Title:
ONLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM
Title:
Hydraulically Isolate a CRD HCU JPM Number: NRC Inplant-02 Revision Number: 00 Task Number and
Title:
25.013 When required, isolate a Hydraulic Control Unit for the Control Rod Drive Mechanism.
K/A Number and Importance:
201001 Control Rod Drive Hydraulic System, K1.lo Knowledge of the physical connections andor cause-effect relationships between CONTROL ROD DRIVE HYDRAULIC SYSTEM and the following: Control rod drive mechanisms 23/23 Suggested Testing Environment: In-Plant Actual Testing Environment:
0 Simulator 0 Control Room Ix1 In-Plant Testing Method: IxI Simulate Alternate Path: 0 Yes IXI No Perform SRO Only:
Yes 1xI No Time Critical: 0 Yes IxI No Estimated Time to Complete: 25 minutes Actual Time Used:
minutes
References:
LOP-RD-08, CRD System HCU Isolation, Revision 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? 0 Yes 0
No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
0 Satisfactory 0
Unsatisfactory Comments:
Evaluators Name:
(Print)
Evaluators Signature:
Date:
NRC InPlant-02 Revision: 00 Page 10 of 10 INITIAL CONDITIONS w
You are an Extra NSO assigned to Unit-1 Unit-1 is operating in Mode 1 near Rated Power conditions.
Control rod 42-03 has spuriously scrammed full-in.
Investigation shows that both Scram Solenoids have failed.
The NSO has the Clearance Order, it will be hung by another operator. Attachment B of LOP-RD-OS will be attached to this clearance order following the completion of your assigned task.
You have a plant radio.
INITIATING CUE The Unit Supervisor has directed you to hydraulically remove the HCU for control rod 42-03 from service per LOP-RD-08, starting at Step E.3. Electrical isolation is NOT required.
Notify the NSO when the Clearance Order sticker is ready to be placed.
Exelon Nuclear Job Performance Measure Swap VE trains with Charcoal Filter In Service JPM Number: NRC Inplant-03 Revision Number: 00 Date: 11/05/2004 Developed By:
Validated By:
Review By:
Instructor SME or Instructor Operations Representative Date Date Date
NRC InPlant-03 Revision: 00 Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST v
NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
- 1. Task description and number, JPM description and number are id en t ified.
- 2. Knowledge and Abilities (WA) references are included.
- 3. Performance location specified. (In-plant, control room, or si mu la tor)
- 4. Initial setup conditions are identified.
- 5. Initiating and terminating cues are properly identified.
- 6. Task standards identified and verified by SME review.
- 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.
Date
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
responses, then revise the JPM.
cover page.
- 9. Pilot test the JPM:
IO. If the JPM cannot be performed as written with proper
- 11. When JPM is revalidated, SME or Instructor sign and date JPM SM EA nstructor Date SMHlnstructor Date SM HI nstructor Date
NRC InPlant-03 Revision: 00 Page 3 of 13 Revision Record (Summary)
- 1. Revision 00:
This JPM was written by J.E. Ross for the 2003-01 ILT NRC Exam given on the week of 03/07/2005.
NRC InPlant-03 Revision: 00 Page 4 of 13 MATERIALS
- 1. The following material is required to be provided to the student:
- a. Copy of LOP-VE-01 (after demonstrating ability to locate controlled copy)
- b. Separate copy of ATTACHMENT FILTERS showing the OA Filter started the day before this JPM is given. (NOTE: Staple this attachment to the last page of this JPM so that it is handed to the examinee with the initial conditions sheet.)
- c. Laser Pointer
- 2. No additional material is required.
NRC InPlant-03 Revision: 00 Page 5 of 13 INITIAL CONDITIONS Unit-1 and Unit-2 are operating at fill power:
0 You are an Extra NSO.
0 The OA VE Train is in operation.
0 The OA VE Recirculation Charcoal Filter is aligned for FILTER operation.
0 The OB VE Train is in STANDBY and Section E.2 of LOP-VE-01 has been completed.
INITIATING CUE The Control Room NSO has just swapped VC trains and now you are directed you to swap VE trains per LOP-VE-0 1, Step E.6:
0 Start the OB VE Train; 0
Shutdown the OA VE train; 0
Report to the Control Room when the OA Recirculation Filter is shutdown (bypassed).
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
8 8 8 8 8 8 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 = 8 8 8 8 8 8 8 1 Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
0 Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 ~ 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 1
NRC InPlant-03 Revision: 00 Page 6 of 13 JPM Start Time:
---+
ELEMENT STANDARD NOTE Examinees should NOT be penalized for time spent at the Radiation Protection Desk. Subtract time spent at the RP Desk and time reviewing area dose rate maps fiom time examinee requires to complete this JPM.
NOTE The examinee should follow the following path through LOP-VE-0 1 :
- 1. Start at section E.6 Switching to VE Train B (With Train A Running)
- 2. E.6 will sent them to E.16 Train B Recirculation Filter Startup
- 3. Return to E.6 to swap trains
- 4. Then to E. 17 Train A Recirculation Filter Shutdown (Bypass)
- N/A Obtain a copy of LOP-VE-0 1.
0 Student demonstrates ability to obtain a copy of LOP-VE-01, CUE After examinee demonstrates where to obtain a copy of the procedure, then provide the following:
0 0
LOP-VE-01, Auxiliary Electric Equipment Room HVAC Operation Separate copy of page 6 1, ATTACHMENT FILTERS marked to show OA filter started the day before this JPM is given.
E.6 Switching to VE Train B (With Train A Running)
E.6.1 VERIFY VE Train B is prepared for standby [E.2]
Train B is in standby per Initial Conditions of this JPM E.6.2 If VE Train A Recirculation Charcoal Filter is aligned for FILTER operation, ALIGN/STARTUP VE Train B Recirculation Charcoal Filter prior to switching Trains. [E. 161 Goes to Section E. 16 Y
Y -
STEP ELEMENT STANDARD NRC InPlant-03 Revision: 00 Page 7 of 13 E.16 Train B Recirculation Charcoal Filter Startup E.16.1 RECORD Date/Time for OB VE Records startup time and date for Recirculation startup on Attachment FILTERS.
OB VE Recirculation Filter on Attachment FILTERS (page 61 of LOP-VE-01)
E.16.2 LOCALLY at OPAIOJ: (AB 731 Locates OPAlOJ N-1 6 )
- E.16.2.1 PLACE OHS-VE047, for Charcoal 0
PLACES handswitch for OB Filter dampers OVE07YB, OVE09YB and OVEOSYB to FILTER position.
VE Recirculation Filter to FILTER position.
E.16.2.2 VERIFY damper positions:
Inlet OVE07YB is OPEN Outlet OVE09YB is OPEN Bypass OVEOSYB is CLOSED CUE Point to the appropriate light for each of the three dampers, tell the examinee the light is lit.
E.16.3 Performs one of the following:
EitherRETAINSorFORWARDS Attachment Filters.
N/A Returns to Section E.6.3
- E.6.3 LOCALLY at OPAl OJ, At OPAlOJ, Starts OB VE MOMENTARILY PLACE OHS-VE041 B AEER HVAC Supply Fan OVEO1 CB control switch to START and RELEASE.
Supply Fan by placing the handswitch to START and then RELEASING the handswitch.
I CUE Handswitch is as you indicated.
I
NRC InPlant-03 Revision: 00 Page 8 of 13 STEP ELEMENT STANDARD E.6.4 After an approximate 60 second VERIFIES OB VE Supply Fan time delay for Zone Isolation Dampers to open, VERIFY B AEER HVAC Supply Fan ON indication is lit.
starts after a 60 second time delay.
CUE After 60 seconds point to the OB VE Supply Fan ON light and state that the light is lit.
"E.6.5 LOCALLY at OPA09J (AB 73 1 0
AtOPA09J71MMEDIATELY - - -
R-l5), IMMEDIATELY STOP Supply Fan OVEO 1 CA and VERIFY A AEER HVAC Supply Fan OFF light is lit.
Stops the OA VE Supply Fan.
CUE While pointing at the OA VE Supply Fan OFF light state that it is lit.
I 13.6.6 LOCALLY PERFORM the v
following at OPA 1 OJ:
E.6.6.1 VERIFY B AEER HVAC Air VERIFIES OB VE Air Cooled Cooled Condenser Fan OVE03CB is running.
Condenser Fan is running.
CUE While pointing at the OBVE Air Cooled Condenser Fan ON light state that it is lit.
E.6.6.2 VERIFY B AEER Filter VERIFIES OB VE Filter Differential Pressure on OPDI-VE064A is less than 0.92 inches of water.
Differential Pressure is <0.92 inches of water.
CUE Use a pen or other suitable pointer to indicate that the meter is reading somewhat less than 0.92 inches of water.
NRC InPlant-03 Revision: 00 Page 9 of 13 c,
g L 6
E $
c cA E 6
2 0 3 STEP ELEMENT STANDARD rn 3
0 2 E.6.6.3 After approximately 30 seconds for VERIFIES OB VE Return Fan is Fan Suction damper to open, VERIFY B AEER HVAC Return Fan OVE02CB is running.
running after 30 second time delay.
-~
CUE NOTE Point to the OB VE Refrigeration Unit ON light and state that it is lit.
Examinee may check refrigeration unit status locally OR by using the indicating light. Either method is acceptable.
After 30 seconds point at the OB VE Return Fan ON light and state that it is lit.
E.6.6.4 CHECK B AEER HVAC CHECKS OB VE Refrigeration Refrigeration Unit OVE04CB is Unit is running.
running.
r CUE Point to the OA VE Return Fan OFF light and state that it is lit.
I E.6.7.3 VERIFY A AEER HVAC Air VERIFIES OA VE Air Cooled Cooled Condenser Fan OVE03CA is stopped.
Point to the OA VE Air Cooled Condenser Fan OFF light and state that it is lit.
Condenser Fan is stopped.
CUE E.6.7.4 After an approximate 60 second VERIFIES OA VE Refrigeration Unit is stopped after 60 second time delay.
time delay for A/C Unit pump down, VERIFY A AEER HVAC Refrigeration Unit OVE04CA is 1-stopped.
/CUE Point to the OA VE Refrigeration Unit OFF light and state that it is lit.
I
NRC InPlant-03 Revision: 00 Page 10of 13 STEP ELEMENT STANDARD E.6.7.5 E.6.7.6 E.17 E.17.1 E. 17.2
- E.17.2.1 w
E.17.2.2 ACKNOWLEDGE and RESET A AEER Fan DP LO alarm(s) as necessary.
IF VE Train A Recirculation Charcoal Filter is aligned for FILTER operation, SHUTDOWN (BYPASS) VE Train A Recirculation Charcoal Filter.
[E. 171 Train A Recirculation Charcoal Filter Shutdown (Bypass)
VERIFY OA Recirculation Charcoal Filter operation is no longer required.
LOCALLY at OPAO9J:
PLACE OHS-VE007, for Charcoal Filter Dampers OVE07YA, OVE09YA and OVEOSYA to BYPASS position.
VERIFY damper positions:
RESETS OPA09J annunciators.
Goes to Section E. 17.
N/A, determined in initiating cue.
0 PLACES handswitch for OA Recirculation Filter to BYPASS.
Inlet OVE07YA is CLOSED Outlet OVE09YA is CLOSED Bypass OVEOSYA is OPEN CUE Point to the appropriate light for each of the three dampers, tell the examinee the light is lit.
STEP ELEMENT STANDARD E.17.3 RECORD Datenime of OA Records Shutdown time and date for OA VE Recirculation Filter on Attachment FILTERS @age 61 of Recirculation Charcoal Filter shutdown on Attachment FILTERS.
LOP-VE-0 1 )
N/A REPORTS to the Control Room.
Tells the either the Unit NSO or Unit Supervisor that the VE trains are swapped and the OA Recirculation Filter is in Bypass.
m e
u n
i t
Supervisor acknowledge the report.
Terminat Inform the student that this JPM is complete. Enter JPM Stop time in the ion space below.
NRC Inplant-03 Revision: 00 Page 11 of 13 r-6 rA JPM Stop Time:
8 8 8 8 8. 8 8 8 8 8 8. 8 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 1 L.
NRC InPlant-03 Revision: 00 Page 12 of 13 Operators Name:
Job
Title:
ONLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM
Title:
Swap VE trains with Charcoal Filter In Service JPM Number: NRC InPlant-03 Revision Number:
00 Task Number and
Title:
1 17.00 1 Given Unit Supervisor authorization, swap VCNE trains, per station procedures.
WA Number and Importance:
290003 2.1.20 Ability to execute procedure steps 4.3/4.2 Suggested Testing Environment: In-Plant Actual Testing Environment:
0 Simulator 0 Control Room Testing Method: IxI Simulate Alternate Path: 0 Yes 0
Perform SRO Only: 0 Yes (XI In-Plant Time Critical: 0 Yes Ed No Estimated Time to Complete: 3 minutes Actual Time Used:
minutes
References:
LOP-VE-01, Auxiliary Electric Equipment Room HVAC Operation, Revision 26
\\-
EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
0 Yes 0
No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory IJ Unsatisfactory Comments:
Evaluators Name:
(Print)
Evaluators Signature:
Date:
NRC InPlant-03 Revision: 00 Page 13 of 13 INITIAL CONDITIONS Unit-1 and Unit-2 are operating at full power:
0 You are an Extra NSO.
The OA VE Train is in operation.
The OA VE Recirculation Charcoal Filter is aligned for FILTER operation.
The OB VE Train is in STANDBY and Section E.2 of LOP-VE-01 has been completed.
INITIATING CUE The Control Room NSO has just swapped VC trains and now you are directed you to swap VE trains per LOP-VE-01, Step E.6:
Start the OB VE Train; Shutdown the OA VE train; 0
Report to the Control Room when the OA Recirculation Filter is shutdown (bypassed).
ATTACHMENT FILTERS VE RECIRCULATION CHARCOAL FILTER OPERATION TRACKING VE Recirculation Charcoal Filter Shutdown [E. 17.31 Date I Time I
VE Recirculation Startup [E.15.1]
Charcoal Filter Date I Time Startup [E.16.1]
Shutdown [E.18.3]
Date / Time Date / Time Level of Use 1 Continuous 61 of64 LOP-VE-0 1 Revision 26 November 17,2004