Letter Sequence Other |
---|
|
|
MONTHYEARML0431300062004-11-0909 November 2004 Emergency Amendment, Extend Implementation Period for License Amendment No. 294 Project stage: Other ML0431700362004-11-0909 November 2004 TS for Sequoyah, Unit 1, Emergency Amendment, Enclosure, Extend Implementation Period Project stage: Acceptance Review 2004-11-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24311A0332024-11-0707 November 2024 TVA Pre-Submittal Meeting Presentation on License Amendment Request to Revise SR 3.4.14.1 Reactor Coolant System Pressure Isolation Valves Leakage Testing Frequency on November 7, 2024 ML24040A2062024-03-26026 March 2024 Issuance of Amendment Nos. 367 and 361 Regarding Changes to the Hydrologic Analyses (EPID L-2020-LLA-0004) - Public ML24057A3792024-03-0808 March 2024 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24065A0262024-03-0101 March 2024 LAR Pre-Application Meeting TS 3.9.8 (Decay Time) and FHA Dose Analysis Meteorological Monitoring and Dispersion Modeling Topics ML24039A0792024-02-12012 February 2024 – Summary of Regulatory Audit Regarding the License Amendment Request for Hydrologic Analysis Changes to the Updated Final Safety Analysis Report (EPID L-2020-LLA-0004) - Public ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23072A0652023-04-0505 April 2023 Units 1 and 2 – Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML22334A0732023-02-0606 February 2023 Issuance of Amendment Nos. 363 and 357 Regarding Modification of the Approved Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22210A1182022-08-24024 August 2022 Issuance of Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22108A2822022-04-27027 April 2022 Summary of Regulatory Audit Regarding the License Amendment Request to Revise TS to Adopt TSTF 505, Rev. 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21245A2672021-10-27027 October 2021 NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) Fuel ML21298A0312021-10-27027 October 2021 Issuance of Exigent Amendment No. 350 Regarding One-Time Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System, ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20337A0372021-02-0101 February 2021 Issuance of Amendment No. 353 Regarding Steam Generator Tube Inspection Frequency ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20262H0262020-11-12012 November 2020 Issuance of Amendment Nos. 349 and 343 Regarding Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure ML20108F0492020-04-23023 April 2020 Issuance of Amendment No. 342 Exigent Amendment to Operate One Cycle with One Control Rod Removed ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML19281B5542019-11-18018 November 2019 Issuance of Amendment Nos. 347 and 341 Request to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19179A1352019-09-18018 September 2019 Issuance of Amendment Nos. 346 and 340, Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19196A2212019-07-18018 July 2019 Issuance of Exigent Amendment Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable ML19058A0292019-05-0707 May 2019 Issuance of Amendments Request to Modify Essential Raw Cooling Water Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) ML18159A4612018-08-0606 August 2018 Issuance of Amendments Regarding Request to Change Emergency Plan ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... ML16228A0962016-10-0303 October 2016 Issuance of Amendments to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML16225A2762016-09-29029 September 2016 Issuance of Amendments to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion Time ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues ML15100A0492015-09-28028 September 2015 SQN U2 Renewed License v2 ML15100A0462015-09-28028 September 2015 SQN U1 Renewed License v2 ML12249A3942012-09-26026 September 2012 Issuance of Amendments to Revise the Technical Specification to Allow Use of Areva Advanced W17 High Thermal Performance Fuel (TS-SQN-2011-07) ML12234A3812012-09-0606 September 2012 Issuance of Amendment Regarding the Proposed Operating License and Technical Specification Changes for Unit 2 Replacement Steam Generator Project to Conduct Heavy Load Lifts ML1121605932011-06-0303 June 2011 Sequoya Retake Initial Exam 2011-301 Final Administrative Documents ML1029900742010-12-21021 December 2010 License Amendment, Issuance of Amendments to Revised Technical Specifications to Resolve an Oversight Regarding the Operability Requirements for the Intermediate Range Neutron Flux Channels (TS-09-05) ML0933104032010-01-28028 January 2010 Issuance of Amendments Regarding Upgrade of Emergency Core Cooling System Requirements Per NUREG-1431 (TS 07-05) ML0928103332009-10-19019 October 2009 License Amendment, Issuance of Amendment to Allow Use of the W* Alternate Repair Criteria for Steam Generator Tubes (TS-09-02) ML0916107192009-08-14014 August 2009 License Amendment, Issuance of Amendments Regarding Revisions to the Ice Condenser Licensing Basis (TS 08-06) ML0909303302009-06-12012 June 2009 Issuance of Amendment Regarding Removal of Main Steam Isolation Valve Closure Times (TS 08-04) 2024-03-08
[Table view] Category:Safety Evaluation
MONTHYEARML24040A2062024-03-26026 March 2024 Issuance of Amendment Nos. 367 and 361 Regarding Changes to the Hydrologic Analyses (EPID L-2020-LLA-0004) - Public ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23072A0652023-04-0505 April 2023 Units 1 and 2 – Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22334A0732023-02-0606 February 2023 Issuance of Amendment Nos. 363 and 357 Regarding Modification of the Approved Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22304A1862022-12-0101 December 2022 Revised Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage ML22284A0072022-11-0707 November 2022 Authorization of Alternative Request RP-12 for Testing of Centrifugal Charging Pump 1B-B ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22263A3752022-09-29029 September 2022 Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage ML22210A1182022-08-24024 August 2022 Issuance of Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML21298A0312021-10-27027 October 2021 Issuance of Exigent Amendment No. 350 Regarding One-Time Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System, ML21245A2672021-10-27027 October 2021 NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) Fuel ML21266A3832021-10-0101 October 2021 Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21131A1632021-05-28028 May 2021 Authorization and Safety Evaluation for Alternative Request No. 21-ISI-1 ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20337A0372021-02-0101 February 2021 Issuance of Amendment No. 353 Regarding Steam Generator Tube Inspection Frequency ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20262H0262020-11-12012 November 2020 Issuance of Amendment Nos. 349 and 343 Regarding Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure ML20108F0492020-04-23023 April 2020 Issuance of Amendment No. 342 Exigent Amendment to Operate One Cycle with One Control Rod Removed ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML19281B5542019-11-18018 November 2019 Issuance of Amendment Nos. 347 and 341 Request to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19234A0132019-09-23023 September 2019 Alternative Request 18-ISI-1 Regarding Examination of Dissimilar Metal Welds in Reactor Vessel Head ML19179A1352019-09-18018 September 2019 Issuance of Amendment Nos. 346 and 340, Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19227A1102019-08-26026 August 2019 Alternative Request for the Turbine Driven Auxiliary Feedwater Pumps 10-Year Interval Inservice Testing Program ML19196A2212019-07-18018 July 2019 Issuance of Exigent Amendment Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable ML19058A0292019-05-0707 May 2019 Issuance of Amendments Request to Modify Essential Raw Cooling Water Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) ML19010A2742019-03-18018 March 2019 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report- TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation, Calculation, CDQ0000002016000041 Tennessee Valley Authority ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 ML18159A4612018-08-0606 August 2018 Issuance of Amendments Regarding Request to Change Emergency Plan ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... ML16340A0092017-03-0909 March 2017 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17059B7912017-03-0202 March 2017 Sequoyah Nuclear Plant, Units 1 and 2 - Relief from the Requirements of the American Society of Mechanical Engineer OM Code (CAC Nos. MF9305 and MF9306) ML16228A0962016-10-0303 October 2016 Issuance of Amendments to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML16225A2762016-09-29029 September 2016 Issuance of Amendments to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion Time ML16225A6332016-09-0202 September 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) ML16123A1312016-05-12012 May 2016 Relief Requests RP-01, RP-02, RP-06, RP-08, and RV-01 Related to the Inservice Testing Program, Fourth 10-Year Interval (CAC Nos. MF7099 and MF7100) ML15329A1862015-12-0404 December 2015 Request for Relief PR-07 for Alternative Inservice Pump Testing at Reference Values 2024-03-26
[Table view] |
Text
November 9, 2004 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT UNIT 1 ISSUANCE OF EMERGENCY AMENDMENT TO EXTEND IMPLEMENTATION PERIOD FOR LICENSE AMENDMENT NO. 294 (TAC NO. MC5041)
Dear Mr. Singer:
The Commission has issued the enclosed Amendment No. 297 to Facility Operating License No. DPR-77 for the Sequoyah Nuclear Plant (SQN), Unit 1. This amendment is in response to your application dated November 4, 2004. You submitted the proposed changes for SQN Unit 1 and requested that the proposed changes be considered on an emergency basis.
The proposed amendment extends the implementation period for Technical Specification Change 00-14 to May 15, 2005, from the original implementation period of the completion of the 2004 Cycle 13 refueling outage (License Amendment 294 for SQN Unit 1). There are no actual changes to the Technical Specifications. Tennessee Valley Authority requested the change in the implementation date on an emergency basis based on unforseen difficulties associated with the calibration of the low-temperature overpressure protection system setpoints.
A copy of the Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Robert J. Pascarelli, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-327
Enclosures:
- 1. Amendment No. 297 to License No. DPR-77
- 2. Safety Evaluation cc w/enclosures: See next page
ML043130006 NRR-058 OFFICE PDII-2/PM PDII-2/LA OGC PDII-2/SC NAME RPascarelli BClayton HMcGurren MMarshall DATE 11/8/04 11/8/04 11/9/04 11/9/04 DISTRIBUTION FOR: SEQUOYAH NUCLEAR PLANT, UNIT 1 ISSUANCE OF EMERGENCY AMENDMENT TO EXTEND IMPLEMENTATION PERIOD FOR LICENSE AMENDMENT NO. 297 (TAC NO. MC5041)
Dated: November 9, 2004 DISTRIBUTION:
PUBLIC PDII-2 R/F RidsNrrDlpmDpr RidsNrrDlpmpdii (EHackett)
RidsNrrDlpmLpdii2 (MMarshall)
RidsNrrPMRPascarelli RidsNrrLABClayton (Hard Copy)
RidsRgn2MailCenter (SCahill)
RidsAcrsAcnwMailCenter GHill (2 hard copies)
RidsOgcRp TBoyce JUhle WBateman KKavanaugh MMitchell SPeters
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-327 SEQUOYAH NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 297 License No. DPR-77
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated November 4, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 297, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented by May 15, 2005.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Michael L. Marshall, Jr., Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 9, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 297 FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Replace the following pages of the Appendix A and B Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain a marginal line indicating the area of change.
REMOVE INSERT I I II II VI VI XIII XIII 1-5 1-5 1-6 1-6 1-7 1-7 3/4 4-23 3/4 4-23 3/4 4-24 3/4 4-24 3/4 4-25 3/4 4-25 3/4 4-26 3/4 4-26 3/4 4-29 3/4 4-29 3/4 4-30 3/4 4-30 3/4 4-31 -----------
B 3/4 4-6 B 3/4 4-6 B 3/4 4-7 B 3/4 4-7 B 3/4 4-8 B 3/4 4-8 B 3/4 4-9 B 3/4 4-9 B 3/4 4-10 B 3/4 4-10 B 3/4 4-11 B 3/4 4-11 B 3/4 4-12 B 3/4 4-12 B 3/4 4-13 B 3/4 4-13 B 3/4 4-14 B 3/4 4-14
B 3/4 4-15
B 3/4 4-16
B 3/4 4-17
B 3/4 4-18
B 3/4 4-19
B 3/4 4-20
B 3/4 4-21
B 3/4 4-22
B 3/4 4-23 6-13a 6-13a
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 297 TO FACILITY OPERATING LICENSE NO. DPR-77 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-327
1.0 INTRODUCTION
By letter dated November 4, 2004, Tennessee Valley Authority (TVA, the licensee) requested an extension to the implementation period for Technical Specification (TS) Change 00-14 to May 15, 2005, from the original implementation period of the completion of the 2004 Cycle 13 refueling outage (License Amendment No. 294 for Sequoyah Nuclear Plant (SQN) Unit 1).
Tennessee Valley Authority (TVA) requested the change in implementation date on an emergency basis based on unforseen difficulties associated with the calibration of the low-temperature overpressure protection (LTOP) system setpoints. There are no proposed changes to the TSs.
2.0 BACKGROUND
By letter dated September 15, 2004, U. S. Nuclear Regulatory Commission (NRC) issued License Amendment Nos. 294 and 284 for SQN TS Change 00-14 (Units 1 and 2, respectively).
The amendments revised the TS reactor coolant system (RCS) pressure-temperature limits and the LTOP setpoints for each unit. These amendments were requested by TVA letter dated September 6, 2002. The implementation period for each amendment states:
This license amendment is effective as of its date of issuance, to be implemented by the completion of the 2004 Sequoyah Unit 1 Cycle 13 Refueling Outage.
TVA requested that implementation requirements of SQN Unit 1 Amendment 294 be amended as follows:
This license amendment is effective as of its date of issuance, to be implemented by May 15, 2005.
TVA has encountered unforeseen difficulties associated with calibration of the electronic modules that control the new Unit 1 LTOP system setpoints as provided in TS Change 00-14.
In addition, TVA discovered that a spare module would not calibrate to the new LTOP setpoints and must be shipped back to the vendor for refurbishment. Refurbishment of the spare module will not be available from the vendor in time to support TVAs schedule for startup from the ENCLOSURE
Unit 1 Cycle 13 refueling outage. In addition, implementation of the LTOP setpoints is not required during an outage.
3.0 EVALUATION The proposed change extends the implementation period from that stated in Amendment No. 294. This change has no technical or safety aspects. In issuing an amendment to an operating license, the NRC staff states when the amendment is effective and when the amendment must be implemented. These dates are given in Enclosure 1 of the amendment and are part of the operating license. As such, a change to the implementation date is a change to the operating license for the plant. Although there are no regulatory requirements on the implementation date specified in an amendment, the licensee is required by the operating license to fully implement the amendment by the date specified (i.e., by a date no later than that specified) or be in violation of its operating license.
The staff has reviewed the licensees regulatory and technical analyses in support of its proposed license amendment, which are described in Sections 4.0 and 5.0 of the licensees submittal of November 4, 2004. TVA has concluded that the change is not a technical issue as the implementation of this amendment during a refueling outage is not required.
The NRC staff concludes that, based on the considerations discussed above, the proposed change is acceptable.
4.0 EMERGENCY CIRCUMSTANCES In its letter of November 4, 2004, the licensee requested that this amendment be treated as an emergency amendment. In accordance with 10 CFR 50.91(a)(5), the licensee provided information regarding why this emergency situation occurred and how it could not be avoided.
By letter dated September 6, 2002, TVA requested a license amendment (TS Change 00-14) to implement new updated RCS pressure-temperature limits and LTOP setpoints for each unit.
Implementation involved calibration of the LTOP instrumentation. TVAs preferred schedule for performing the calibration of the LTOP setpoint instrumentation was to stage this work during plant shutdown for each unit. The Unit 1 Cycle 13 refueling outage provided the first opportunity for performing this calibration following NRC approval of the new limits.
Accordingly, during the Unit 1 Cycle 13 refueling outage, the LTOP system calibration activities were started. TVA encountered unforeseen difficulties associated with calibration of the electronic LTOP modules. These difficulties substantially extended the schedule in the outage to calibrate one module. TVA also discovered that a spare module would not calibrate to the new LTOP setpoints and had to be shipped back to the vendor for refurbishment. A refurbished spare module will not be available from the vendor in time to support TVAs schedule for startup from the Unit 1 Cycle 13 refueling outage and these modules are not readily available from other sources. Based on the hardships encountered with the calibration of one of two required modules, the time estimate to complete the calibration from the current condition would extend the time to resumption of full power. Further, the second required module may not be capable
of calibration to the new LTOP setpoints. Accordingly, TVA was not able to avoid the hardships associated with implementation of SQN Unit 1 TS Change 00-14.
The NRC staff concludes that an emergency condition exists, in that failure to act in a timely way would prevent resumption of operation of SQN Unit 1. In addition, the staff has assessed the licensee's reasons for failing to file an application sufficiently in advance to preclude an emergency, and concludes that the licensee promptly notified the staff of the deficiency, and promptly proposed this amendment to remedy the situation. The NRC staff concludes that the licensee has not abused the emergency provisions by failing to make timely application for the amendment. Thus, the conditions needed to satisfy 10 CFR 50.91(a)(5) exist, and the amendment is being processed on an emergency basis.
5.0 FINAL NO SIGNIFICANT HAZARDS CONSIDERATION
DETERMINATION The Commission's regulations in 10 CFR 50.92(c) state that the Commission may make a final determination that a license amendment involves no significant hazards consideration if operation of the facility in accordance with the amendment would not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or, (2) Create the possibility of a new or different kind of accident from any previously evaluated; or, (3) Involve a significant reduction in a margin of safety.
The following analysis was provided by the licensee in its letter of November 4, 2004.
A. The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed emergency license amendment extends the implementation period specified in License Amendment 294. The extension will allow TVA to complete the necessary refurbishment of control modules for the LTOP system prior to implementation. The proposed amendment is purely administrative and has no technical or safety aspects. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
B. The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed emergency license amendment extends the implementation period specified in SQN Unit 1 License Amendment 294. The extension will allow TVA to complete the necessary refurbishment of control modules for the Unit 1 LTOP system prior to implementation. The proposed amendment is purely administrative and has no technical or safety aspects. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
C. The proposed amendment does not involve a significant reduction in a margin of safety.
The proposed emergency license amendment extends the implementation period specified in SQN Unit 1 License Amendment 294. The extension will allow TVA to complete the necessary refurbishment of control modules for the Unit 1 LTOP system prior to implementation. The proposed amendment is purely administrative and has no technical or safety aspects. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
6.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Tennessee State official was notified of the proposed issuance of the amendment. The State official had no comments.
7.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has made a final no significant hazards finding with respect to this amendment.
Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
8.0 CONCLUSION
The Commission has concluded, based on the nature of the proposed change, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of these amendments will not be inimical to the common defense and security or to the health and safety of the public.
Additionally, the Commission has concluded, based on the considerations discussed above, that (1) the amendment does not: (a) involve a significant increase in the probability or consequences of an accident previously evaluated; or, (b) create the possibility of a new or different kind of accident from any previously evaluated; or, (c) involve a significant reduction in a margin of safety and therefore, the amendment does not involve a significant hazards consideration; (2) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (3) such activities will be conducted in compliance with the Commission's regulations, and (4) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: R. Pascarelli Date: November 9, 2004
Mr. Karl W. Singer SEQUOYAH NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Paul L. Pace, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority ATTN: Mr. James D. Smith 6A Lookout Place Sequoyah Nuclear Plant 1101 Market Street Tennessee Valley Authority Chattanooga, TN 37402-2801 P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mr. Michael J. Lorek, General Manager Nuclear Engineering Mr. David A. Kulisek, Plant Manager Tennessee Valley Authority Sequoyah Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Soddy Daisy, TN 37384-2000 Mr. Randy Douet Mr. M. Scott Freeman Site Vice President Sequoyah Nuclear Plant Sequoyah Nuclear Plant U.S. Nuclear Regulatory Commission Tennessee Valley Authority 2600 Igou Ferry Road P.O. Box 2000 Soddy Daisy, TN 37379 Soddy Daisy, TN 37384-2000 Mr. Lawrence E. Nanney, Director General Counsel Division of Radiological Health Tennessee Valley Authority Dept. of Environment & Conservation ET 11A Third Floor, L and C Annex 400 West Summit Hill Drive 401 Church Street Knoxville, TN 37902 Nashville, TN 37243-1532 Mr. John C. Fornicola, Manager County Mayor Nuclear Assurance and Licensing Hamilton County Courthouse Tennessee Valley Authority Chattanooga, TN 37402-2801 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Frederick C. Mashburn Senior Program Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801