TVA Pre-Submittal Meeting Presentation on License Amendment Request to Revise SR 3.4.14.1 Reactor Coolant System Pressure Isolation Valves Leakage Testing Frequency on November 7, 2024
ML24311A033
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/07/2024
From:
Tennessee Valley Authority
To:
NRC/NRR/DORL/LPL2-2
Buckberg, P
References
EPID L-2024-LRM-0120
Download: ML24311A033 (1)


Text

Sequoyah Units 1 and 2 License Amendment Request to Revise SR 3.4.14.1 Reactor Coolant System Pressure Isolation Valves Leakage Testing Frequency

November 7, 2024 Introduction

  • Tennessee Valley Authority (TVA) is submitting a license amendment request (LAR) for the following:
  • Sequoyah Nuclear Power Plant (SQN), Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79

Leakage, for both SQN Units 1 and 2

  • Proposed revisions would revise SR 3.4.14.1 to reference only the Inservice Testing (IST) Program for the performance Frequency

l 2

Background

  • SQN Unit 2 entered the U2R26 refueling outage approximately 53 days earlier than scheduled
  • U2R26 refueling outage was originally scheduled to commence September 27, 2024
  • Recovery from Unit trip on July 30, 2024, requires a significant repair of the turbine generator
  • Projected forced outage duration resulted in decision to start U2R26 refueling outage on August 5, 2024
  • U2R26 refueling is completed and SQN Unit 2 is currently holding in Mode 5 until turbine generator repair efforts are completed
  • Target date for turbine generator repair is second quarter of 2025

l 3

Background

  • SQN Unit 2 evolutions during the extended forced outage include:
  • Move plant from Mode 5 to Mode 2 to perform low power physics testing and surveillances projected in January 2025
  • Return to Mode 5 and hold until turbine generator is repaired
  • TS requires partial performance of SR 3.4.14.1 again during plant return to power

l 4 Reason for Proposed Change

  • RCS PIV leakage testing is required by ASME OM Code and implemented by IST Program
  • Current TS SR 3.4.14.1 requires repeating testing that has been previously completed on those valves that will be exercised open upon return to Mode 5
  • Proposed change would align SQN SR 3.4.14.1 frequency with the requirements of the ASME OM Code and eliminate need for repetitive testing
  • Eliminating repetitive RCS PIV testing would lower current and future outage personnel dose and reduce outage schedule time
  • Test is conducted using RCS pressure and requires system manipulations with multiple entries into LCOs, often on or close to critical path
  • Performance of SR 3.4.14.1 testing poses personnel safety risks due to system configuration and method of RCS leakage measurement

l 5 Description of the Proposed Change

l 6 Description of the Proposed Change

  • Frequency for SQN Units 1 and 2, SR 3.4.14.1, is replaced with "In accordance with the Inservice Testing Program"
  • Proposed changes would not add or remove any RCS PIVs from the TS or ASME OM Code requirements or alter the SR acceptance criteria
  • Proposed changes are consistent with TSTF-600 which is undergoing NRC review
  • TVA will confirm, prior to LAR submittal, that the RCS PIV testing Frequencies being removed from the TS are not credited for satisfying any requirements described in the UFSAR or any commitments for reasons other than being a TS requirement

l 7 Technical Evaluation

  • RCS PIVs within the scope of this request are listed in SQN Units 1 and 2 TS Bases Table B3.4.14-1
  • The test history for the SQN valves subject to PIV testing have shown good performance
  • PIV test performance history will be included with the license amendment request
  • Leakage testing of the RCS PIVs at the frequency established by the IST Program is satisfactory for determining valve integrity as it relates to operational readiness

l 8 Precedents The following precedents are similar to the proposed license amendment request for SQN Units 1 and 2

  • Duke Energy license amendment request approved in October 2023 (ML23241A987)
  • Vogtle Units 1 and 2 license amendment request approved in April 2024 (ML24030A909)

l 9 Schedule for Submittal

  • TVA plans to submit expedited license amendment request to NRC by November 22, 2024
  • Request NRC approval by February 28, 2025
  • LAR to be implemented within 30 days of NRC approval

l 10