JAFP-04-0166, September 2004 Monthly Operating Report for James a FitzPatrick Nuclear Power Plant

From kanterella
(Redirected from ML042960173)
Jump to navigation Jump to search
September 2004 Monthly Operating Report for James a FitzPatrick Nuclear Power Plant
ML042960173
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/11/2004
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-04-0166
Download: ML042960173 (3)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP A Entergy P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan Site Vice President - JAF October 11, 2004 JAFP-04-0166 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 September 2004 Monthly Operating Report

Dear Sir:

Enclosed is the Monthly Operating Report (MOR) for the James A. FitzPatrick Nuclear Power Plant for the month of September 2004.

MOR data has been prepared and formatted using the INPO Consolidated Data Entry (CDE) submittal process.

Should you have any questions concerning this report, please direct them to Mr. Mick Baker, Thermal Performance Engineer, at (315) 349-6181.

Very truly yours, TAS:MB:dr Enclosure 0q

d cc: Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Patrick Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop MS-8-C2 Washington, DC 20555-0001 Mr. Ronald Toole ENN BWR SRC Operations Subcommittee Chairman 1282 Valley of Lakes Box R-10 Hazelton, PA 18202 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223-1350 JENG JAFP Files RMS (JAF)

OPERATING DATA REPORT DOCKET NO. 50-333 UNIT NAME FitzPatrick I DATE October 06, 2004 COMPLETED BY Mick Baker TELEPHONE (315) 349-6181 REPORTING PERIOD: September 2004

1. Design Electrical Rating 816.00
2. Maximum Dependable Capacity (MWe-Net) 813.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 580.23 6,422.88 196,327.38
4. Number of Hours Generator On4ine 576.30 6,352.89 190,924.09
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 410,343.00 5,084,049.00 142,989,813.00 UNIT SHUTDOWNS Type Method of No. Date F: Forced Duration 1 Shutting Cause & Corrective Action S: Scheduled Hours)own 2 Comments 2004-03 09125/2004 S 143.70 C I Shut Down for Refuel Outage.

SUMMARY

During the month of September 2004, thermal power output continued to coast down from 90%

power as the plant approached its refueling outage. The plant performed three (3) planned downpowers to 80%,

78%, and 78% on September 7th, September 14th, and September 21 st, to perform weekly control rod surveillance testing. On September 24th the plant commenced a reactor shutdown to enter Refuel Outage 16. On September 25th at 0018 the plant removed the turbine from service and at 0414 the plant went sub-critical with all rods in.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1