ML042940276

From kanterella
Jump to navigation Jump to search
Revised Technical Specifications Bases
ML042940276
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 10/08/2004
From: Gordon Peterson
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042940276 (12)


Text

Duke GARY R. PETERSON EPower Vice President A Duke Energy Company McGuire Nuclear Station Duke Power MG01 VP /12700 Hagers Ferry Rd.

Huntersville, NC 28078-9340 704 875 5333 704 875 4809 fax grpeters @duke-energy. corn October 8, 2004 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Technical Specifications Bases Changes Attached is a revision to McGuire Technical Specifications (TS) Bases Section 3.7.5, "Auxiliary Feedwater (AFW)

System." Specifically, the Bases for TS 3.7.5 is revised to correct the designation of the assured source of water to the AFW System.

Attachment 1 contains revised TS Bases. Attachment 2 contains a List of Effective pages.

Inquiries on this matter should be directed to J. S. Warren at (704) 875-5171.

Very truly yours G. R. Peterson (DE) www. dukepower. corn

U.S. Nuclear Regulatory Commission October 8, 2004 Page 2 xc w/Attachments:

W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 J. J. Shea (Addressee Only)

NRC Project Manager (MNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 J. B. Brady Senior Resident Inspector (MNS)

U. S. Nuclear Regulatory Commission McGuire Nuclear Site Beverly 0. Hall, Section Chief Radiation Protection Section 1645 Mail Service Center Raleigh, NC 27699-1645

U.S. Nuclear Regulatory Commission October 8, 2004 Page 3 G. R. Peterson, affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.

G. R. Peterson, Site Vice President Subscribed and sworn to me: Dubber cood/,

Date C$ , Notary Public My commission expires: US /7, c '9 e

......... Date

.... SEA~t, .

Attachment 1 McGuire Nuclear Station Units 1 and 2 Revised Technical Specifications Bases

"
.:,k --"

AFW System B 3.7.5 B 3.7 PLANT SYSTEMS B 3.7.5 Auxiliary Feedwater4(AFW) System . !.;,;

BASES BACKGROUND The AFW System automatically supplies feedwater to the steam generators to remove decay heat from the Reactor Coolant System upon the loss of normal feedwater supply. The AFW pumps take suction from the non-safety related AFW Storage Tank (Water Tower). The assured source of water to the AFW System is the Nuclear Service Water (RN)

System. The turbine and motor driven pump discharge lines to each individual steam generator join into a single line outside containment.

These individual lines penetrate the containment and enter each steam generator through the auxiliary feedwater nozzle. The steam generators function as a heat sink for core decay heat. The heat load is dissipated by releasing steam to the atmosphere from the steam generators via the main steam safety valves (MSSVs) (LCO 3.7.1) or SG PORVs (LCO 3.7.4). If the main condenser is available, steam may be released via the steam dump valves and recirculated to the condensate storage system (CSS).

The AFW System consists of two motor driven AFW pumps and one steam turbine driven pump configured into three trains. Each of the motor driven pumps supply 100% of the flow requirements to two steam generators, although each pump has the capability to be realigned to feed other steam generators. The turbine driven pump provides 200% of the flow requirements and supplies water to all four steam generators. Travel stops are set on the steam generator flow control valves such that the pumps can supply the minimum flow required without exceeding the maximum flow allowed. The pumps are equipped with independent recirculation lines to prevent pump operation against a closed system.

Each motor driven AFW pump is powered from an independent Class 1E power supply. The steam turbine driven AFW pump receives steam from two main steam lines upstream of the main steam isolation valves. Each of the steam feed lines will supply 100% of the requirements of the turbine driven AFW pump.

The AFW System is capable of supplying feedwater to the steam generators during normal unit startup, shutdown, and hot standby McGuire Units 1 and 2 B 3.7.5-1 Revision No. 60

BASES AFW System B 3.

7.5 BACKGROUND

(continued) conditions. One turbine driven pump at full flow is sufficient to remove decayiheat and cool the unit to residual heat removal (RHR) entry conditions. During unit cooldown, SG pressures and Main Steam pressures decrease simultaneously. Thus, the turbine driven AFW pump with a reduced steam supply pressure remains fully capable of providing flow to all SGs. Thus, the requirement for diversity in motive power sources for the AFW System is met.

The AFW System is designed to supply sufficient water to the steam generator(s) to remove decay heat with steam generator pressure at the lowest setpoint of the MSSVs plus 3% accumulation. Subsequently, the AFW System supplies sufficient water to cool the unit to RHR entry conditions, with steam released through the SG PORVs or MSSVs.

The motor driven AFW pumps actuate automatically on steam generator water level low-low in 1 out of 4 steam generators by the ESFAS (LCO 3.3.2). The motor driven pumps also actuates on loss of offsite power, safety injection, and trip of all MFW pumps. The turbine driven AFW pump actuates automatically on steam generator water level low-low in 2 out of 4 steam generators and on loss of offsite power.

The AFW System is discussed in the UFSAR, Section 10.4.7 (Ref. 1).

APPLICABLE The AFW System mitigates the consequences of any event with loss of SAFETY ANALYSES normal feedwater.

The design basis of the AFW System is to supply water to the steam generator to remove decay heat and other residual heat by delivering at least the minimum required flow rate to the steam generators.

In addition, the AFW System must supply enough makeup water to replace steam generator secondary inventory lost as the unit cools to MODE 4 conditions. Sufficient AFW flow must also be available to account for flow losses such as pump recirculation valve leakage and line breaks.

The limiting Design Basis Accidents (DBAs) and transients for the AFW System are as follows:

a. Feedwater Line Break (FWLB);
b. Steam Generator Tube Rupture (SGTR);

McGuire Units 1 and 2 B 3.7.5-2 Revision No. 60

BASES AFW System B 3.7.5 APPLICABLE SAFETY ANALYSES (continued)

c. MairJ Steam Line Break (MSLB);
d. Small Break Loss of Coolant Accident (SBLOCA); and
e. Loss of Offsite AC Power.

The AFW System design is such that it can perform its function following a FWLB between the Steam Generator and the feedwater isolation valve, combined with a loss of offsite power following turbine trip, and a single active failure of the steam turbine driven AFW pump. In such a case, one motor driven AFW pump will deliver nearly all of its flow to the steam generator with the broken MFW header until flow to that steam generator can be terminated by the operator. Sufficient flow is delivered to the intact steam generators by the redundant AFW pump.

The ESFAS automatically actuates the AFW turbine driven pump and associated power operated valves and controls when required to ensure an adequate feedwater supply to the steam generators during loss of offsite power.

The AFW System satisfies the requirements of Criterion 3 of 10 CFR 50.36 (Ref. 2).

LCO This LCO provides assurance that the AFW System will perform its design safety function to mitigate the consequences of accidents that could result in overpressurization of the reactor coolant pressure boundary. Three independent AFW pumps in three diverse trains are required to be OPERABLE to ensure the availability of RHR capability for all events accompanied by a loss of offsite power and a single failure.

This is accomplished by powering two of the pumps from independent emergency buses. The third AFW pump is powered by a different means, a steam driven turbine supplied with steam from a source that is not isolated by closure of the MSIVs.

The AFW System is configured into three trains. The AFW System is considered OPERABLE when the components and flow paths required to provide redundant AFW flow to the steam generators are OPERABLE.

This requires that the two motor driven AFW pumps be OPERABLE in two diverse paths, each supplying AFW to separate steam generators.

The turbine driven AFW pump is required to be OPERABLE with redundant steam supplies from two main steam lines upstream of the MSIVs, and shall be capable of supplying AFW to any of the steam generators. The piping, valves, instrumentation, and controls in the required flow paths also are required to be OPERABLE.

McGuire Units 1 and 2 B 3.7.5-3 Revision No. 60

BASES AFW System B 3.7.5 LCO (continued)

The LCO is modified by a Note indicating that one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.

This is because of the reduced heat removal requirements and short period of time in MODE 4 during which the AFW is required and the insufficient steam available in MODE 4 to power the turbine driven AFW pump.

APPLICABILITY In MODES 1, 2, and 3, the AFW System is required to be OPERABLE in the event that it is called upon to function when the MFW is lost. In addition, the AFW System is required to supply enough makeup water to replace the steam generator secondary inventory, lost as the unit cools to MODE 4 conditions.

In MODE 4 the AFW System may be used for heat removal via the steam generators.

In MODE 5 or 6, the steam generators are not normally used for heat removal, and the AFW System is not required.

ACTIONS A Note prohibits the application of LCO 3.0.4.b to an inoperable AFW train when entering MODE 1. There is an increased risk associated with entering MODE 1 with an AFW train inoperable and the provisions of LCO 3.0.4.b, which allow entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, should not be applied in this circumstance.

A.1 If one of the two steam supplies to the turbine driven AFW train is inoperable, action must be taken to restore OPERABLE status within 7 days in MODES 1, 2, and 3. The 7 day Completion Time is reasonable, based on the following reasons:

a. The redundant OPERABLE steam supply to the turbine driven AFW pump;
b. The availability of redundant OPERABLE motor driven AFW pumps; and
c. The low probability of an event occurring that requires the inoperable steam supply to the turbine driven AFW pump.

McGuire Units 1 and 2 B 3.7.5-4 Revision No. 60

BASES AFW System B 3.7.5 ACTIONS (continued)

The second Completion Time for Required Action A.1 establishes a limit on the maximum time allowed for any combination of Conditions to be inoperable during any continuous failure to meet this LCO.

The 10 day Completion Time provides a limitation time allowed in this specified Condition after discovery of failure to meet the LCO. This limit is considered reasonable for situations in which Conditions A and B are entered concurrently. The AND connector between 7 days and 10 days dictates that both Completion Times apply simultaneously, and the more restrictive must be met.

B.1 With one of the required AFW trains (pump or flow path) inoperable in MODE 1, 2, or 3 for reasons other than Condition A, action must be taken to restore OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This Condition includes the loss of two steam supply lines to the turbine driven AFW pump. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable, based on redundant capabilities afforded by the AFW System, time needed for repairs, and the low probability of a DBA occurring during this time period.

The second Completion Time for Required Action B.1 establishes a limit on the maximum time allowed for any combination of Conditions to be inoperable during any continuous failure to meet this LCO.

The 10 day Completion Time provides a limitation time allowed in this specified Condition after discovery of failure to meet the LCO. This limit is considered reasonable for situations in which Conditions A and B are entered concurrently. The AND connector between 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 10 days dictates that both Completion Times apply simultaneously, and the more restrictive must be met.

C.1 and C.2 When Required Action A.1 or B.1 cannot be completed within the required Completion Time, or if two AFW trains are inoperable in MODE 1, 2, or 3, the unit must be placed in a MODE in which the LCO does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

In MODE 4 with two AFW trains inoperable, operation is allowed to continue because only one motor driven pump AFW train is required in McGuire Units 1 and 2 B 3.7.5-5 Revision No. 60

BASES AFW System B 3.7.5 ACTIONS (continued) accordance with the Note that modifies the LCO. Although not required, the unit may continue to cool down and initiate RHR.

DA If all three AFW trains are inoperable in MODE 1, 2, or 3, the unit is in a seriously degraded condition with no safety related means for conducting a cooldown, and only limited means for conducting a cooldown with nonsafety related equipment. In such a condition, the unit should not be perturbed by any action, including a power change, that might result in a trip. The seriousness of this condition requires that action be started immediately to restore one AFW train to OPERABLE status.

Required Action D.1 is modified by a Note indicating that all required MODE changes or power reductions are suspended until one AFW train is restored to OPERABLE status. In this case, LCO 3.0.3 is not applicable because it could force the unit into a less safe condition.

E.1 In MODE 4, either the reactor coolant pumps or the RHR loops can be used to provide forced circulation. This is addressed in LCO 3.4.6, 'RCS Loops-MODE 4.' With one required AFW train with a motor driven pump inoperable, action must be taken to immediately restore the inoperable train to OPERABLE status. The immediate Completion Time is consistent with LCO 3.4.6.

SURVEILLANCE SR 3.7.5.1 REQUIREMENTS Verifying the correct alignment for manual, power operated, and automatic valves in the AFW System water and steam supply flow paths provides assurance that the proper flow paths will exist for AFW operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since they are verified to be in the correct position prior to locking, sealing, or securing. This SR also does not apply to valves that cannot be inadvertently misaligned, such as check valves. This Surveillance does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. The SR is also modified by a note that excludes automatic valves when THERMAL POWER is <

10% RTP. Some automatic valves may be in a throttled position to support low power operation.

McGuire Units 1 and 2 B 3.7.5-6 Revision No. 60

BASES AFW System B 3.7.5 SURVEILLANCE REQUIREMENTS (continued)

The 31 day Frequency is based on engineering judgment, is consistent with thie procedural controls governing valve operation, and ensures correct valve positions.

SR 3.7.5.2 Verifying that each AFW pump's developed head at the flow test point is greater than or equal to the required developed head ensures that AFW pump performance has not degraded during the cycle. Flow and differential head are normal tests of centrifugal pump performance required by Section Xl of the ASME Code (Ref 3). Because it is undesirable to introduce cold AFW into the steam generators while they are operating, this testing is performed on recirculation flow. This test confirms one point on the pump design curve and is indicative of overall performance. Such inservice tests confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. Performance of inservice testing discussed in the ASME Code, Section Xl (Ref. 3) (only required at 3 month intervals) satisfies this requirement.

The Frequency for this SR is in accordance with the Inservice Testing Program.

This SR is modified by a Note indicating that the SR should be deferred until suitable test conditions are established. This deferral is required because there is insufficient steam pressure to perform the test. The test should be conducted within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the steam pressure exceeding 900 psig.

SR 3.7.5.3 This SR verifies that AFW can be delivered to the appropriate steam generator in the event of any accident or transient that generates an ESFAS, by demonstrating that each automatic valve in the flow path actuates to its correct position on an actual or simulated actuation signal.

This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls.

The 18 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a unit outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power. The 18 month Frequency is acceptable based on operating experience and the design reliability of the equipment.

This SR is modified by a Note that states the SR is not required in MODE

4. In MODE 4, the required AFW train may already be aligned and operating.

McGuire Units 1 and 2 B 3.7.5-7 Revision No. 60

BASES AFW System B 3.7.5 SURVEILLANCE REQUIREMENTS (continued)

SR 3.7.5.4 This SR verifies that the AFW pumps will start in the event of any accident or transient that generates an ESFAS by demonstrating that each AFW pump starts automatically on an actual or simulated actuation signal in MODES 1, 2, and 3. In MODE 4, the required pump may already be operating and the autostart function is not required. The 18 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a unit outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power.

This SR is modified by two Notes. Note 1 indicates that the SR can be deferred until suitable test conditions are established. This deferral is required because there is insufficient steam pressure to perform the test.

The test should be conducted within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the steam pressure exceeding 900 psig. Note 2 states that the SR is not required in MODE 4.

In MODE 4, the required pump may already be operating and the autostart function is not required. In MODE 4, the heat removal requirements would be less providing more time for operator action to manually start the required AFW pump if it were not in operation.

REFERENCES 1. UFSAR, Section 10.4.7.

2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
3. ASME, Boiler and Pressure Vessel Code, Section Xl.

McGuire Units 1 and 2 B 3.7.5-8 Revision No. 60