Plant Performance Update Meeting June 6, 2002
';011 11'1 151!i!
I I 1 jj
~II. 1II 1l1' III ' III l jjlinli%!17W1!1:tII
!\\I1ll'I!
1 IIII
]III.I III I l11,11 i
iii,
il il
Agenda
- Introduction-Brew Barron
- Operational Performance-Dhiaa Jamil
- Generation Status Trending
- 2EOC14 Refueling Outage
- ALARA Performance
- Correct Component Verification
- Miscellaneous-Bryan Dolan
- Corrective Action Program
- Security 2
Operational Performance 3
McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o
LL.0 M
C-)
Cu
- tf Q
M C.
CD 0
L-0 C-)
Cu E)
~0 wi ID-a 100% -
90% -
80% -
70% -
60%
50%
40%
30% -
20% -
10% -
rv==
Unit 2 (2.8 days)
Main Steam Pressure Trip Unit 2 (0.44 days)
Add Oil to 2B NCP 1EOC14 (38.2 days)
Cond. Boost Pmp Mtrs.
Busline Relay Mod Non-vital Spare Inverter (KXS to KXA)
Vital Inverters Replace.
Rx Vessel 1 0-year ISI CA Tank Tie-in 1 EOC15 (25 days)
Main Gen. Volt Reg.
No S/G Work 10W% Vessel Head Bare Metal Inspection 2EOC15 (30 days)
Rx Vessel 10-year ISI Main Gen. Volt Reg No S/G Work Unit. (3133 days)
failed capacitor TARGET REACTOR C.F. ('M l
-WELYACTUAL I
2EOC14 (32.3 days)
CA Tank Tlein.
Cond. Boost Prmp MI. 2C 1 D% Vessel Head Bare Metal Inspection 0%
I.
a 1U il' II 111 rI
] I 1 1 II T T ITI I :f
- 7 tD O -
N 0
OW4 N
Q (0
O?
(L 0
2 I-N4
....7..
a
.0C)
IL a) r7 I-0.
I5 N1 a
0)0a (U
M M
0)
M 7 <: Q
.q M )
to N
r N
-20022 N
r-N I II II I
FTT w
7u 0.<
tanu 11 1-111 111 IT
.. 1..11...1........
3 I
ClM 0
s 0w o>
0
-2003 1
2001 II II i
Generation Status Trending 4
2EOC14 Refueling Outage 5
Completed Auxiliary Feedwater Storage Tank Tie In 6
Repaired CRDM K-8 Intermediate Canopy Seal Weld Intermediate Canopy Seal Approx. 6 ft.
Reactor Head 7
Performed 100% Bare Metal Head Inspection -
No Corrosion or Boron Found 8
r-..
9
Shutdown/Startup Performance Improvements
- Tuning of process control system
- Tuning of valve actuators
- Sequencing of steam dump valves
- Procedural improvements
- Simulator and training improvements
- Manual reactor / turbine trip from low power 10
ALARA Performance
- Changes
- Step change in ALARA planning and scheduling
- Radiation Work Permit setpoint adjusted down to more effectively use dosimetry as ALARA tool
- Focused on radiation worker desired behavior prior to and during the outage
- PIP threshold changes 11
ALARA Performance (continued)
- Results
- Desired worker behavior demonstrated
- Desired increase of PIPs at lower threshold was obtained
- Comprehensive self-assessment of outage radiation practices - complete 12
2 EOC1 4 Refueling Outage
- Zero
- Zero
- Zero
- 32 dc LERs events injuries jys 13
Correct Component Verification (CCV)
- Defined specific behaviors associated with CCV
- Created a CCV flag
- Conducted classroom and flow loop scenario training
- Targeted observations with CCV focus
- 2EOC14 was completed without a CCV event
- Similar focus on CCV is now underway in operations and chemistry 14
Miscellaneous 15
Corrective Action Program PIP Significance Categories ACA No Cause Analysis 16
Corrective Action Program
- PIP Action Codes
- Corrective Actions to Prevent Recurrence (CAPR)
- Directed at the Root Cause of Category I and 2 PIPS
- Corrective Actions (CA)
- Directed at CAQ
- Elective / Enhancement Actions (ELEC)
- Structure helps focus corrective action effectiveness reviews on highest priority actions (CAPRs) 17
- Completed comprehensive inventory
- No discrepancies 18
Security
m
- No concerns about schedule for compliance with NRC order.
19