Plant Performance Update Meeting June 6, 2002

';011 11'1 151!i!

I I 1 jj

~II. 1II 1l1' III ' III l jjlinli%!17W1!1:tII

!\\I1ll'I!

1 IIII

]III.I III I l11,11 i

iii,

il il

Agenda

  • Introduction-Brew Barron
  • Operational Performance-Dhiaa Jamil

- Generation Status Trending

- 2EOC14 Refueling Outage

- ALARA Performance

- Correct Component Verification

  • Miscellaneous-Bryan Dolan

- Corrective Action Program

- Special Nuclear Material

- Security 2

Operational Performance 3

McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o

LL.0 M

C-)

Cu

tf Q

M C.

CD 0

L-0 C-)

Cu E)

~0 wi ID-a 100% -

90% -

80% -

70% -

60%

50%

40%

30% -

20% -

10% -

rv==

Unit 2 (2.8 days)

Main Steam Pressure Trip Unit 2 (0.44 days)

Add Oil to 2B NCP 1EOC14 (38.2 days)

Cond. Boost Pmp Mtrs.

Busline Relay Mod Non-vital Spare Inverter (KXS to KXA)

Vital Inverters Replace.

Rx Vessel 1 0-year ISI CA Tank Tie-in 1 EOC15 (25 days)

Main Gen. Volt Reg.

No S/G Work 10W% Vessel Head Bare Metal Inspection 2EOC15 (30 days)

Rx Vessel 10-year ISI Main Gen. Volt Reg No S/G Work Unit. (3133 days)

SG Main FW Reg Valv -

failed capacitor TARGET REACTOR C.F. ('M l

-WELYACTUAL I

2EOC14 (32.3 days)

CA Tank Tlein.

Cond. Boost Prmp MI. 2C 1 D% Vessel Head Bare Metal Inspection 0%

I.

a 1U il' II 111 rI

] I 1 1 II T T ITI I :f

7 tD O -

N 0

OW4 N

Q (0

O?

(L 0

2 I-N4

....7..

a

.0C)

IL a) r7 I-0.

I5 N1 a

0)0a (U

M M

0)

M 7 <: Q

.q M )

to N

r N

-20022 N

r-N I II II I

FTT w

7u 0.<

tanu 11 1-111 111 IT

.. 1..11...1........

3 I

ClM 0

s 0w o>

0

-2003 1

2001 II II i 

Generation Status Trending 4

2EOC14 Refueling Outage 5

Completed Auxiliary Feedwater Storage Tank Tie In 6

Repaired CRDM K-8 Intermediate Canopy Seal Weld Intermediate Canopy Seal Approx. 6 ft.

Reactor Head 7

Performed 100% Bare Metal Head Inspection -

No Corrosion or Boron Found 8

r-..

9

Shutdown/Startup Performance Improvements

  • Tuning of process control system
  • Tuning of valve actuators
  • Sequencing of steam dump valves
  • Procedural improvements
  • Simulator and training improvements

ALARA Performance

  • Changes

- Step change in ALARA planning and scheduling

- Radiation Work Permit setpoint adjusted down to more effectively use dosimetry as ALARA tool

- Focused on radiation worker desired behavior prior to and during the outage

- PIP threshold changes 11

ALARA Performance (continued)

  • Results

- Desired worker behavior demonstrated

- Desired increase of PIPs at lower threshold was obtained

- Comprehensive self-assessment of outage radiation practices - complete 12

2 EOC1 4 Refueling Outage

  • Zero
  • Zero
  • Zero
  • 32 dc LERs events injuries jys 13

Correct Component Verification (CCV)

  • Defined specific behaviors associated with CCV
  • Created a CCV flag
  • Conducted classroom and flow loop scenario training
  • Targeted observations with CCV focus
  • 2EOC14 was completed without a CCV event
  • Similar focus on CCV is now underway in operations and chemistry 14

Miscellaneous 15

Corrective Action Program PIP Significance Categories ACA No Cause Analysis 16

Corrective Action Program

  • PIP Action Codes

- Corrective Actions to Prevent Recurrence (CAPR)

  • Directed at the Root Cause of Category I and 2 PIPS

- Corrective Actions (CA)

  • Directed at CAQ

- Elective / Enhancement Actions (ELEC)

- Structure helps focus corrective action effectiveness reviews on highest priority actions (CAPRs) 17

Special Nuclear Materials

  • Completed comprehensive inventory
  • No discrepancies 18

Security

m

  • No concerns about schedule for compliance with NRC order.

19

Questions 20