November 2003 Monthly Operating Report for Vermont Yankee
ML033500397
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 12/10/2003
From: Bronson K
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY-03-109
Download: ML033500397 (6)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Vermont Yankee PEn tergy 322 Governor Hunt Rd.

RO. Box 157 Vernon, VT 05354 Tel 802-257-7711 December 10, 2003 BVY-03-109 United States Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D.C. 20555

Reference:

(a) License No. DPR-28 (Docket No. 50-271)

In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of November, 2003.

Sincerely Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager

!-- 6;

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 03-11 FOR THE MONTH OF NOVEMBER 2003

OPERATING DATA REPORT DOCKETNO.50-271 DATE 031210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS

1. Unit Name: Vermont Yankee
2. Reporting Period: November
3. Licensed Thermal Power(MWt):1593
4. Nameplate Rating(Gross MWe): 540
5. Design Electrical Rating(Net MWe): 522
6. Maximum Dependable Capacity(Gross MWe): 535
7. Maximum Dependable Capacity(Net MWe): 510
8. If changes, occur in capacity ratings(Items Number 3 through 7) since
  • last report, give reasons:
9. Power level to which restricted, if any(Net MWe): N/A
10. Reasons for restrictions, if any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720.00 8016.00 274177.80
12. Number Of Hours Reactor was Critical 720.00 7908.39 231057.22
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 720.00 7868.91 227382.69
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated(MWH) 1142350.55 12418098.15 344798514.94
17. Gross Electrical Energy Generated(MWH) 393679.00 4246413.00 115827343.00
18. Net Electrical Energy Generated(MWH) 378082.00 4055001.00 110237360.00
19. Unit Service Factor 100.00 98.20 82.90
20. Unit Availability Factor 100.00 98.20 82.90
21. Unit Capacity Factor(Using MDC Net) 103.00 99.20 79.50
22. Unit Capacity Factor(Using DER Net) 100.60 96.90 77.90
23. Unit Forced Outage Rate 0.00 1.55 3.86
24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each: 04/03/2004 to 05/03/2004 for scheduled refueling outage.
25. If shut down at end of report period, estimated date of startup: N/A
26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)

DP 0411 Rev. 8 Page 1 of 1 RT No. 13.F01.19F

01. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 031210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
1. 528 17. 521
2. 528 18. 528
3. 527 19. 521
4. 528 20. 527
5. 527 21. 527
6. 527 22. 528
7. 524 23. 528
8. 517 24. 528
9. 525 25. 528
10. 527 26. 527
11. 528 27. 528
12. 528 28. 527
13. 528 29. 527
14. 528 30. 528
15. 524 31. ---
16. 486 INSTRUCTIONS:

On this format, list the average daily unit power level in MWE-Net for each day in the reporting month. Compute to the nearest whole megawatt.

VYDPF 0411.02 (Sample)

DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.18V

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH NOVEMBER DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 031210 COMPLETED BY G.A. Wallin TELEPHONE (802)258-5414 1 2 3 4 5 Cause and Corrective Action to Prevent No. Date Type Duration Reason Method of License System Component Recurrence.

Shutting Event Code Code (hours) Down Report #

Reactor (None) 1 F: Forced 2 Reason: 3 Method: 4 Exhibit G- Instructions S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparation of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License_

C-Refueling 3 - Automatic Scram Event Report (LER) File:

D-Regulatory Restriction 4 - Other (Explain) (NUREG 0161)

E-Operator Training and License Examination 5 Exhibit I - Same Source F-Administrative G-Operational Error (Explain)

H-(Explain) - VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1

DOCKET NO. 50-271 DATE 031210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH November

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.5% of rated thermal power for the month.

Gross electrical generation was 393,679 MWHe or 100.1% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 100.0%

of rated thermal power.

There were no items of interest to report for this month.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDPF 0411.04 (Sample)