ML030150538
| ML030150538 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/09/2003 |
| From: | Bronson K Entergy Nuclear Northeast, Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BVY-03-01 | |
| Download: ML030150538 (6) | |
Text
-Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Vermont Yankee 322 Governor Hunt Rd PO Box 157 Vernon, VT 05354 Tel 802-257-7711 January 09, 2003 BVY-03-01 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Reference:
(a) License No. DPR-28 (Docket No. 50-271)
In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of December, 2002.
Sincerely, Kevin H. Bropson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager k ý"" -,
4 a
-- t
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 02-12 FOR THE MONTH OF DECEMBER 2002
OPERATING DATA REPORT DOCKET NO.50-271 DATE 030109 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
- 1. Unit Name:
Vermont Yankee
- 2. Reporting Period:
December
- 3.
Licensed Thermal Power(MWt):1593
- 4. Nameplate Rating(Gross MWe): 540
- 5. Design Electrical Rating(Net MWe):
522
- 6.
Maximum Dependable Capacity(Gross MWe):
535
- 7.
Maximum Dependable Capacity(Net MWe):
510
- 8.
If changes, occur in capacity ratings(Items Number 3 through 7) since last report, give reasons:
- 9.
Power level to which restricted, if any(Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 8760.00 262968.00
- 12. Number Of Hours Reactor was Critical 744.00 8033.41 223148.83
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 7967.34 219513.78
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated(MWH) 1184510.30 12190332.61 332380416.79
- 17. Gross Electrical Energy Generated(MWH) 410233.00 4151341.00 111580930.00
- 18. Net Electrical Energy Generated(MWH) 394389.00 3962616.00 106182359.00
- 19. Unit Service Factor 100.00 91.00 82.50
- 20. Unit Availability Factor 100.00 91.00 82.50
- 21. Unit Capacity Factor(Using MDC Net) 103.90 88.70 78.90
- 22. Unit Capacity Factor(Using DER Net) 101.60 86.70 77.30
- 23. Unit Forced Outage Rate 0.00 0.00 3.94
- 24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each:
N/A
- 25.
If shut down at end of report period, estimated date of startup: N/A
- 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.F01.19F
AVERAGE DAILY UNIT POWER LEVEL MONTH DAY
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
16.
December AVERAGE DAILY POWER LEVEL (MWe-Net) 530 529 529 530 530 530 530 530 530 530 530 530 530 532 530 530 INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
DP 0411 Rev.
8 Page 1 of 1 RT No.
13.FO1.18V DOCKET NO.
50-271 UNIT Vermont Yankee DATE 030109 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 17.
530
- 18.
530
- 19.
530
- 20.
530
- 21.
530
- 22.
530
- 23.
530
- 24.
530
- 25.
530
- 26.
530
- 27.
530
- 28.
530
- 29.
530
- 30.
530
- 31.
530
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DECEMBER DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 50-271 Vermont Yankee 030109 G.A. Wallin (802)258-5414 1
F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-(Explain)-
3 Method:
1 -
Manual 2 - Manual Scram 3 - Automatic Scram 4 - Other (Explain) 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -
Same Source 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective (hours)
Shutting Event Code Code Action to Prevent Down Report #
Recurrence Reactor (None)
DOCKET NO.
50-271 DATE 030109 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH December
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.9 of rated thermal power for the month.
Gross electrical generation was 410,233 MWHe or 101.0% design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant of rated thermal power.
was operating at 99.9%
There were no items of interest to report for this month.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No.
13.FO1.18X