ML023240392

From kanterella
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Vermont Yankee
ML023240392
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/08/2002
From: Bronson K
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY-02-90
Download: ML023240392 (6)


Text

.

Enter gy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Vermont Yankee 322 Governor Hunt Rd PO Box 157 Vernon, Vr 05354 Tel 802-257-7711 November 08, 2002 BVY-02-90 United States Nuclear Regulatory Commission AT1N: Document Control Desk Washington, D.C. 20555

Reference:

(a) License No. DPR-28 (Docket No. 50-27 1)

In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of October, 2002.

Sincerely, Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 02-10 FOR THE MONTH OF OCTOBER 2002

OPERATING DATA REPORT DOCKET NO.50-271 DATE 021108 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS

1. Unit Name:
2.

Reporting Peri(

Vermont Yankee

)d:

October

3. Licensed Thermal Power(MWt):1593
4. Nameplate Rating(Gross MWe): 540
5. Design Electrical Rating(Net MWe):

522

6.

Maximum Dependable Capacity(Gross MWe):

7. Maximum Dependable Capacity(Net MWe):

535 510

8.

If changes, occur in capacity ratings(Items Number 3 through 7) since last report, give reasons:

9.

Power level to which restricted, if any(Net MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month

11. Hours in Reporting Period 745.00
12. Number Of Hours Reactor was Critical 274.53
13. Reactor Reserve Shutdown Hours 0.00
14. Hours Generator On-Line 235.64
15. Unit Reserve Shutdown Hours 0.00
16. Gross Thermal Energy Generated(MWH) 301436.90
17. Gross Electrical Energy Generated(MWH) 98674.00
18. Net Electrical Energy Generated(MWH) 93192.00
19. Unit Service Factor 31.63
20. Unit Availability Factor 31.63
21. Unit Capacity Factor(Using MDC Net) 24.50
22. Unit Capacity Factor(Using DER Net) 24.00
23. Unit Forced Outage Rate 0.00
24. Shutdowns scheduled over next 6 months(Type, Date, Each:

N/A Yr-to-Date Cumulative 7296.00 261504.00 6569.41 221684.83 0.00 0.00 6503.34 218049.78 0.00 0.00 9860781.11 330050865.29 3345608.00 110775197.00 3188023.00,105407766.00 89.10 82.40 89.10 82.40 85.70 78.80 83.70 77.20 0.00 3.96 and Duration of

25.

If shut down at end of report period, estimated date of startup: N/A

26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)

DP 0411 Rev.

8 Page 1 of 1 RT No. 13.FO1.19F

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-271 UNIT Vermont Yankee DATE 021108 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 MONTH October DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.

2.
3.

4.

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

16.

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

17.
18.

19.

461 460 460 462 198 0

0 0

0 0

0 0

0 0

0 0

20.
21.
22.
23.
24.
25.
26.
  • 27.
28.
29.
30.

31.

0 0

0 0

0 0

0 0

0 0

67 254 471 520 525

  • 25 hour2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> day INSTRUCTIONS:

On this format, for each day in megawatt.

list the average daily unit power level in MWE-Net the reporting month.

Compute to the nearest whole VYDPF 0411.02 (Sample)

DP 0411 Rev.

8 Page 1 of 1 RT No.

13.FO1.18V

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH OCTOBER 1

F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1 DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 2 Reason:

3 Method:

A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2 - Manual Scram C-Refueling 3 - Automatic Scram D-Regulatory Restriction 4 - Other (Explain)

E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

  • H-(Explain)- rod pattern adjustment 50-271 Vermont Yankee 021108 G.A. Wallin (802)258-5414 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -

Same Source 1

2 3

4 5

No.

Date Type Duration Reason Method of License System Component Cause and Corrective (hours)

Shutting Event Code Code Action to Prevent Down Report #

Recurrence Reactor 02-14 021005 S

509.36 B,C 1

N/A RB CONROD Shutdown for RFO-23 Refueling I

_outage 02-15 021029 S

0.00 H

4 N/A RB CONROD Rod pattern adjustment Power Reduction Al

DOCKET NO. 50-271 DATE 021108 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH October

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 25.3 of rated thermal power for the month.

Gross electrical generation was 98,674 MWHe or 24.2% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 93.0%

of rated thermal power.

021005 At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />, commenced a plant shutdown for the RFO-23 refueling.

(See Unit Shutdowns and Power Reductions) 021005 At 2320 hours0.0269 days <br />0.644 hours <br />0.00384 weeks <br />8.8276e-4 months <br />, the turbine-generator was removed from the grid.

021006 At 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br />, the reactor was sub-critical.

021025 At 1648 hours0.0191 days <br />0.458 hours <br />0.00272 weeks <br />6.27064e-4 months <br />, the reactor was critical.

(See Unit Shutdowns and Power Reductions) 021027 At 0235 hours0.00272 days <br />0.0653 hours <br />3.885582e-4 weeks <br />8.94175e-5 months <br />, the turbine-generator was phased to the grid and began a return to full power.

021029 At 1953 hours0.0226 days <br />0.543 hours <br />0.00323 weeks <br />7.431165e-4 months <br />, reduced power to 68% for a rod pattern adjustment.

(See Unit Shutdowns and Power Reductions) 021029 At 2128 hours0.0246 days <br />0.591 hours <br />0.00352 weeks <br />8.09704e-4 months <br />, completed a rod pattern adjustment and began a return to full power.

At the end of the reporting period the plant was operating at 99.7% of rated thermal power.

VYDPF 0411.04 (Sample)

DP 0411 Rev.

8 Page 1 of 1 RT No.

13.FO1.18X