SEn tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Vermont Yankee 322 Governor Hunt Rd RO. Box 157 Vernon, VT 05354 Tel 802-257-7711 August 08, 2002 BVY-02-58 United States Nuclear Regulatory Commission ATT'N: Document Control Desk Washington, D.C. 20555
Reference:
(a) license No. DPR-28 (Docket No. 50-27 1)
In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of July, 2002.
Sincerely, Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager J:ýCý
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 02-07 FOR THE MONTH OF JULY 2002
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee DATE 020808 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 MONTH July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
- 1.
420
- 17.
508
- 2.
508
- 18.
494
- 3.
512
- 19.
502
- 4.
509
- 20.
506
- 5.
505
- 21.
509
- 6.
506
- 22.
506
- 7.
506
- 23.
508
- 8.
505
- 24.
504
- 9.
507
- 25.
503
- 10.
507
- 26.
505
- 11.
508
- 27.
495
- 12.
508
- 28.
479
- 13.
506
- 29.
499
- 14.
501
- 30.
502
- 15.
504
- 31.
497
- 16.
505 INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
DP 0411 Rev.
8 Page 1 of 1 RT No.
13.FO1.18V
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JULY DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 020808 COMPLETED BY G.A. Wallin TELEPHONE (802)258-5414 1
F: Forced S: Scheduled VYDPF 0411.03 DP 0411 Rev.
8 Page 1 of 1 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-(Explain) 3 Method:
1 -
Manual 2
Other (Explain) 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I Same Source 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective (hours)
Shutting Event Code Code Action to Prevent Down Report #
Recurrence Reactor (None)
DOCKET NO.
50-271 DATE 020808 COMPLETED BY G.A.
WALLIN TELEPHONE (802)258-5414 REPORT MONTH July
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.1 of rated thermal power for the month.
Gross electrical generation was 395,046 MWHe or 97.2% design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 82.2%
of rated thermal power.
There were no items of interest to report for this month.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 (Sample)
DP 0411 Rev.
8 Page 1 of 1 RT No.
13.FO1.18X